Overview of the fusion nuclear science facility, a credible break-in step on the path to fusion energy

The Fusion Nuclear Science Facility (FNSF) is examined here as part of a two step program from ITER to commercial power plants. This first step is considered mandatory to establish the materials and component database in the real fusion in-service environment before proceeding to larger electricity producing facilities. The FNSF can be shown to make tremendous advances beyond ITER, toward a power plant, particularly in plasma duration and fusion nuclear environment. A moderate FNSF is studied in detail, which does not generate net electricity, but does reach the power plant blanket operating temperatures. The full poloidal Dual Coolant Lead Lithium (DCLL) blanket is chosen, with alternates being the Helium Cooled Lead Lithium (HCLL) and Helium Cooled Ceramic Breeder/Pebble Bed (HCCB/PB). Several power plant relevant choices are made in order to follow the philosophy of targeted technologies. Any fusion core component must be qualified by fusion relevant neutron testing and highly integrated non-nuclear testing before it can be installed on the FNSF in order to avoid the high probability of constant failures in a plasma-vacuum system. A range of missions for the FNSF, or any fusion nuclear facility on the path toward fusion power plants, are established and characterized by several metrics. A conservative physics strategy is pursued to accommodate the transition to ultra-long plasma pulses, and parameters are chosen to represent the power plant regime to the extent possible. An operating space is identified, and from this, one point is chosen for further detailed analysis, with R = 4.8 m, a = 1.2 m, IP = 7.9 MA, BT = 7.5 T, βN Gr = 0.9, fBS = 0.52, q95 = 6.0, H98 ∼1.0, and Q = 4.0. The operating space is shown to be robust to parameter variations. A program is established for the FNSF to show how the missions for the facility are met, with a He/H, a DD and 5 DT phases. The facility requires ∼25 years to complete its DT operation, including 7.8 years of neutron production, and the remaining spent on inspections and maintenance. The DD phase is critical to establish the ultra-long plasma pulse lengths. The blanket testing strategy is examined, and shows that many sectors have penetrations for heating and current drive (H/CD), diagnostics, or Test Blanket Modules (TBMs). The hot cell is a critical facility element in order for the FNSF to perform its function of developing the in-service material and component database. The pre-FNSF R&D is laid out in terms of priority topics, with the FNSF phases driving the time-lines for R&D completion. A series of detailed technical assessments of the FNSF operating point are reported in this issue, showing the credibility of such a step, and more detailed emphasis on R&D items to pursue. These include nuclear analysis, thermo-mechanics and thermal-hydraulics, liquid metal thermal hydraulics, transient thermo-mechanics, tritium analysis, maintenance assessment, magnet specification and analysis, materials assessments, core and scrape-off layer (SOL)/divertor plasma examinations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Critical Exploration of Liquid Metal Plasma-Facing Components in a Fusion Nuclear Science Facility

Liquid metal (LM) plasma-facing components (PFCs) may provide a resolution to the challenging fusion environment, particularly the first wall and divertor surfaces. Transforming these concepts into viable technologies will require considerable research and development. Here, with the fusion nuclear regime in mind, the Fusion Energy System Studies group examined LM PFCs in order to identify needed research thrusts that could accelerate their development and assess their viability. Liquid metal behavior, solid substrate aspects, and fusion facility integration aspects are examined, with concepts as the research focusing element. The concepts applied to a fusion nuclear device are the primary definer of the LM parameters, environmental conditions, and operational aspects. This forms the research strategy recommended for these complex systems.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Fusion Nuclear Science Facility, the Critical Step in the Pathway to Fusion Energy

The proposed Fusion Nuclear Science Facility (FNSF) represents the first facility to enter the complex fusion nuclear regime, and its technical mission and attributes are being developed. The FNSF represents one part of the fusion energy development pathway to the first commercial power plant with other major components being the pre-FNSF research and development, research in parallel with the FNSF, pre-DEMO research and development, and the demonstration power plant (DEMO). Finally, the Fusion Energy Systems Studies group is developing the technical basis for the FNSF in order to provide a better understanding of the demands on the fusion plasma and fusion nuclear science programs.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Fusion materials science and technology research opportunities now and during the ITER era

Several high-priority near-term potential research activities to address fusion nuclear science challenges are summarized. General recommendations include: (1) Research should be preferentially focused on the most technologically advanced options (i.e., options that have been developed at least through the singleeffects concept exploration stage, technology readiness levels >3), (2) Significant near-term progress can be achieved by modifying existing facilities and/or moderate investment in new medium-scale facilities, and (3) Computational modeling for fusion nuclear sciences is generally not yet sufficiently robust to enable truly predictive results to be obtained, but large reductions in risk, cost and schedule can be achieved by careful integration of experiment and modeling.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A fusion nuclear science facility for a fast-track path to DEMO

An accelerated fusion energy development program, a fast-track approach, requires proceeding with a nuclear and materials testing program in parallel with research on burning plasmas, ITER. A Fusion Nuclear Science Facility (FNSF) would address many of the key issues that need to be addressed prior to DEMO, including breeding tritium and completing the fuel cycle, qualifying nuclear materials for high fluence, developing suitable materials for the plasma-boundary interface, and demonstrating power extraction. The Advanced Tokamak (AT) is a strong candidate for an FNSF as a consequence of its mature physics base, capability to address the key issues, and the direct relevance to an attractive target power plant. The standard aspect ratio provides space for a solenoid, assuring robust plasma current initiation,and for an inboard blanket, assuring robust tritium breeding ratio (TBR) >1 for FNSF tritium self-sufficiency and building of inventory needed to start up DEMO. An example design point gives a moderate sized Cu-coil device with R/a = 2.7 m/0.77 κ = 2.3, B T = 5.4 T, I P = 6.6 MA, β N = 2.75, P fus = 127 MW. The modest bootstrap fraction of f BS = 0.55 provides an opportunity to develop steady state with sufficient current drive for adequate control. Lastly, proceeding with a FNSF in parallel with ITER provides a strong basis to begin construction of DEMO upon the achievement of Q ~ 10 in ITER.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗