Search NASA⌕ Search

Engineering topics

Morton, C.

Publications and source records attributed to Morton, C..

Commissioning Status of the Linac for the Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams will be completed in late 2021. Here, we report here on the current efforts to commission the first stages of the 200-MeV/u superconducting, continuous wave heavy-ion linac. The statuses of the cryogenic plant and its distribution system, the accelerator cryomodule commissioning and operations, the ion source and front end transport development, the radio-frequency quadrupole commissioning, and then beam dynamics development to support high-power operation are reviewed. Plans for commissioning the remainder of the linac systems are presented.

43 PARTICLE ACCELERATORS↗

Containerless Liquid to Solid Nucleation Pathways in Two Representative Grades of Commercially Available Zirconium

Experimental measurements were conducted to determine the solid metal nucleation pathways of radiatively cooling, molten zirconium spheres of two different commercially available purity grades in a high-vacuum, high-temperature electrostatic levitator. The ensemble distribution of maximum undercooling temperatures was interpreted using Poisson statistics to determine the temperature dependence of the solid metal nucleation rate. For a sample of nominally 99.95% pure zirconium, the results are consistent with heterogeneous solid metal nucleation either on static catalyst particles at least approx. 30 nm diameter or on a surface coating. For a sample of nominally 99% pure zirconium, however, it appears that heterogeneous solid metal nucleation occurred either on a polydispersion of approx. 10 nm (mean diameter) static catalyst particles or on dynamic catalyst particles that precipitated from a solution that became supersaturated as the melt cooled.

Rulison, A. J.↗