Search NASASearch

Engineering topics

Morring, Frank, Jr.

Publications and source records attributed to Morring, Frank, Jr..

One More Time

NASA engineers on the Hubble Space Telescope program are actively preparing a shuttle mission to service the orbiting observatory, perhaps as early as 2007, pending a safe return to flight of the shuttle fleet. Administrator Michael D. Griffin must give final clearance to mount the mission, scuttled by former Administrator Sean O'Keefe on what he said were safety grounds in the wake of the Columbia accident. But Griffin, who has overturned much of O'Keefe's policy in his three months on the job, has already told the Hubble program to proceed as though the mission will take place. In that, he has at least the acquiescence of Harold Gehman, the retired admiral who headed the Columbia Accident Investigation Board (CAIB). The CAIB never intended its recommendations to preclude a shuttle-borne Hubble servicing mission, Gehman says, and its members still believe the risk would be no greater than missions to the International Space Station (ISS).

Morring, Frank, Jr.

Robot Swarms

Engineers and interns at this NASA field center are building the prototype of a robotic rover that could go where no wheeled rover has gone before-into the dark cold craters at the lunar poles and across the Moon s rugged highlands-like a walking tetrahedron. With NASA pushing to meet President Bush's new exploration objectives, the robots taking shape here today could be on the Moon in a decade. In the longer term, the concept could lead to shape-shifting robot swarms designed to explore distant planetary surfaces in advance of humans. "If you look at all of NASA s projections of the future, anyone s projections of the space program, they re all rigid-body architecture," says Steven Curtis, principal investigator on the effort. "This is not rigid-body. The whole key here is flexibility and reconfigurability with a capital R."

Morring, Frank, Jr.

First Cut

Lockheed Martin and a Northrop Grumman/Boeing team expect the Crew Exploration Vehicle proposals they submitted last week to change, given the new top-down push at NASA to close the gap between space shuttle retirement and launch of the new crew carrier. Still, delivery of the proposals gives a first glimpse of at least one of the concepts for a space shuttle replacement. Instead of the ballistic capsule approach put forward in some early CEV concept work, Lockheed Martin proposed a lifting body shape with a two-stage thermal protection system, coupled with a cylindrical mission module to give crews of four to six extra room on trips to the Moon, and a trans-Earth injection module (TEIM) for the return powered-at least in the first cut-by a couple of Pratt & Whitney RL10 rocket engines.

Morring, Frank, Jr.

Game Plan

Industry proposals for the Crew Exploration Vehicle that NASA plans as a replacement for the space shuttle are due next week, but the agency's new chief says it might be necessary to slow the CEV procurement at first to speed it up later. After a quick trip to Kennedy Space Center for briefings on getting the space shuttle back in operation, Michael D. Griffin sat down with his growing staff last week to begin work on modifying the CEV procurement. "We are going to rethink our entire program in that area," he said during an inaugural press conference Apr. 18. The proposals due May 2 are being prepared in response to NASA's call for a "risk-reduction flight effort" in 2008 that would lead to delivery of a human-rated CEV in 2014. But Griffin was co-leader on an independent study in 2004 that recommended a way to get the CEV flying astronauts in 2010, the year President Bush has set as a deadline for retiring the space shuttle fleet. In that study, produced for The Planetary Society, Griffin and his team called for development of a 13-15-ton "Block 1" CEV limited to low Earth orbit (LEO) that would be launched atop a single space shuttle solid rocket motor (SRM), with a new cryogenic upper stage based on existing rocket engine technology, Under this approach, NASA would develop a "Block 2" CEV later for human exploration beyond LEO.

Morring, Frank, Jr.

Multi-Tasking: First Shuttle Mission Since Columbia Combines Test Flight, Catch-Up ISS Supply and Maintenance

NASA's space shuttle fleet is nearing its return to flight with a complex mission on board Discovery that will combine tests of new hardware and procedures adopted in the wake of Columbia's loss with urgent repairs and resupply for the International Space Station. A seven-member astronaut crew has trained throughout most of the two-year hiatus in shuttle operations for the 13-day mission, shooting for a three-week launch window that opens May 15. The window, and much else about the STS-114 mission, is constrained by NASA's need to ensure it has fixed the ascent/debris problem that doomed Columbia and its crew as they attempted to reenter the atmosphere on Feb. 1, 2003. The window was selected so Discovery's ascent can be photographed in daylight with 107 different ground- and aircraft-based cameras to monitor the redesigned external tank for debris shedding. Fixed cameras and the shuttle crew will also photograph the tank in space after it has been jettisoned.

Morring, Frank, Jr.

Griffin Lifts Off at NASA With Calls for Speeding Shuttle Replacement, Reopening Hubble Decision

Michael D. Griffin launched his tenure as NASA's 11th administrator on a fast track, using his "emergency" confiimation by the U.S. Senate to plug himself into space shuttle return-to-flight decision-making and urging faster development of the shuttle replacement. He also deftly sidestepped the treacherous issue of letting the aging Hubble Space Telescope die that was left behind by former Administrator Sean O'Keefe. Griffin told the Senate Commerce, Science and Transportation Committee that he would take another look at a shuttle mission to service the telescope, but not until the redesigned shuttle system makes a couple of test flights. Griffin made clear at his confirmation hearing Apr. 12 that he has long supported the ideas embodied in President Bush s push to move human exploration out of low Earth orbit, while finishing the International Space Station and retiring the space shuttle as soon as possible. And he showed right out of the blocks that his technical training and management background should serve him well in implementing Bush's directives.

Morring, Frank, Jr.

Backstop: Shuttle Will Fly with Outstanding Waivers; New Oversight Eases Conflicts on Safety

he space shuttle Discovery is carrying some 300 waivers to technical specifications as it enters the home stretch of its planned return to flight next month. There were about 6,000 waivers in place when Columbia crashed. Shuttle managers say they are working to reduce the number of waivers remaining by fixing the problems they highlight, a change prompted by the Columbia Accident Investigation Board. In the wake of the accident, NASA has heeded the CAWS recommendation that waivers be the responsibility of an "independent technical authority" (ITA), rather than the shuttle program itself. To carry out the recommendation of the CAIB-which found an inherent conflict of interest in having the same managers make decisions about cost, schedule and safety-then-Administrator Sean O'Keefe designated the agency's chief engineer as the formal ITA. He is responsible for setting, maintaining and granting waivers across the agency. In mid-January, Fred Gregory, then O'Keefe's deputy and now his acting replacement, launched the ITA within NASA under Chief Engineer Rex Geveden, the former program manager on the Gravity Probe B experiment.

Morring, Frank, Jr.

Following Up: Huygens Data, Questions Will Guide Cassini on Its Future Titan Passes

Planetary scientists plan to use the instruments on NASA's Cassini Saturn orbiter in future flybys of Titan to answer questions raised by Europe's Huygens probe. In particular, they hope to discover whether the dark, flat areas on the moon's surface are liquid or quasi-liquid methane seas. As the scientists plotted their next moves, European Space Agency (ESA) officials continued their investigation into how a critical command in the Huygens descent sequence was omitted costing the imaging team half of its data and rendering another Huygens instrument useless. There were suggestions that U.S. export-control rules may have hampered the sort of close international cooperation that might have caught the error.

Morring, Frank, Jr.

Touchdown on Titan

Europe's Huygens probe is on target for a Dec. 25 separation from the Cassini Saturn orbiter that has carried it like a baby for more than seven years. The probe will spend three weeks coasting to a plunge into Titan's thick atmosphere on the morning of Jan. 14. If all goes as planned, the 349-kg. Huygens will spend more than 2 hr. descending by parachute to the mysterious surface of the planet-sized moon, and hopefully devote yet more time to broadcasting data after it lands. Before the day is over, Huygens is programmed to beam about 30 megabytes of data - including some 1,100 images-back to Earth through Cassini, a trip that will take some 75 min. to complete over the 1- billion-km. distance that separates the two planets. Within that data should be answers to questions that date back to 1655, when Dutch astronomer Christiaan Huygens found the moon with a homemade telescope and named it for the family of giants the ancient Greeks believed once ruled the earth. In the Solar System, there is no other world like Titan, with a nitrogen and methane atmospheric and a cold, hidden surface darker than Earth under the full Moon.

Morring, Frank, Jr.

Risk Analysis

A National Academies panel says the Hubble Space Telescope is too valuable ;or gamblingon a long-shot robotic mission to extend its service life, and urges Directly contradicting Administrator Sean O'Keefe, who killed a planned fifth shuttle servicing mission to the telescope on grounds it was too dangerous for a human crew in the post-Challenger environment, the expert committee found that upgrades to shuttle safety actually should make it less hazardous to fly to the telescope than it was before Columbia was lost. Risks of a telescope-servicing mission are only marginally greater than the planned missions to the International Space Station (ISS) O'Keefe has authorized, the panel found. After comparing those risks to the dangers inherent in trying to develop a complex space robot in the 39 months remaining in the Hubble s estimated service life, the panel opted for the human mission to save one of the major achievements of the American space program, in the words of Louis J. Lanzerotti, its chairman.

Morring, Frank, Jr.

Quick Draw

A NASA spacecraft set for launch Nov. 17 is designed to help scientists determine the origin of gamma-ray bursts by pinpointing their sources in the sky and quickly focusing optical/ultraviolet and X-ray telescopes on them.

Morring, Frank, Jr.

Mothers of Invention: Hubble Engineers Push Robotic 'Evolution' to Save Telescope, Enable New Exploration

Robotic technology being developed out of necessity to keep the Hubble Space Telescope operating could also lead to new levels of man-machine team-work in deep-space exploration down the road-if it survives the near-term scramble for funding. Engineers here who have devoted their NASA careers to the concept of humans servicing the telescope in orbit are planning modifications to International Space Station (ISS) robots that would leave the humans on the ground. The work. forced by post-Columbia flight rules that killed a planned shuttle-servicing mission to Hubble, marks another step in the evolution of robot-partners for human space explorers. "Hubble has always been a pathfider for this agency," says Mike Weiss. Hubble deputy program manager technical. "When the space station was flown and assembled, Hubble was the pathfinder. not just for modularity, but for operations, for assembly techniques. Exploration is the next step. Things we're going to do on Hubble are going to be applied to exploration. It's not just putting a robot in space. It's operating a robot in space. It's adapting that robot to what needs to be done the next time you're up there."

Morring, Frank, Jr.

Fallen Star

The Sept 8 mishap of the Genesis probe raised fears of the same fate happening to the Stardust comet sample return mission due to parachute into the Utah desert in 2006 with similar recovery hardware.The crash also raised a caution flag for designers of future lunar and Mars sample return missions.

Morring, Frank, Jr.

Full Service

NASA is moving ahead with the sole-source procurement of a Canadian robot to service the Hubble Space Telescope, gaining confidence the International Space Station (ISS) technology can perform all of the tasks shuttle-launched astronauts were scheduled to do before the Columbia accident changed everything. The U.S. agency is negotiating with MD Robotics, a MacDonald Dettwiler unit located in Brampton, Ontario, for a version of the Special Purpose Dexterous Manipulator (SPDM) the company developed for the ISS. The SPDM would be the business end of a throwaway module designed to replace batteries and gyroscopes, pull old instruments and install new ones before plunging to a targeted reentry over the Pacific.

Morring, Frank, Jr.

Anomaly Analysis: NASA's Engineering and Safety Center Checks Recurring Shuttle Glitches

The NASA Engineering and Safety Center (NESC), set up in the wake of the Columbia accident to backstop engineers in the space shuttle program, is reviewing hundreds of recurring anomalies that the program had determined don't affect flight safety to see if in fact they might. The NESC is expanding its support to other programs across the agency, as well. The effort, which will later extend to the International Space Station (ISS), is a principal part of the attempt to overcome the normalization of deviance--a situation in which organizations proceeded as if nothing was wrong in the face of evidence that something was wrong--cited by sociologist Diane Vaughn as contributing to both space shuttle disasters.

Morring, Frank, Jr.

Lesson Learned

ASA will begin naming "a few hundred" engineers soon who will constitute the Independent. Technical Authority (ITA) recommended by the Columbia Accident Investigation Board to pro- vide an effective check and balance on space programs for safety. Within the next month, the directors of Johnson and Kennedy space centers will name "a couple of dozen at each place" to backstop human spaceflight engineers, according to Theron M. Bradley, Jr., NASA chief engineer. By the time the new fiscal year begins Oct. 1, the ITA should be fully staffed across the agency, with a system of "warrants" delineating who is an expert in what. Overseeing the whole organization

Morring, Frank, Jr.

Robot Rescue

Tests with robots and the high-fidelity Hubble Space Telescope mockup astronauts use to train for servicing missions have convinced NASA managers it may be possible to maintain and upgrade the orbiting observatory without sending a space shuttle to do the job. In a formal request last week, the agency gave bidders until July 16 to sub-mit proposals for a robotic mission to the space telescope before the end of 2007. At a minimum, the mission would attach a rocket motor to deorbit the telescope safely when its service life ends. In the best case, it would use state-of-the- art robotics to prolong its life on orbit and install new instruments. With the space shuttle off-limits for the job under strict post-Columbia safety policies set by Administrator Sean O'Keefe, NASA has designed a "straw- man" robotic mission that would use an Atlas V or Delta N to launch a 20,ooO-lb. "Hubble Robotic Vehicle" to service the telescope. There, a robotic arm would grapple it, much as the shuttle does.

Morring, Frank, Jr.

Destinations

This is an article from Aviation Week, & Space Technology, entitled "Destinations". The strains facing the U.S. agency are discussed, such as the choice regarding a vehicle to return lunar samples, and the mission dubbed MoonRise. The U.S. space agency has enlisted the aid of academia and industry in developing new strategic plans for 13 areas, including Solar System exploration, in light of the new space initiative. As the Solar System planners work, they may be guided by some new science from the beyond.

Morring, Frank, Jr.