Search NASASearch

Engineering topics

Meshkat, Leila

Publications and source records attributed to Meshkat, Leila.

49 records · Page 3

A model to assess the Mars Telecommunications Network relay robustness

The relatively long mission durations and compatible radio protocols of current and projected Mars orbiters have enabled the gradual development of a heterogeneous constellation providing proximity communication services for surface assets. The current and forecasted capability of this evolving network has reached the point that designers of future surface missions consider complete dependence on it. Such designers, along with those architecting network requirements, have a need to understand the robustness of projected communication service. A model has been created to identify the robustness of the Mars Network as a function of surface location and time. Due to the decade-plus time horizon considered, the network will evolve, with emerging productive nodes and nodes that cease or fail to contribute. The model is a flexible framework to holistically process node information into measures of capability robustness that can be visualized for maximum understanding. Outputs from JPL's Telecom Orbit Analysis Simulation Tool (TOAST) provide global telecom performance parameters for current and projected orbiters. Probabilistic estimates of orbiter fuel life are derived from orbit keeping burn rates, forecasted maneuver tasking, and anomaly resolution budgets. Orbiter reliability is estimated probabilistically. A flexible scheduling framework accommodates the projected mission queue as well as potential alterations.

Mars Telecommunications Orbiter (MTO)

Overcoming obstacles to the exchange of information between risk tools

Our work to date in connecting risk tools hs had successes, but also has revealed there to be significant impediments to information exchange between them. These impediments stem from the well-known phenomenon of 'semantic dissonance' - mismatch between conceptual assumptions made by the separately developed tools. This issue represents a fundamental challenge that arises regardless of the mechanism of information exchange. This paper explains the issue and illustrates it with reference to our experiences to date connecting several risk tools. We motivate this work, present and discuss the solutions we have adopted to surmount these impediments, and the implications this work has for future efforts to integrate risk tools.

semantic dissonance

Probabilistic Risk Assessment for Concurrent, Conceptual Design of Space Missions

NASA is expanding its capability to perform PRA. This capability gives insight into the links of a suggested design and drives the refinement of the design by identifying optimal areas for investments. Clearly, it is more viable and less expensive to refine a design at the time that it is being conceived. Hence the utility of conducting PRA at the conceptual design phase. Concurrent engineering teams greatly reduce the design time and costs. However, there is currently no standardized means for building probabilistic risk models to assess risks associated with a design produced by such teams. The capability to produce a consistent and valid risk metric associated with such designs would greatly enhance the value of such design teams. This paper explains the experimental results obtained to date from building probabilistic risk models for sample studies conducted at the concurrent engineering design team at the Jet Propulsion Laboratory (TeamX).

conceptual designs

An Integrated Approach to Risk Assessment for Concurrent Design

This paper describes an approach to risk assessment and analysis suited to the early phase, concurrent design of a space mission. The approach integrates an agile, multi-user risk collection tool, a more in-depth risk analysis tool, and repositories of risk information. A JPL developed tool, named RAP, is used for collecting expert opinions about risk from designers involved in the concurrent design of a space mission. Another in-house developed risk assessment tool, named DDP, is used for the analysis.

defect detection and prevention (DDP)

Towards Risk Based Design for NASA's Missions

This paper describes the concept of Risk Based Design in the context of NASA s low volume, high cost missions. The concept of accounting for risk in the design lifecycle has been discussed and proposed under several research topics, including reliability, risk analysis, optimization, uncertainty, decision-based design, and robust design. This work aims to identify and develop methods to enable and automate a means to characterize and optimize risk, and use risk as a tradeable resource to make robust and reliable decisions, in the context of the uncertain and ambiguous stage of early conceptual design. This paper first presents a survey of the related topics explored in the design research community as they relate to risk based design. Then, a summary of the topics from the NASA-led Risk Colloquium is presented, followed by current efforts within NASA to account for risk in early design. Finally, a list of "risk elements", identified for early-phase conceptual design at NASA, is presented. The purpose is to lay the foundation and develop a roadmap for future work and collaborations for research to eliminate and mitigate these risk elements in early phase design.

Tumer, Irem Y.

Towards a systems approach to risk considerations for concurrent design

This paper describes the new process used by the Project Design Center at NASA's Jet Propulsion Laboratory for the identification, assessment and communication of risk elements throughout the lifecycle of a mission design. This process includes a software tool, 'RAP' that collects and communicates risk information between the various designers and a 'risk expert' who mediates this process. The establishment of this process is an attempt towards the systematic consideration of risk in the design decision making process. Using this process, we are able to better keep track of the risks associated with the design decisions. Furthermore, it helps us develop better risk profiles for the studies under consideration. We aim to refine and expand the current process to enable more thorough risk analysis capabilities in the future.

concurrent design

Requirements based system risk modeling

The problem that we address in this paper is assessing the expected degree of success of the system or mission based on the degree to which each requirement is satisfied and the relative weight of the requirements. We assume a complete list of the requirements, the relevant risk elements and their probability of occurrence and the quantified effect of the risk elements on the requirements. In order to assess the degree to which each requirement is satisfied, we need to determine the effect of the various risk elements on the requirement.

risk

Requirements based system level risk modeling

The problem that we address in this paper is assessing the expected degree of success of the system or mission based on the degree to which each requirement is satisfied and the relative weight of the requirements.

risk

Risk based decision tool for space exploration missions

This paper presents an approach and corresponding tool to assess and analyze the risks involved in a mission during the pre-phase A design process. This approach is based on creating a risk template for each subsystem expert involved in the mission design process and defining appropriate interactions between the templates.

space exploration proposals