Moore, Arlene A.

Publications and source records attributed to Moore, Arlene A..

Lessons Learned Study Final Report for the Exploration Systems Mission Directorate

This report is the final product of a 90-day study performed for the Exploration Systems Mission Directorate. The study was to assemble lessons NASA has learned from previous programs that could help the Exploration Systems Mission Directorate pursue the Exploration vision. It focuses on those lessons that should have the greatest significance to the Directorate during the formulation of program and mission plans. The study team reviewed a large number of lessons learned reports and data bases, including the Columbia Accident Investigation Board and Rogers Commission reports on the Shuttle accidents, accident reports from robotic space flight systems, and a number of management reviews by the Defense Sciences Board, Government Accountability Office, and others. The consistency of the lessons, findings, and recommendations validate the adequacy of the data set. In addition to reviewing existing databases, a series of workshops was held at each of the NASA centers and headquarters that included senior managers from the current workforce as well as retirees. The full text of the workshop reports is included in Appendix A. A lessons learned website was opened up to permit current and retired NASA personnel and on-site contractors to input additional lessons as they arise. These new lessons, when of appropriate quality and relevance, will be brought to the attention of managers. The report consists of four parts: Part 1 provides a small set of lessons, called the Executive Lessons Learned, that represent critical lessons that the Exploration Systems Mission Directorate should act on immediately. This set of Executive Lessons and their supporting rationale have been reviewed at length and fully endorsed by a team of distinguished NASA alumni; Part 2 contains a larger set of lessons, called the Selected Lessons Learned, which have been chosen from the lessons database and center workshop reports on the basis of their specific significance and relevance to the near-term work of the Exploration Directorate. These lessons frequently support the Executive lessons but are more general in nature; Part 3 consists of the reports of the center workshops that were conducted as part of this activity. These reports are included in their entirety (approximately 200 pages) in Appendix G and have significance for specific managers; Part 4 consists of the remainder of the lessons that have been selected by this effort and assembled into a database for the use of the Explorations Directorate. The database is archived and hosted in the Lessons Learned Knowledge Network, which provides a flexible search capability using a wide variety of search terms. Finally, a spreadsheet lists databases searched and a bibliography identifies reports that have been reviewed as sources of lessons for this task. NASA has been presented with many learning opportunities. We have conducted numerous programs, some extremely successful and others total failures. Most have been documented with a formal lessons learned activity, but we have not always incorporated these learning opportunities into our normal modes of business. For example, the Robbins Report of 2001 clearly indicates that many project failures of the past two decades were the result of violating well documented best practices, often in direct violation of management instructions and directives. An overarching lesson emerges: that disciplined execution in accordance with proven best practices is the greatest single contributor to a successful program. The Lessons Learned task team offers a sincere hope that the lessons presented herein will be helpful to the Exploration Systems Directorate in charting and executing their course. The success of the Directorate and of NASA in general depends on our collective ability to move forward without having to relearn the lessons of those who have gone before.

Van Laak, Jim

Response Surface Model Building Using Orthogonal Arrays for Computer Experiments

This study investigates response surface methods for computer experiments and discusses some of the approaches available. Orthogonal arrays constructed for computer experiments are studied and an example application to a technology selection and optimization study for a reusable launch vehicle is presented.

Unal, Resit

Space system operations and support cost analysis using Markov chains

This paper evaluates the use of Markov chain process in probabilistic life cycle cost analysis and suggests further uses of the process as a design aid tool. A methodology is developed for estimating operations and support cost and expected life for reusable space transportation systems. Application of the methodology is demonstrated for the case of a hypothetical space transportation vehicle. A sensitivity analysis is carried out to explore the effects of uncertainty in key model inputs.

Unal, Resit

Using the MCPLXS Generator for Technology Transfer

The objective of this paper is to acquaint you with some of the approaches we are taking at Langley to incorporate escalations (or de-escalations) of technology when modeling futuristic systems. Since we have a short turnaround between the time we receive enough descriptive information to start estimating the project and when the estimate is needed (the "we-want-it-yesterday syndrome"), creativity is often necessary. There is not much time available for tool development. It is expedient to use existing tools in an adaptive manner to model the situation at hand. Specifically, this paper describes the use of the RCA PRICE MCPLXS Generator to incorporate technology transfer and technology escalation in estimates for advanced space systems such as Shuttle II and NASA advanced technology vehicles. It is assumed that the reader is familiar with the RCA PRICE family of models as well as the RCA PRICE utility programs such as SCPLX, PARAM, PARASYN, and the MCPLXS Generator.

Moore, Arlene A.

Cost Risk Analysis Based on Perception of the Engineering Process

In most cost estimating applications at the NASA Langley Research Center (LaRC), it is desirable to present predicted cost as a range of possible costs rather than a single predicted cost. A cost risk analysis generates a range of cost for a project and assigns a probability level to each cost value in the range. Constructing a cost risk curve requires a good estimate of the expected cost of a project. It must also include a good estimate of expected variance of the cost. Many cost risk analyses are based upon an expert's knowledge of the cost of similar projects in the past. In a common scenario, a manager or engineer, asked to estimate the cost of a project in his area of expertise, will gather historical cost data from a similar completed project. The cost of the completed project is adjusted using the perceived technical and economic differences between the two projects. This allows errors from at least three sources. The historical cost data may be in error by some unknown amount. The managers' evaluation of the new project and its similarity to the old project may be in error. The factors used to adjust the cost of the old project may not correctly reflect the differences. Some risk analyses are based on untested hypotheses about the form of the statistical distribution that underlies the distribution of possible cost. The usual problem is not just to come up with an estimate of the cost of a project, but to predict the range of values into which the cost may fall and with what level of confidence the prediction is made. Risk analysis techniques that assume the shape of the underlying cost distribution and derive the risk curve from a single estimate plus and minus some amount usually fail to take into account the actual magnitude of the uncertainty in cost due to technical factors in the project itself. This paper addresses a cost risk method that is based on parametric estimates of the technical factors involved in the project being costed. The engineering process parameters are elicited from the engineer/expert on the project and are based on that expert's technical knowledge. These are converted by a parametric cost model into a cost estimate. The method discussed makes no assumptions about the distribution underlying the distribution of possible costs, and is not tied to the analysis of previous projects, except through the expert calibrations performed by the parametric cost analyst.

Dean, Edwin B.