Search NASA⌕ Search

Engineering topics

Meot, Francois

Publications and source records attributed to Meot, Francois.

At least 19 records

The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

SVD Orbit Correction in Zgoubi And Examples: SATURNE, RHIC, EIC RCS

This Tech. Note describes the SVD technique in the Lorentz force numerical solver zgoubi. It has been used as a tool to study the effect of vertical orbit perturbation on polarization transmission in RHIC, and for the study of the compensation of orbit defects resulting from stray fields in the EIC RCS.

43 PARTICLE ACCELERATORS↗

Design Status of the Electron-Ion Collider

The Electron-Ion Collider is gearing up for "Critical Decision 2", theproject baseline with defined scope, cost and schedule.Lattice designs are beingfinalized, and preliminary component design is being carried out. Beam dynamicsstudies such as dynamic aperture optimization, instability and polarizationstudies, and beam-beam simulations are continuing in parallel. We report onthe latest developments and the overall status of the project, and presentthe plans for future activities.

43 PARTICLE ACCELERATORS↗

Polarization Transport in the ERL-ERL FCC e + e - Collider

An alternative approach for the Future Circular electron-positron Collider uses energy recovery linac recirculators to mitigate the otherwise enormous power consumption needed to compensate 100 MW of beam energy losses by synchrotron radiation in a ring-ring design. This approach would also allow to extend CM energy to 500 GeV (or above) for double Higgs production. An additional advantage of the ERL-ERL scheme is its allowing polarized e + e - beam collision. A 100 km, 6250cell, 220 GeV loop is subjected to polarized bunch transport simulations. A linear Fixed Field Alternating gradient (FFA) design is also assessed as to spin transport.

43 PARTICLE ACCELERATORS↗

Beam and Spin Optics Simulation Tutorials, Using Zgoubi Exercises and Solutions 2 - RHIC Run 22 Spin Transparency Experiment

High electron and ion polarizations are paramount design requirements for the future Electron Ion Collider (EIC) at BNL. A “spin transparency” mode of operation, inherited from the “figure-8” ring design [1], allows preservation and control of electron and ion spin polarization in a collider or storage ring [2, 3]. It makes the ring lattice “invisible” to the spin and allows for polarization control by small quasi-static magnetic fields with practically no effect on beam orbital parameters. Beam polarization can then be fully controlled by small adjustments of snake axis orientation (a few degrees) and snake strengths (a few percent); polarization orientation at IPs can be controlled without spin rotators, spins can be adiabatically flipped without the need of ac magnets. The transparent spin mode has been demonstrated in simulations [2] for the purpose of being tested experimentally during RHIC Run 22. This experiment was aimed at providing data to validate the principles. Yellow RHIC ring (Fig. 1.1) was configured in the transparent spin mode by aligning the axes of its two helical snakes (located respectively in the 3 o’clock and 9 o’clock sextants) parallel to the longitudinal axis. Experiment goals and expected results, ad hoc procedures and hardware requirements, are addressed in Refs. [2, 3].

43 PARTICLE ACCELERATORS↗

Beam and Spin Optics Simulation Tutorials, Using Zgoubi

This tutorial is an introduction to the classical cyclotron, with some hints at spin dynamics, hands-on: by numerical simulation. It begins with a brief reminder of the historic context, and then introduces the theoretical material needed for the simulation exercises, which follow. Basic charge particle optics and acceleration concepts are addressed, including closed orbit in a cyclic accelerator, weak focusing in a dipole magnet, periodic transverse motion, revolution period and isochronism, voltage gap and resonant acceleration, the cyclotron equation.

43 PARTICLE ACCELERATORS↗

Radial-offset Optics in EIC Hadron Lattices: Trajectory Lengthening

This Tech. Note describes a method for a radial orbit offset in the arcs of the EIC hadron lattices, based on the perturbation dB/B of the magnetic field of the arc main bend magnets. This can be done independently for each arc (allowing multiple rigidities) and requires the use of pairs of orbit correctors at the extremities of the arc to ensure that the radially shifted orbit is on the zero-orbit (i.e. with the horizontal coordinates x = 0, p x = 0) at the exit and entry point of the respectively upstream and downstream interaction region (IR). The goal is to produce appropriate orbit lengthening as required for time of flight adjustments between the electron and hadron beams as part of EIC operations. An ad hoc parameter is introduced: a “geometric compaction factor” α B = (dC/C)/(dB/B), to quantify the orbit lengthening, or equivalently the radial orbit shift dR = R · α B · dB/B, from bending perturbation. Detailed numerical results are produced and discussed.

43 PARTICLE ACCELERATORS↗

Simulation of the CBETA 4-pass FFAG ERL using field maps — exclusively

The Cornell-BNL Electron Test Accelerator (CBETA), a four-pass, 150 MeV energy recovery linac (ERL), is now in construction at Cornell. Commissioning commenced on March 2019. A particularity of CBETA is that a single channel loop recirculates the four energies (42, 78, 114 and 150 MeV). The return loop arcs are based on fixed-field alternating gradient (FFAG) optics. The loop is comprised of 107 quadrupole-doublet cells, built using Halbach permanent magnet technology. Spreader and combiner sections (4 independent beam lines each) connect the 36 MeV linac to the FFAG arcs. We introduce here a start-to-end simulation of the 4-pass ERL, based entirely, and exclusively, on the use of magnetic field maps to model the optical components.

43 PARTICLE ACCELERATORS↗

Spin simulations in eRHIC Wien filter

This Technical Note introduces to a simulation of spin dynamics in a Wien filter used as a spin rotator, based on (i) the use of a semi-analytical model for the electrostatic and magnetostatic vectors and (ii) step-wise ray-tracing techniques. It shows that the method reproduces theoretical expectations.

43 PARTICLE ACCELERATORS↗

The ray-tracing code Zgoubi - latest developments

The reader is referred to the ICFA-BD-NL No.43, and to a more recent status article in NIMA, regarding the technical details of the Zgoubi tracking engine and its accuracy, which make it "near-symplectic" - sufficiently so to model millions of turns in large hadron colliders, - and its potential for pushing particles in complex accelerator structures and accelerator optical elements or their field maps. Extended documentation can be found in the regular FFA workshops as well as in the SourceForge code development site where in particular many examples of beam lines, FFAs and other ring simulations are maintained. There is also a comprehensive user's guide. Further documentation, including an attempt to demonstrate 6D simulation in all possible types of particle accelerators, can be found in the "Computer Laboratory" Stony Brook University "PHY689" semester series.

43 PARTICLE ACCELERATORS↗

Simulation of an FFA return channel ERL in a RHIC-based electron-ion collider

The linac-ring electron-ion collider designed at BNL is based on a 20 GeV ERL comprised of a 1.3 GeV linac and two 3.8km FFA lattice return loops placed along the RHIC heavy ion collider. This document introduces the simulation of the FFA ERL in Zgoubi, including a start-to-end 6-D simulation of the acceleration-deceleration cycle of a polarized electron bunch.

43 PARTICLE ACCELERATORS↗

RACCAM: An example of spiral sector scaling FFA technology

The RACCAM project prototyped a spiral sector, scaling FFA dipole. It was the rst of its kind and a major component in a rapid-cycling compact ring design for a multiple beam proton- therapy installation. A brief description introduces the project and the merits of spiral, scaling FFA technology. The article then focuses on the magnet design, eld measurements and their use in beam dynamics simulations carried out to validate the design.

43 PARTICLE ACCELERATORS↗

An ergodic approach to polarization in eRHIC electron storage ring

Electron polarization in a storage ring is subject to two long term effects: Sokolov-Ternov polarization and depolarization by diffusion, which over a long time scale lead to an equilibrium state. Simulation-wise, this can be highly CPU time and memory consuming. Simulations aimed at determining optimal ring storage energy in an electron-ion collider use to track thousand particle bunches, for a long time - yet still short compared to depolarization time scales, due to HPC limitations. Based on considerations of ergodicity of electron bunch dynamics in the presence of synchrotron radiation, tracking a single particle instead is investigated. This allows substantial saving in teh required HPC volume, “CPU-time×Memory-allocation”. The concept is illustrated with polarization lifetime and equilibrium polarization simulations at the eRHIC electron-ion collider.

43 PARTICLE ACCELERATORS↗

Beam dynamics validation of the Halbach Technology FFAG Cell for Cornell-BNL Energy Recovery Linac

The Cornell-BNL Electron Test Accelerator (CBETA), a 150 MeV energy recovery linac (ERL) now in construction at Cornell, employs a fixed-field alternating gradient optics return loop: a single beam line comprised of FFAG cells, which accepts four recirculated energies. CBETA FFAG cell uses Halbach permanent magnet technology, its design studies have covered an extended period of time supported by extensive particle dynamics simulations using computed 3-D field map models. As a result, this approach is discussed, and illustrated here, based on the final stage in these beam dynamics studies, namely the validation of a ultimate, optimized design of the Halbach cell.

43 PARTICLE ACCELERATORS↗