Search NASA⌕ Search

Engineering topics

Michael B. Chappell

Publications and source records attributed to Michael B. Chappell.

Human Mars Surface Mission Surface Power Impacts on Timeline and Traverse Capabilities

The National Aeronautics and Aerospace Administration’s (NASA) Mars Architecture Team (MAT) developed a concept for power management operations to support a thirty-day, minimal infrastructure Mars surface mission. The surface elements in this minimal surface mission concept include three landers as platforms for surface operations, a crewed Mars ascent vehicle (MAV), an unpressurized rover, and a pressurized rover where the crew will live for the duration of the thirty-day mission. In this analysis the power system is a ten kilowatt fission power system, which has been selected for its resiliency to dust storms, and will provide power for all aspects of the surface mission including thermal management of propellant and electronic systems, communications, and battery recharge of mobile surface assets. Developing a power management plan with the consideration of the various elements and mission phases helps define the traverse and exploration capabilities for the crew in the pressurized rover. Also, considerations need to be made for the different power requirements for each phase of the surface mission including arrival, offload, surface exploration, launch preparation, and departure. The described analysis aims to achieve a balance of maintaining power to critical systems while enabling desired traverse and exploration range in the pressurized rover. Additionally, a few enhancing technologies were explored that could expand the power capability if the additional capacity is necessary in the future. This study is used as a baseline to understand the constraints on all aspects of the surface mission for a minimal surface infrastructure human Mars campaign if a ten-kilowatt fission surface power system is available on the surface.

Michael B. Chappell↗

Characterization of in-Space Propulsion Trade Space to Support Initial Human Mars Segment

The National Aeronautics and Space Administration’s Exploration Systems Development Mission Directorate has been developing architecture concepts for human missions to Mars in alignment with the agency’s Moon to Mars blueprint objectives. The focus of the Architecture Development Office has been to decompose the blueprint objectives into the characteristics and needs for both lunar and Mars missions and develop functional needs to enable an integrated end-to-end mission architecture. One of the key components of a human Mars mission is the in-space transportation system that delivers crew and cargo to Mars vicinity and return crew safely back to Earth. The Mars Architecture Team has been evaluating four in-space transportation options to satisfy this functional need: 1) Hybrid Nuclear Electric/ Chemical Propulsion, 2) Nuclear Thermal Propulsion, 3) Hybrid Solar Electric/ Chemical Propulsion, and 4) All-Chemical propulsion. To answer the question “which transportation option is best?” decision makers will need to understand the performance characteristics—and limitations—for each architecture in the context of their preferred metric. Each option could be considered “better” than the others, depending on whether the primary selection criteria is fast, cheap, maximum cross-government applicability, maximizes commercial capabilities, and/or any other desired metrics. The Mars Architecture Team has completed considerable analysis on the Hybrid Nuclear Electric/Chemical Propulsion concept over the past three years. The Space Nuclear Propulsion program has also conducted significant work on the Nuclear Thermal Propulsion concept. The Hybrid Solar Electric/Chemical Propulsion concept, derived from technology planned for the Gateway program, was originally configurated for minimum vehicle stack mass (and, hence, minimum Earth-launched mass/cost), leveraging a highly efficient propulsion system on a minimum energy Conjunction Class trajectory. Historically, All-Chemical concepts were considered impractical due to the enormous propellant mass required, even for minimum energy Conjunction Class/long stay mission opportunities. However, considering the emerging commercial heavy-lift capabilities, the concept must be reevaluated across a range of concepts that leverage reusable launch vehicle capabilities to reduce the cost of launching large quantities of transportation elements needed for missions of various duration. This paper aims to provide an overview of the in-space transportation assessment work that is on-going within NASA.

Mars↗

Expanding a Family of Mars Chemical Transportation Elements with a Large Vertical Lander Concept

In characterizing the trade space available for enabling human Mars missions, NASA’s Mars Architecture Team (MAT) has continues to developed a collection of concepts to assess the capabilities and constraints presented by a family of large Mars Chemical Transportation Elements (MACHETE). The purpose of this paper is to extend the MACHETE family with a new Large Vertical Lander (LVL) concept to increase our knowledge of the transportation trade space. The LVL is designed as a dedicated lander system capable of delivering a separate Mars Ascent Vehicle (MAV) fully-fueled to the surface of Mars. The addition of this concept enables exploring architecture alternatives that do not require either in-situ ascent propellant production or pre-deployment and subsequent surface transfer of ascent propellant.

Campaign↗