Morris, Dan

Publications and source records attributed to Morris, Dan.

Precision-controlled ultrafast electron microscope platforms. A case study: Multiple-order coherent phonon dynamics in 1T-TaSe2 probed at 50 fs–10 fm scales

We report on the first detailed beam tests attesting the fundamental principle behind the development of high-current-efficiency ultrafast electron microscope systems where a radio frequency (RF) cavity is incorporated as a condenser lens in the beam delivery system. To allow for the experiment to be carried out with a sufficient resolution to probe the performance at the emittance floor, a new cascade loop RF controller system is developed to reduce the RF noise floor. Temporal resolution at 50 fs in full-width-at-half-maximum and detection sensitivity better than 1% are demonstrated on exfoliated 1T-TaSe2 system under a moderate repetition rate. To benchmark the performance, multi-terahertz edge-mode coherent phonon excitation is employed as the standard candle. The high temporal resolution and the significant visibility to very low dynamical contrast in diffraction signals via high-precision phase-space manipulation give strong support to the working principle for the new high-brightness femtosecond electron microscope systems.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Improving Solar and Solar+Storage Screening Techniques to Reduce Utility Interconnection Time and Costs (Final Technical Report)

Residential PV installations have increased rapidly over the last decade, and the increased application volume has caused permitting delays and lower overall adoption rates. In this project, we developed and evaluated whether data-driven secondary modeling and screening techniques can help utilities assess customer applications more accurately than traditional screening shortcuts. Secondary topologies are predicted using decision trees and commonly available information, such as service transformer, customer, and street locations. Conductors were predicted using a logistic regression method based on real world object (RWO) types, service transformer ratings, conductor length, and distance to transformer. After developing the combined primary and secondary distribution network model, hosting capacity results were used to train a random forest model to predict the pass/fail likelihood of a customer application. Powerflow based models with predicted secondaries and data-driven methods both increased the screening success rate, relative to common utility heuristics, by as much as 55 percentage points. Data-driven screening techniques were described by one utility as a "right-sized" approach for residential customers given the low-risk of small errors and the high-cost of accurate modeling.

14 SOLAR ENERGY↗

Supervised Learning for Distribution Secondary Systems Modeling: Improving Solar Interconnection Processes

The current interconnection process and hosting capacity analysis for distributed energy resources (DERs), such as photovoltaics (PV) and battery energy storage systems, are based on analyzing grid network constraints (voltage and thermal) using only medium-voltage distribution network models. This is because most utilities do not have secondary low-voltage system models that connect service transformers and residential customers. This is important because in many cases the main impact of interconnecting DERs could occur on the low-voltage distribution systems. This paper proposes a supervised learning method to approximate local secondary models to improve the interconnection process. The proposed supervised learning method includes a decision tree model that predicts the secondary topology and a logistic regression model that predicts conductor types. The case studies demonstrate the benefits of including secondary low-voltage circuits in the interconnection process. We report the proposed modeling methodology is readily scalable and thus can reduce the cost and effort of PV interconnection for the industry and stakeholders.

14 SOLAR ENERGY↗