Search NASASearch

Engineering topics

Messidoro, Piero

Publications and source records attributed to Messidoro, Piero.

Space simulation techniques and facilities for SAX STM test campaign

SAX is a satellite for X-Ray astronomy. It is a major element of the overall basic Science Program of the Italian Space Agency (ASI) and is being developed with the contribution of the Netherlands Agency for Aerospace Programs (NIVR). The scientific objectives of SAX are to carry out systematic and comprehensive observations of celestial X-Ray sources over the 0.1 - 300 KeV energy range with special emphasis on spectral and timing measurements. The satellite will also monitor the X-Ray sky to investigate long-term source variability and to permit localization and study of X-Ray transients. Alenia Spazio is developing the satellite that is intended for launch in the second half of 1995 in a low, near-equatorial Earth orbit. At system level a Structural Thermal Model (STM) has been conceived to verify the environmental requirements by validating the mechanical and thermal analytical models and qualifying satellite structure and thermal control. In particular, the following tests have been carried out in Alenia Spazio, CEA/CESTA and ESTEC facilities: Modal Survey, Centrifuge, Acoustic, Sinusoidal/Random Vibration and Thermal Balance. The paper, after a short introduction of the SAX satellite, summarizes the environmental qualification program performed on the SAX STM. It presents test objectives, methodologies and relevant test configurations. Peculiar aspects of the test campaign are highlighted. Problems encountered and solutions adopted in performing the tests are described as well. Furthermore, test results are presented and assessed.

Giordano, Pietro

System test approach for the SAX satellite

SAX satellite verification is based on a protoflight approach, in which only one system model is realized at flight standard level, taking into account the utilization of hardware already qualified for other space programs and the necessity to respect the schedule constraints for a scientific objective. In any case, this approach was tailored with some deviations in order to reduce risks inherent in such a choice. The protoflight approach was also pursued at subsystem/unit level in particular for those subsystems and units considered critical from the schedule point of view. Payload Instruments followed the same approach but complete spare units were developed to reduce the risks associated with such an approach. A description of the model philosophy is provided and then, at satellite level, the testing approach and rationale for each model is presented. Finally, a brief description of each test will be given, highlighting objectives, methodologies, and test configurations. Moreover, for the major tests, problems encountered and solutions applied in establishing a correct approach are described.

Giordano, Pietro

Magnetic cleanliness verification approach on tethered satellite

Magnetic cleanliness testing was performed on the Tethered Satellite as the last step of an articulated verification campaign aimed at demonstrating the capability of the satellite to support its TEMAG (TEthered MAgnetometer) experiment. Tests at unit level and analytical predictions/correlations using a dedicated mathematical model (GANEW program) are also part of the verification activities. Details of the tests are presented, and the results of the verification are described together with recommendations for later programs.

Messidoro, Piero

IRIS thermal balance test within ESTEC LSS

The Italian Research Interim Stage (IRIS) thermal balance test was successfully performed in the ESTEC Large Space Simulator (LSS) to qualify the thermal design and to validate the thermal mathematical model. Characteristics of the test were the complexity of the set-up required to simulate the Shuttle cargo bay and allowing IRIS mechanism actioning and operation for the first time in the new LSS facility. Details of the test are presented, and test results for IRIS and the LSS facility are described.

Messidoro, Piero

Columbus pressurized module verification

The baseline verification approach of the COLUMBUS Pressurized Module was defined during the A and B1 project phases. Peculiarities of the verification program are the testing requirements derived from the permanent manned presence in space. The model philosophy and the test program have been developed in line with the overall verification concept. Such critical areas as meteoroid protections, heat pipe radiators and module seals are identified and tested. Verification problem areas are identified and recommendations for the next development are proposed.

Messidoro, Piero