Study of Effects of Failure of Beamline Elements and its Compensation in CW Superconducting Linac
Project-X is a proposed high intensity proton facility to be built at Fermilab in United States. The first stage consists of a superconducting linac (SC) operating in continuous wave (CW) mode to accelerate a H{sup -} beam from 2.1 MeV to 3 GeV. Failure of any beamline element during operations induces a downstream mismatch of the beam which is especially severe when the failure occurs at low energy. A large mismatch causes emittance growth and ultimately results in beam losses. In a worst case scenario, the operability of the machine may be affected and long downtime may be needed to replace the failed element. To minimize possible downtime, the optics can be designed in a way that allows local retuning to make the machine operable. This paper presents studies performed to investigate retuning scenarios after failure of an accelerating cavity or a focusing magnet at critical locations in the Project-X CW superconducting linac.