Status of SNS Proton Power Upgrade SRF Cavities Production Qualification

The Pro­ton Power Up­grade pro­ject at Oak Ridge Na­tional Lab’s Spal­la­tion Neu­tron Source (SNS PPU) cur­rently being con­structed will dou­ble the pro­ton beam power from 1.4 to 2.8 MW by adding 7 ad­di­tional cry­omod­ules, each con­tains four six-cell high beta (\beta = 0.81) su­per­con­duct­ing radio fre­quency cav­i­ties. The cav­i­ties were built by Re­search In­stru­ments, Ger­many, with all the cav­ity pro­cess­ing done at the ven­dor site, in­clud­ing elec­trop­o­l­ish­ing as the final ac­tive chem­istry step. All 28 cav­i­ties needed for 7 cry­omod­ules were de­liv­ered to Jef­fer­son Lab, ready to be tested. The cryo­genic RF qual­i­fi­ca­tions and he­lium ves­sel weld­ing were done at Jef­fer­son Lab. The per­for­mance largely ex­ceed the re­quire­ments, and greatly ex­ceeded the per­for­mance of the orig­i­nal SNS cav­ity pro­duc­tion se­ries. Here, we pre­sent the sum­mary of RF test on pro­duc­tion cav­i­ties to this date.

Dhakal, P.↗

New Improved Horizontal Electropolishing System for SRF Cavities

The best performance of niobium SRF accelerating cavities is obtained with surfaces smoothed with electropolishing chemical finishing. Jefferson Lab has recently specified, procured, installed, and commissioned a new versatile production electropolishing (EP) tool. Experience with EP research and operations at JLab as well as vendor interactions and experience guided development of the system specification. Detailed design and fabrication was awarded by contract to Semiconductor Process Equipment Corporation (SPEC). The delivered system was integrated into the JLab chemroom infrastructure and commissioned in 2020. The new EP tool provides much improved heat exchange from the circulating H₂SO₄/HF electrolyte and also the cavity via variable temperature external cooling water flow, resulting in quite uniform cavity wall temperature control and thus improved removal uniformity. With the JLab infrastructure, stabilized process temperature as low as 5 C is available. We describe the system and illustrate operational modes in this contribution.

Reece, C. E.↗

Status of SNS Proton Power Upgrade SRF Cavities Production Qualification

The Pro­ton Power Up­grade pro­ject at Oak Ridge Na­tional Lab’s Spal­la­tion Neu­tron Source (SNS PPU) cur­rently being con­structed will dou­ble the pro­ton beam power from 1.4 to 2.8 MW by adding 7 ad­di­tional cry­omod­ules, each con­tains four six-cell high beta (\beta = 0.81) su­per­con­duct­ing radio fre­quency cav­i­ties. The cav­i­ties were built by Re­search In­stru­ments, Ger­many, with all the cav­ity pro­cess­ing done at the ven­dor site, in­clud­ing elec­trop­o­l­ish­ing as the final ac­tive chem­istry step. All 28 cav­i­ties needed for 7 cry­omod­ules were de­liv­ered to Jef­fer­son Lab, ready to be tested. The cryo­genic RF qual­i­fi­ca­tions and he­lium ves­sel weld­ing were done at Jef­fer­son Lab. The per­for­mance largely ex­ceed the re­quire­ments, and greatly ex­ceeded the per­for­mance of the orig­i­nal SNS cav­ity pro­duc­tion se­ries. Here, we pre­sent the sum­mary of RF test on pro­duc­tion cav­i­ties to this date.

Dhakal, P.↗