Search NASA⌕ Search

Engineering topics

Mollard, P.

Publications and source records attributed to Mollard, P..

WEST actively cooled load resilient ion cyclotron resonance heating system results

Three identical new WEST ion cyclotron resonance heating (ICRH) antennas have been designed, assembled then commissioned on plasma from 2013 to 2019. The WEST ICRH system is both load-resilient and compatible with long-pulse operations. The three antennas have been successfully operated together on plasma in 2019 and 2020, with up to 5.8 MW of coupled power. The load resilience capability has been demonstrated and the antenna feedback controls for phase and matching have been developed. The breakdown detection systems have been validated and successfully protected the antennas. The use of ICRH in combination with lower hybrid has triggered the first high confinement mode transitions identified on WEST.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

WEST actively cooled load resilient ion cyclotron resonance heating system results

Three identical new WEST ion cyclotron resonance heating (ICRH) antennas have been designed, assembled then commissioned on plasma from 2013 to 2019. The WEST ICRH system is both load-resilient and compatible with long-pulse operations. The three antennas have been successfully operated together on plasma in 2019 and 2020, with up to 5.8 MW of coupled power. In this work, the load resilience capability has been demonstrated and the antenna feedback controls for phase and matching have been developed. The breakdown detection systems have been validated and successfully protected the antennas. The use of ICRH in combination with lower hybrid has triggered the first high confinement mode transitions identified on WEST.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

ATRIUM{sup TM} 11 operating experience

AREVA NP developed the ATRIUM{sup TM}11 BWR fuel assembly to address the industry need for substantial improvements in fuel reliability and economic performance. The product development effort initially consisted of analytical design assessments and out-of-pile testing of prototype fuel assemblies and components. An integral component of the development project is a comprehensive in-pile demonstration program designed to fully exercise the new fuel assembly under a variety of operating conditions and to provide performance measurements of new design features. Fuel vendors, reactor operators, and regulators have successfully relied upon irradiation feedback derived from in-pile demonstration programs to safely introduce new features in reload quantities. The primary ATRIUM{sup TM} 11 in-pile demonstration program consists of 40 lead fuel assemblies (LFA) operating among five BWR reactors globally, covering the range of operational regimes and licensing environments necessary to confirm reload applications for the product. Since the initial irradiation in 2012, multiple pool-side inspection examinations have been performed. The inspection activities primarily focused on the new design features; including the spacer, fuel rod array, upper tie plate and fuel channel. These inspections have resulted in the collection of a substantial set of visual images, dimensional measurements, and performance feedback that are of general interest to the industry. Results from the inspections are compared to the database for existing products and to predetermined acceptance criteria. This paper provides details of the global in-pile demonstration program and the characteristics of the LFAs. Results of the inspection campaigns will be presented, including a summary of the technical assessment of specific new design features and the overall performance of the ATRIUM{sup TM} 11 product. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RF heating systems evolution for the WEST project

Tore Supra is dedicated to long pulse operation at high power, with a record in injected energy of 1 GJ (2.8 MW × 380 s) and an achieved capability of 12 MW injected power delivered by 3 RF systems: Lower Hybrid Current Drive (LHCD), Ion Cyclotron Resonance Heating (ICRH) and Electron Cyclotron Resonance Heating (ECRH). The new WEST project (W [tungsten] Environment in Steady-state Tokamak) aims at fitting Tore Supra with an actively cooled tungsten coated wall and a bulk tungsten divertor. This new device will offer to ITER a test bed for validating the relevant technologies for actively cooled metallic components, with D-shaped H-mode plasmas. For WEST operation, different scenarii able to reproduce ITER relevant conditions in terms of steady state heat loads have been identified, ranging from a high RF power scenario (15 MW, 30 s) to a high fluence scenario (10 MW, 1000 s). This paper will focus on the evolution of the RF systems required for WEST. For the ICRH system, the main issues are its ELM resilience and its CW compatibility, three new actively cooled antennas are being designed, with the aim of reducing their sensitivity to the load variations induced by ELMs. The LH system has been recently upgraded with new klystrons and the PAM antenna, the possible reshaping of the antenna mouths is presently studied for matching with the magnetic field line in the WEST configuration. For the ECRH system, the device for the poloidal movement of the mirrors of the antenna is being changed for higher accuracy and speed.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Physics and technology in the ion-cyclotron range of frequency on Tore Supra and TITAN test facility: implication for ITER

To support the design of an ITER ion-cyclotron range of frequency heating (ICRH) system and to mitigate risks of operation in ITER, CEA has initiated an ambitious Research & Development program accompanied by experiments on Tore Supra or test-bed facility together with a significant modelling effort. The paper summarizes the recent results in the following areas: Comprehensive characterization (experiments and modelling) of a new Faraday screen concept tested on the Tore Supra antenna. A new model is developed for calculating the ICRH sheath rectification at the antenna vicinity. The model is applied to calculate the local heat flux on Tore Supra and ITER ICRH antennas. Full-wave modelling of ITER ICRH heating and current drive scenarios with the EVE code. With 20 MW of power, a current of 400 kA could be driven on axis in the DT scenario. Comparison between DT and DT(3He) scenario is given for heating and current drive efficiencies. First operation of CW test-bed facility, TITAN, designed for ITER ICRH components testing and could host up to a quarter of an ITER antenna. R&D of high permittivity materials to improve load of test facilities to better simulate ITER plasma antenna loading conditions.

Litaudon, X↗