Search NASA⌕ Search

Engineering topics

Middendorf, Mark E.

Publications and source records attributed to Middendorf, Mark E..

Status of the ITER Ion Cyclotron H&CD

The ITER Ion Cyclotron Heating and Current Drive system (IC H&CD) is designed to deliver 20MW to a broad range of plasma scenarios between 40 and 55MHz, during very long pulses. It consists of two broadband equatorial port plug antennas, their pre-matching and matching systems, transmission lines, Radio Frequency (RF) Sources and High Voltage Power Supplies. The overall project schedule has been revised and agreed by ITER Council; it re-integrates the second antenna and its power supplies in construction baseline and sets the dates for progressive installation with DT phase planned in 2035. Recent progress on ICRF subsystems is reported, covering design evolution, qualification of test articles and specific R&D results in domestic agencies, suppliers, associated laboratories and IO.

Agarwal, Rohit↗

A New 2.5 MeV Injector and Beam Test Facility for the Spallation Neutron Source

The U.S. Spallation Neutron Source (SNS) now operates with 1.2 MW of beam power on target with the near-term goal of delivering 1.4 MW and a longer-term goal of delivering >2 MW to support a planned second target station. Presently, H- beam pulses (50-60 mA, 1 ms, 60 Hz) from an RF-driven, Cs-enhanced, multi-cusp ion source are first accelerated to 2.5 MeV by a Radio Frequency Quadrupole (RFQ) accelerator, injected into a ~1 GeV linac, compressed to <1μs in an accumulator ring and ultimately delivered to a liquid mercury target for pulsed neutron production. In recent years concerns about the RFQ performance has motivated the procurement of a new RFQ and the creation of a Beam Test Facility (BTF) to allow off-line testing. The purpose of the BTF is to first validate performance of the new RFQ before installing it in place of the existing RFQ and later to serve as a stand-alone 2.5 MeV research accelerator employing the original SNS RFQ. After validating the new RFQ with respect to energy, emittance and transmission, the initial applications of the BTF will be to conduct 6D beam dynamic studies, develop & demonstrate ion sources capable of meeting the current and future requirements of the SNS, and contribute to neutron moderator development. This report provides a facility update, description of the BTF ion source systems as well as a discussion of the first LEBT and RFQ beam current measurements performed at the BTF.REFERENCES

Welton, Robert F.↗

Technical Design Report, Second Target Station

The Second Target Station (STS) is a proposed upgrade for SNS. It includes a doubling of the accelerator power and an additional instrument hall. The new instrument hall will receive a 467 kW 10 Hz beam. The parameters and preliminary design aspects of the STS are presented for the accelerator, target systems, instrument hall, instruments and civil construction aspects.

43 PARTICLE ACCELERATORS↗