Improving Experimental Baseline Schedule Resiliency at the National Ignition Facility
The goal of this system is to provide a universal method of capturing and integrating campaign level target requirements for experiments at the National Ignition Facility (NIF) prior to establishing a baseline schedule. The expected outcome is a more resilient schedule able to accurately incorporate long lead target requirements.
42 ENGINEERING↗