Examining the Impact of Data Layout on Tape on Data Recall Performance for ATLAS

Increases in data volumes are forcing high-energy and nuclear physics experiments to store more frequently accessed data on tape. Extracting the maximum performance from tape drives is critical to make this viable from a data availability and system cost standpoint. The nature of data ingest and retrieval in an experimental physics environment make achieving high access performance difficult given the inherent limitations of magnetic tape. Tailoring the layout of data on tape is one key to improving read performance. This paper highlights the work in progress to characterize ATLAS data ingested in the tape system, understand how data layout, i.e. file co-location on tape and file distribution over tapes, affect read performance and how optimal data layout might be achieved in a production environment.

99 GENERAL AND MISCELLANEOUS↗

Exploring Future Storage Options for ATLAS at the BNL/SDCC facility

The ATLAS experiment is expected to deliver an unprecedented amount of scientific data in the High Luminosity(HL-LHC) era. As the demand for disk storage capacity in ATLAS continues to rise steadily, the BNL Scientific Data and Computing Center (SDCC) faces challenges in terms of cost implications for maintaining multiple disk copies and adapting to the coming ATLAS storage requirements. To address these challenges, the SDCC Storage team has undertaken a thorough analysis of the ATLAS experiment's requirements, matching them to suitable storage options and strategies, and has explored alternatives to enhance or replace the current storage solution. This paper aims to present the main challenges encountered while supporting big data experiments such as ATLAS. We describe the experiment's specific requirements and priorities, particularly focusing on the critical storage system characteristics of the high-luminosity run and how the key storage components provided by the Storage team work together: the dCache disk storage system; its archival back-end, HPSS; and its OS-level backend Storage. Specifically, we investigate a novel approach to integrate Lustre and XRootD. In this setup, Lustre serves as backend storage and XRootD acts as an access layer frontend, supporting various grid access protocols. Additionally, we also describe the validation and commissioning tests, including the performance comparison between dCache and XRootd. Furthermore, we provide a performance and cost analysis comparing OpenZFS and LINUX MD RAID, evaluate different storage software stacks, and showcase stress tests conducted to validate Third Party Copy (TPC) functionality.

99 GENERAL AND MISCELLANEOUS↗

Finalizing Transition to the New Data Center at BNL

Computational science, data management and analysis have been key factors in the success of Brookhaven National Laboratory's scientific programs at the Relativistic Heavy Ion Collider (RHIC), the National Synchrotron Light Source (NSLS-II), the Center for Functional Nanomaterials (CFN), and in biological, atmospheric, and energy systems science, Lattice Quantum Chromodynamics (LQCD) and Materials Science, as well as our participation in international research collaborations, such as the ATLAS Experiment at Europe's Large Hadron Collider (LHC) at CERN (Switzerland) and the Belle II Experiment at KEK (Japan). The construction of a new data center is an acknowledgement of the increasing demand for computing and storage services at BNL in the near term and enable the Lab to address the needs of the future experiments at the High-Luminosity LHC at CERN and the Electron-Ion Collider (EIC) at BNL in the long term. The Computing Facility Revitalization (CFR) project is aimed at repurposing the former National Synchrotron Light Source (NSLS-I) building as the new data center for BNL. The construction of the new data center was finished in 2021Q3, and it was delivered for production in early FY2022 for all collaborations supported by the Scientific Data and Computing Center (SDCC), including STAR, PHENIX and sPHENIX experiments at RHIC collider at BNL, the Belle II Experiment at KEK (Japan), and the Computational Science Initiative at BNL (CSI). This paper highlights the key mechanical, electrical, and networking components of the new data center in its final configuration as used in production since 2021Q4 and gives an overview for the extension of the central network systems into the new data center and the migration of a significant portion of IT load and services from the old data center to the new data center carried out in 20212023, with expected completion of the main phase of the gradual IT equipment replacement and migration from the old data center into the new one set to the end of FY2023 (Sep 30, 2023).

99 GENERAL AND MISCELLANEOUS↗

Financial Case Study on the Use of Cloud Resources in HEP Computing

An all-inclusive analysis of costs for on-premises and public cloudbased solutions to handle the bulk of HEP computing requirements shows that dedicated on-premises deployments of compute and storage resources are still the most cost-effective. Since the advent of public cloud services, the HEP community has engaged in multiple proofs of concept to study the technical viability of using cloud resources; however, the financial viability of using cloud resources for HEP computing and storage is of greater importance. We present the results of a study comparing the cost of providing computing resources in a public cloud and a comprehensive estimate for the cost of an on-premises solution for HEP computing. Like previous studies, the fundamental conclusion is that for the bulk of HEP computing needs, on premises is significantly more cost effective than public clouds.

99 GENERAL AND MISCELLANEOUS↗