Search NASA⌕ Search

Engineering topics

Monell, D. W.

Publications and source records attributed to Monell, D. W..

Alternate assembly sequence databook for the Tier 2 Bus-1 option of the International Space Station

The JSC International Space Station program office requested that SSB prepare a databook to document the alternate space station assembly sequence known as Tier 2, which assumes that the Russian participation has been eliminated and that the functions that were supplied by the Russians (propulsion, resupply, initial attitude control, communications, etc.) are now supplied by the U.S. Tier 2 utilizes the Lockheed Bus-l to replace much of the missing Russian functionality. The space station at each stage of its buildup during the Tier 2 assembly sequence is characterized in terms of of properties, functionality, resource balances, operations, logistics, attitude control, microgravity environment and propellant usage. The assembly sequence as analyzed was defined by JSC as a first iteration, with subsequent iterations required to address some of the issues that the analysis in this databook identified. Several significant issues were identified, including: less than desirable orbit lifetimes, shortage of EVA, large flight attitudes, poor microgravity environments, and reboost propellant shortages. Many of these issues can be resolved but at the cost of possible baseline modifications and revisions in the proposed Tier 2 assembly sequence.

Brewer, L. M.↗

Evolution design requirements and design strategy

Space Station Freedom (SSF) has undergone numerous design changes during the rephasing and restructuring activities occurring in 1989 and 1990/91, respectively. One direct result of these changes is that the Station has become more complex and compact which requires that future modifications to the Station be carefully planned and analyzed in conjunction with the baseline design process. This will ensure that the configuration has adequate design features and flexibility to accommodate the future capability and element upgrades. Six critical growth requirements (electrical power, thermal control, pressurized volume, structures, EVA equipment, and data management) have been identified and baselined in the Level I Program Requirements Document (PRD) and the Level II Program Definition and Requirements Document (PDRD). The approach to meeting the growth requirements will be to minimize the impact on the baseline design in the areas of weight, power, and development cost. The specifics of these requirements, with regard to scarring and implementation during the Follow-On and Evolution phases of SSF, are detailed in this paper.

Monell, D. W.↗