Search NASASearch

Engineering topics

Miller, E. F.

Publications and source records attributed to Miller, E. F..

At least 19 records

An assessment of the status and trends in satellite communications 1986-2000: An information document prepared for the Communications Subcommittee of the Space Applications Advisory Committee

This is a response to a Space Applications Advisory Committee (SAAC) request for information about the status and trends in satellite communications, to be used to support efforts to conceive and recommend long range goals for NASA communications activities. Included in this document are assessments of: (1) the outlook for satellite communications, including current applications, potential future applications, and impact of the changing environment such as optical fiber networks, the Integrated Services Digital Network (ISDN) standard, and the rapidly growing market for Very Small Aperture Terminals (VSAT); (2) the restrictions imposed by our limited spectrum resource; and (3) technology needs indicated by future trends. Potential future systems discussed include: large powerful satellites for providing personal communications; VSAT compatible satellites with onboard switching and having voice capability; large satellites which offer a pervasive T1 network service (primarily for video-phone); and large geostationary communications facilities which support common use by several carriers. Also, discussion is included of NASA particular needs and possible future systems. Based on the mentioned system concepts, specific technology recommendations are provided for the time frames of now - 1993, 1994 - 2000, and 2000 - 2010.

Poley, W. A.

Impact of the 1985 space World Administrative Radio Conference on frequency/orbit planning and use

The 1985 World Administrative Radio Conference (WARC-ORB-85) was held to determine which space radio services should be planned and which planning methods should be used. The second session of this Conference (WARC-ORB-88) will meet to develop the required plans. This paper presents the results of WARC-ORB-85, assesses the impact of those decisions, and identifies the intersessional work to be conducted by administrations and the CCIR (consultative Committee on International Radio). The major decisions of WARC-ORB-85 were: (1) the restriction of additional planning to the fixed satellite service at identified frequencies; and (2) the selection of a planning method consisting of two parts: (a) an allotment plan, and (b) improved procedures. The paper also discusses WARC-ORB-85 decisions relative to the Region 2 broadcast satellite service plans at 12 GHz, feederlink planning for Regions 1 and 3 broadcast satellites at 12 GHz, and sound broadcast satellite service.

Miller, E. F.

An analysis of bi-directional use of frequencies for satellite communications

The bi-directional use of frequencies allocated for space communications has the potential to double the orbit/spectrum capacity available. The technical feasibility of reverse band use (RBU) at C-band (4 GHz uplinks and 6 GHz downlinks) is studied. The analysis identifies the constraints under which both forward and reverse band use satellite systems can share the same frequencies with terrestrial, line of sight transmission systems. The results of the analysis show that RBU satellite systems can be similarly sized to forward band use (FBU) satellite systems. In addition, the orbital separation requirements between RBU and FBU satellite systems are examined. The analysis shows that a carrier to interference ratio of 45 dB can be maintained between RBU and FBU satellites separated by less than 0.5 deg, and that A carrier to interference ratio of 42 dB can be maintained in the antipodal case. Rain scatter propagation analysis shows that RBU and FBU earth stations require separation distances of less than 10 km at a rain rate of 13.5 mm/hr escalating to less than 100 km at a rain rate of 178 mm/hr for earth station antennas in the 3 to 10 m range.

Whyte, W. A., Jr.

An analysis of bi-directional use of frequencies for satellite communications

The bi-directional use of frequencies allocated for space communications has the potential to double the orbit/spectrum capacity available. The technical feasibility of reverse band use (RBU) at C-band (4 GHz uplinks and 6 GHz downlinks) is studied. The analysis identifies the constraints under which both forward and reverse band use satellite systems can share the same frequencies with terrestrial, line of sight transmission systems. The results of the analysis show that RBU satellite systems can be similarly sized to forward band use (FBU) satellite systems. In addition, the orbital separation requirements between RBU and FBU satellite systems are examined. The analysis shows that a carrier to interference ratio of 45 dB can be maintianed between RBU and FBU satellites separated by less than 0.5 deg., and that a carrier to interference ratio of 42 dB can be maintained in the antipodal case. Rain scatter propagation analysis shows that RBU and FBU Earth stations require separation distances fo less than 10 km at a rain rate of 13.5 mm/hr escalating to less than 100 km at a rain rate of 178 mm/hr for Earth station antennas in the 3 to 10 m range.

Whyte, W. A., Jr.

Impact of the 1985 Space World Administrative Radio Conference on frequency/orbit planning and use

The 1985 World Administrative Radio Conference (WARC-ORB-85) was held to determine which space radio services should be planned and which planning methods should be used. The second session of this Conference (WARC-ORB-88) will meet to develop the required plans. This paper presents the results of WARC-ORB-85, assesses the impact of those decisions, and identifies the intersessional work to be conducted by administrations and the CCIR (Consultative Committee on International Radio). The major decisions of WARC-ORB-85 were: (1) the restriction of additional planning to the fixed satellite service at identified frequencies; and (2) the selection of a planning method consisting of two parts (a) an allotment plan, and (b) improved procedures. The paper also discusses WARC-ORB-85 decisions relative to the Region 2 broadcast satellite service plans at 12 GHz, feederlink planning for Regions 1 and 3 broadcast satellites at 12 GHz, and sound broadcast satellite service.

Miller, E. F.

An analysis of bidirectional use of frequencies for satellite communications

The bi-directional use of frequencies allocated for space communications has the potential to double the orbit/spectrum capacity available. The technical feasibility of reverse band use (RBU) at C-band (4 GHz uplinks and 6 GHz downlinks) is studied. The analysis identifies the constraints under which both forward and reverse band use satellite systems can share the same frequencies with terrestrial, line of sight transmission systems. The results of the analysis show that RBU satellite systems can be similarly sized to forward band use (FBU) satellite systems. In addition, the orbital separation requirements between RBU and FBU satellite systems are examined. The analysis shows that a carrier to interference ratio of 45 dB can be maintained between RBU and FBU satellites separated by less than 0.5 deg., and that a carrier to interference ratio of 42 dB can be maintained in the antipodal case. Rain scatter propagation analysis shows that RBU and FBU earth stations require separation distances of less than 10 km at a rain rate of 13.5 mm/hr escalating to less than 100 km at a rain rate of 178 mm/hr for earth station antennas in the 3 to 10 m range.

Whyte, W. A., Jr.

Development and use of the computer software package for planning the 12 GHz broadcasting-satellite service at RARC '83

The 1983 Regional Administrative Radio Conference (RARC '83) had mainly the objective to draw up a plan of detailed frequency assignments and orbital positions for the 12 GHz broadcasting-satellite service (BSS) in ITU Region 2 (the Western Hemisphere) and associated feeder links (earth-to-space) in the 17 GHz band. It was found that for RARC '83 new planning methods and procedures would be needed. The new requirements made it necessary to develop a new generation of planning software. Attention is given to the development of the computer programs to be used at the conference, the package of computer programs, and the use of the computer programs.

Bowen, R. R.

Broadcasting satellites at 12 GHz for Region 2: Technical characteristics

Technical parameters such as satellite antenna characteristics, Earth station requirements, bandwidths, channelization, and allowable carrier-to-interference ratios are discussed. An overview of the downlink plan is given, including a histogram of the transmitter power requirements. The plan includes satellite orbit positions, spacecraft transmitted powers, antennas beam sizes, channel assignments, and polarizations.

Miller, E. F.

Spectrum/orbit utilization program for geostationary satellites

Mutual interferences among geostationary satellite communication systems determine the permitted spacing between satellites and the limits on the capacity of the orbit/spectrum resources available. This paper describes the computer program for analyzing the mutual interferences among communication satellite systems. Capabilities of the program are described. Inputs, models used, program operations, and program outputs are given. To show application of the program, an example scenario is analyzed for fixed satellites providing domestic service to North America.

Miller, E. F.

Capabilities, limitations, and use of BC SAT-R2 conference software

The computer software developed for the BC SAT-R2 Conference has certain capabilities and limitations which are described. Capabilities of each major program element are addressed with respect to providing the required functions for planning and output reporting. Limitations arise from the inability to exactly represent certain systems that may be examined. Expected use of the software package during the Conference is outlined.

Miller, E. F.

Technical characteristics of the broadcasting satellite plan at 12 GHz for the Western Hemisphere

Technical parameters such as satellite antenna characteristics, earth station requirements, bandwidths, channelization, and allowable carrier-to-interference ratios are discussed. An overview of the downlink plan is given, including a histogram of the transmitter power requirements. The plan includes satellite orbit positions, spacecraft transmitted powers, antennas beam sizes, channel assignments, and polarizations.

Miller, E. F.

Geometric models, antenna gains, and protection ratios as developed for BC SAT-R2 conference software

Mathematical models used in the software package developed for use at the 1983 Regional Administrative Radio Conference on broadcasting satellites. The models described are those used in the Spectrum Orbit Utilization Program (SOUP) analysis. The geometric relationships necessary to model broadcasting satellite systems are discussed. Antenna models represent copolarized and cross polarized performance as functions of the off axis angle. The protection ratio is modelled as a co-channel value and a template representing systems with frequency offsets.

Miller, E. F.

Carrier-interference ratios for frequency sharing between frequency-modulated amplitude-modulated-vestigial-sideband television systems

For just perceptible interference, an FM television signal interfering with another FM television signal must have an average signal power that is 26 to 37 db less than the wanted signal power. For an AM-VSB television signal interfering with an FM television signal, the AM-VSB television's sync peak average power must be 18 to 31 db below the FM television signal's average power. Also, when an FM television signal interferes with an AM-VSB signal, the average signal power of the FM signal should be 56 to 59 db below the sync peak average power of the AM-VSB television signal. The range of power ratios occur as a result of different TV scenes used in the tests and different FM-signal frequency deviations used. All tests were performed using 525 line, system M, color-television signals.

Barnes, S. P.

Performance characteristics of the 12 GHz, 200 watt transmitter experiment package for CTS

The experiment package consists of a 200 W output stage tube (OST) powered by a power processing system (PPS). Descriptions of both the PPS and OST are given. The PPS provides the necessary voltages with a measured dc/dc conversion efficiency of 89 percent. The OST, a traveling wave tube with multiple collectors, has a saturated rf output power of 224 W and operates at an overall efficiency exceeding 40 percent over an 85 MHz bandwidth at 12 GHz. OST performance given includes frequency response, saturation characteristics, group delay, AM to PM conversion, inter-modulation distortion, and two channel gain suppression. Single and dual channel FM video performance is presented. It was determined that for 12 MHz peak to peak frequency deviation on each channel, dual channel FM television signals can be transmitted through the TEP at 60 W, each channel, with 40 MHz channel spacing (center to center).

Miller, E. F.

Performance characteristics of the 12 GHz, 200 watt Transmitter Experiment Package for CTS

Measured performance characteristics from ground test of the Transmitter Experiment Package (TEP) for the Communications Technology Satellite are presented. The experiment package consists of a 200 W Output Stage Tube (OST) powered by a Power Processing System (PPS). Descriptions of both the PPS and OST are given. The PPS provides the necessary voltages with a measured dc/dc conversion efficiency of 89 per cent. The OST, a traveling wave tube with multiple collectors, has a saturated rf output power of 224 W and operates at an overall efficiency exceeding 40 per cent over an 85 MHz bandwidth at 12 GHz. OST performance given includes frequency response, saturation characteristics, group delay, AM to PM conversion, intermodulation distortion, and two channel gain suppression. Single and dual channel FM video performance is presented. It was determined that for 12 MHz peak to peak frequency deviation on each channel, dual channel FM television signals can be transmitted through the TEP at 60 W, each channel, with 40 MHz channel spacing (center to center).

Miller, E. F.

Factors affecting frequency and orbit utilization by high power transmission satellite systems.

The factors affecting the sharing of the geostationary orbit by high power (primarily television) satellite systems having the same or adjacent coverage areas and by satellites occupying the same orbit segment are examined and examples using the results of computer computations are given. The factors considered include: required protection ratio, receiver antenna patterns, relative transmitter power, transmitter antenna patterns, satellite grouping, and coverage pattern overlap. The results presented indicate the limits of system characteristics and orbit deployment which can result from mixing systems.

Kuhns, P. W.

Factors affecting frequency and orbit utilization by high power transmission satellite systems

The factors affecting the sharing of the geostationary orbit by high power (primarily television) satellite systems having the same or adjacent coverage areas and by satellites occupying the same orbit segment are examined and examples using the results of computer computations are given. The factors considered include: required protection ratio, receiver antenna patterns, relative transmitter power, transmitter antenna patterns, satellite grouping, and coverage pattern overlap. The results presented indicated the limits of system characteristics and orbit deployment which can result from mixing systems.

Kuhns, P. W.