Search NASA⌕ Search

Engineering topics

Millstein, Dev

Publications and source records attributed to Millstein, Dev.

At least 37 records · Page 2

Characterizing the Geothermal Lithium Resource at the Salton Sea

The energy transition towards a more sustainable and renewable future is a pivotal global endeavor. Central to this shift for the United States is the critical role of domestically sourced lithium, a key mineral in the production of high-performance batteries essential for electric vehicles and renewable energy storage systems. This has driven the United States to invest heavily in a domestic supply chain for batterygrade lithium to enhance energy security, reduce supply chain vulnerabilities, and foster economic growth by tapping into local resources. A notable example is the Biden Administration’s “American Battery Materials Initiative,” which was included in the $2.8-billion Bipartisan Infrastructure Law (The White House, 2022).

25 ENERGY STORAGE↗

Land-Based Wind Market Report: 2023 Edition

Wind power additions in the United States totaled 8.5 gigawatts (GW) in 2022. Wind power growth has historically been supported by the industry’s primary federal incentive—the production tax credit (PTC)—as well as myriad state-level policies. Long-term improvements in the cost and performance of wind power technologies have also been key drivers for wind additions. Nonetheless, 2022 was a relatively slow year in terms of new wind power deployment—the lowest since 2018—due in part to ongoing supply chain pressures, higher interest rates, and interconnection and siting challenges, but also the reduction in the value of the PTC that was in place up until the passage of the Inflation Reduction Act (IRA) in August 2022.

17 WIND ENERGY↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Land-Based Wind Market Report: 2022 Edition

The U.S. Department of Energy's 2022 edition of its Land-Based Wind Market Report provides an overview of key trends in the U.S. wind power market, with a focus on 2021. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Despite ongoing supply chain challenges, wind energy in 2021 continued to see strong growth, technology improvements, and low prices in the U.S. Key highlights include: Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a strong pace in 2021, with the 13.4 GW of new additions representing a $\$20$ billion investment and 32% of all newly added U.S. generation capacity. Wind energy output rose to account for more than 9% of the entire nation’s electricity supply. At least 247 GW of wind are seeking transmission interconnection; 77 GW of this capacity are offshore wind and 19 GW are hybrid plants that pair wind with storage or solar PV. Wind project performance has increased over the decades: The average capacity factor among recently built projects was nearly 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2011, no turbines employed blades that were 115 meters in diameter or larger, but in 2021, 89% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices averaged $\$800$–$\$950$/kW in 2021, a 5% to 10% increase from the year prior but substantially lower than in 2010. The average installed cost of wind projects in 2021 was $\$1,500$/kW, down more than 40% since the peak in 2010, though relatively stable in recent years. The lowest costs were found in Texas and the (non-ISO) West. Wind energy prices are on the rise, but generally remain low, around $\$20$/MWh in the interior of the country with higher prices in the West and East. After topping out above $\$75$/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped—though supply-chain pressures have resulted in increased prices in recent years. In the interior ‘wind belt’ of the country, recent pricing is around $\$20$/MWh. In the West and East, prices tend to average above $\$30$/MWh. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind increased in 2021, averaging $\$16$/MWh in MISO, $\$19$/MWh in SPP, $\$23$/MWh in NYISO, $\$31$/MWh in ERCOT, $\$33$/MWh in PJM, $\$44$/MWh in ISO-NE, and $\$48$/MWh in CAISO. The average levelized cost of wind energy was $\$32$/MWh for plants built in 2021: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography. The national average stood at $\$32$/MWh in 2021—down substantially historically, though relatively stable in recent years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. The health and climate benefits of wind in 2021 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of over $\$90$/MWh-wind for plants built in 2021.

17 WIND ENERGY↗

Empirical Estimates of Transmission Value using Locational Marginal Prices [Slides]

This study focuses on one potential benefit of transmission infrastructure—congestion relief. It explores historical grid conditions from 2012 through the first half of 2022, and evaluates the marginal value of transmission in facilitating trade within and across regional boundaries by calculating differences in observed nodal wholesale power prices. The study finds that wholesale power prices exhibit stark geographic differences that, in many cases, are stable over time. Many regional and interregional transmission links have significant potential economic value from reducing congestion and expanding opportunities for trade. In fact, many links have hourly average pricing differences in 2021 that exceeded $\$15$/MWh—equivalent to $130 million per year for a 1000 MW link. The value of transmission is correlated with overall energy prices and varies by region and year. Critically, extreme conditions and high-value periods play an outsized role in the value of transmission, with 50% of transmission’s congestion value coming from only 5% of hours. Transmission planners run the risk of understating the benefits of regional and interregional transmission if extreme conditions and high-value periods are not adequately considered. These periods are natural features of actual market operations. As such, the study highlights the need for planners to more-comprehensively assess the value of transmission under both normal and extreme conditions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Limitations of reanalysis data for wind power applications

Wind energy resource estimates commonly depend on simulated wind speed profiles generated by reanalysis or weather models due to the lack of long time series measurements with sufficient coverage at relevant heights (roughly 90 m above ground). However, modeled data, including reanalyses, can be noisy and display a wide range of biases and errors, variously attributed to terrain effects, poor coverage of assimilated inputs, and model resolution. Wind generation records, if available at high temporal and geographical resolution, can provide a proxy for wind measurements and allow for evaluation of reanalyses and weather model wind time series. We use a 7-year-long data set of hourly, plant-level generation records from over 100 wind plants across Texas to evaluate two commonly used reanalysis data sets (MERRA2 and ERA5). Additionally, we use 1-year of records (2019) to evaluate an operational, high-resolution regional weather modeling product (HRRR v3). We find that across the region, and across all modeling products, the modeled representation of wind generation (i.e., wind speeds at hub heights passed through a power curve) has relatively small mean errors when aggregated daily, but that accuracy and hourly correlation have a strong diurnal sensitivity. Accuracy and correlation systematically decline through the evening and markedly improve after sunrise. These diurnal patterns persist even in the highest resolution model tested (HRRR v3). We hypothesize the nighttime decline in accuracy is mostly due to poorly represented boundary layer conditions, perhaps related to model representation of stability, while other uncertainties (such as wake effects) play a secondary role.

17 WIND ENERGY↗

Batteries Included: Top 10 Findings from Berkeley Lab Research on the Growth of Hybrid Power Plants in the United States

One of the most important electric power system trends of the 2010s was the rapid deployment of wind turbines and photovoltaic arrays, but a twist for the 2020s may be the rapid deployment of ‘hybrid’ generation resources. Hybrid power plants typically combine solar or wind (or other energy sources) with co-located storage. While hybridization helps to ease the challenge of balancing variable supply and demand, its relative novelty means that research is needed to facilitate integration and promote innovation. Combining the characteristics of multiple energy, storage, and conversion technologies poses complex questions for grid operations and economics. Project developers, system operators, planners, and regulators would benefit from better data, methods, and tools to estimate the costs, values, and system impacts of hybrid projects. This publication showcases some of Berkeley Lab’s robust research program intended to support private- and public-sector decision-making about hybrid plants in the United States. Our short briefing summarizes articles that we published between 2020 and 2022, links to the in-depth reports, and provides contact details for further engagement on the specific research topics: Growth: Developer interest in hybrid power plants is strong and growing Price vs. Value: PV+storage hybrids have low PPA prices and high value in some regions Market Drivers: Solar hybridization is driven by tax credits and other benefits Configuration Choices: Market prices have incentivized shorter duration batteries with PV Capacity Value: The capacity contribution of a hybrid is less than the sum of its parts Ancillary Services: AS markets are a valuable yet fleeting option for hybrids Market Participation: Hybrids can more flexibly engage with electricity markets Operations: The power system value of hybrids depends on how they are operated Distributed Hybrids: Growth of customer-sited PV+storage hybrids offers new opportunities Future Research: Where next? Priority areas for hybrid power research.

25 ENERGY STORAGE↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Geographical variability of summer- and winter-dominant onshore wind

For each geographical region, one of the biggest challenges in reaching a zero-carbon grid is identifying sources of electricity that match the seasonal profile of the load. Summer-dominant solar electricity generation can often be balanced by winter-dominant wind electricity generation. Together with long-duration storage, balanced solar and wind generation are well positioned to provide reliable renewable electricity. However, in some locations the wind may not complement solar energy so well. For example, currently California's wind turbines produce more electricity during summer than winter, raising the question of whether all future wind plants in California will exhibit the same seasonality. As a response to this question, in this paper, we analyzed the generation from existing California wind plants and simulated potential onshore wind resource for the whole state using a metric that reflects the relative wind resource in winter. Our results indicate that the seasonality of the wind can vary for very small spatial difference with more than half of California showing stronger wind resource in the winter compared with the summer despite the current observation of the opposite trend. This study differentiates the seasonality of potential wind resources to inform the creation of a reliable, 100%-renewable-driven grid.

17 WIND ENERGY↗

Plant-level performance and degradation of 31 GW DC of utility-scale PV in the United States

In this updated study, which samples 50% more capacity than the original and adds two additional years of operating history, we assess the performance of a fleet of 631 utility-scale PV plants totaling 31.0 GW DC (23.6 GW AC ) of capacity that achieved commercial operations in the United States from 2007-2018 and that have operated for at least two full calendar years. We use detailed information on individual plant characteristics, in conjunction with modeled irradiance data, to model expected or “ideal” capacity factors in each full calendar year of each plant’s operating history. A comparison of ideal versus actual first-year capacity factors finds that this fleet has modestly underperformed initial expectations (as modeled) on average, though perhaps due as much to modeling issues as to actual underperformance. We then analyze fleet-wide performance degradation in subsequent years by employing a “fixed effects” regression model to statistically isolate the impact of age on plant performance. The resulting average fleet-wide degradation rate of -1.2%/year (±0.1%) represents a slight improvement (seemingly driven by the oldest plants in our sample) over the -1.3%/year (±0.2%) found in our original study, yet is still of greater magnitude than is commonly found. We emphasize, however, that these fleet-wide estimates reflect both recoverable and unrecoverable degradation across the entire plant, and so will naturally be of greater magnitude than module- or cell-level studies, and/or studies that focus only on unrecoverable degradation. Moreover, when focusing on a sub-sample of newer and larger plants with higher DC:AC ratios—i.e., plants that more-closely resemble what is being built today—we find a more moderate sample-wide average performance decline of -0.7%/year (±0.4%), which is more in line with other estimates from the recent literature.

14 SOLAR ENERGY↗

What can surface wind observations tell us about interannual variation in wind energy output?

The past decade of wind power growth was supported by capacity factor improvements and associated cost reductions. But are higher capacity factors a technology success story or, as suggested by recent research, has the influence of technology been overstated by ignoring positive surface wind speed trends? The answer could influence estimates of wind energy's cost and even future deployment rates. We find that US surface wind speed observations imply a 2.6% improvement in capacity factors from 2010 to 2019. Yet newer vintages of wind plants have recorded capacity factors that are ~25% larger than plants built close to 2010. It follows that technological factors and improved site quality, not higher wind speeds, drove most of the improvement in capacity factors. Additionally, we match hundreds of meteorological stations to nearby (< 25 km) wind plants and compare annual estimated generation, based on a function of surface wind speed observations, to annual recorded generation. Researchers rely on this publicly available surface data because measurements co-located with wind plants are generally considered proprietary. Our analysis addresses a research gap: interannual variation in observed surface wind speeds is rarely compared to observed data at wind plant locations and turbine heights. We find that despite its common use for this purpose, generation estimates based on publicly available surface observational data provide a poor proxy for interannual variability in recorded wind generation. These findings suggest that caution is generally needed when researchers use surface wind speed measurements to investigate long-term wind energy trends.

17 WIND ENERGY↗

Environmental and Circular Economy Implications of Solar Energy in a Decarbonized U.S. Grid

This report addresses environmental and circular economy (CE) considerations related to solar technologies via novel analysis of the three Solar Futures core scenarios as well as synthesis of published research. We organize these issues into the three basic life cycle phases of a solar technology: manufacturing, operation (including site selection and construction), and EOL. Related environmental justice issues are also explored. Finally, we recommend research and development (R&D) activities that could help clarify challenges and identify solutions. Because PV deployment is projected to be much larger than CSP deployment, we offer a more detailed analysis of PV-related issues.

14 SOLAR ENERGY↗

Solar-to-Grid: Trends in System Impacts, Reliability, and Market Value in the United States with Data Through 2020

With continued deployment of solar across the United States, assessing the interactions of solar with the power system is an increasingly important complement to studies tracking the cost and performance of solar plants. This project focuses on the historical contribution to reliability, trends in market value, and impacts on the bulk power system of solar deployed in the U.S. through the end of 2020. The scope of this analysis includes the seven organized U.S. wholesale power markets and is based on historical hourly solar generation profiles for each individual plant larger than 1 MW or county-level aggregate profiles for smaller solar. In addition, we present a limited set of results for ten utilities that are outside of the independent system operator (ISO)/regional transmission organization (RTO) markets.

14 SOLAR ENERGY↗