FRIB Beam Power Ramp-up: Status and Plans
After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.