Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

Champion, Mark↗

Multipacting analysis of the SNS drift tube linac (DTL) RF vacuum window using Spark3d

An ongoing study at the Spallation Neutron Source (SNS) seeks to better understand and address potential multipacting issues associated with the Drift Tube Linac (DTL) RF vacuum windows. An analysis of several failed operational windows showed indications of excessive RF heating on the TiN-coated alumina ceramics. Coupled with vacuum bursts and arcing during conditioning and/or operational periods, these problems have been attributed to electron activity likely caused by multipacting. The status of the study, 3-D electromagnetic simulation results, mitigating techniques and a future experimental plan for studying multipacting in the SNS DTL vacuum windows are presented.

Toby, George↗

Design and fabrication of the waveguide Iris couplers for the Spallation Neutron Source drift tube linac

The Spallation Neutron Source (SNS) employs six cavities in the Drift Tube Linac (DTL) section to accelerate the H- ion beam to 87MeV. Each cavity is energized by a 2.5MW peak power klystron at 402.5MHz using rapid tapered waveguide iris couplers. All six original iris couplers have been in operation without replacement for over two decades. The increased RF power demands of the Proton Power Upgrade (PPU) project and operational problems, including arcing, temperature excursions, and vacuum bursts, have prompted the development of new iris coupler spares. The original iris couplers were made of GlidCop material, which is known to be mechanically strong and thermally stable, but is porous, expensive, and difficult to use in fabrication. To overcome these problems, the new spare couplers use Oxygen-Free Copper (OFC) and stainless steel (SS). This paper will discuss the mechanical, thermal and RF design, as well as challenges in the final coupler fabrication.

Lee, Sung-Woo↗

High Power Radiofrequency Operation of the Radiofrequency Quadrupoles in the Spallation Neutron Source

The Spallation Neutron Source (SNS) recently took delivery of a third Radiofrequency Quadrupole (RFQ03) that will ultimately be installed on the front-end (FE) of the SNS Linac. The first RFQ (RFQ01) operated in the SNS FE for more than a decade before being replaced with the second RFQ (RFQ02). RFQ01 was relocated to the Beam Test Facility (BTF) where it operated for five more years. The RFQ02 was initially installed in the BTF for high power testing and used with H- beam for BTF operation. It replaced RFQ01 in the SNS FE in 2017 and has been operating for beam production since then. There are some differences between the three RFQs. RFQ01 has a square cross-section with pi-mode stabilizing loops (PISLs) with the structure being fabricated using two layers of materials, GlidCop outside and OFHC inside. RFQ02 and RFQ03 has an octagonal cross-section with end-wall stabilizer rods and was fabricated using OFHC only. RFQ01 suffered some field flatness distortion incidents that resulted in degradation in beam transmission efficiency and required RF tuning. RFQ02 has performed well but had a melted RF seal in the high energy end wall, that was ultimately mitigated by a redesign of the end flange seals. The SNS decided to order RFQ03 that has a design that followed that of RFQ02 closely, but end-wall contacts were modified to prevent RF seal failure. This report presents the testing, installation, high power RF operation, and design improvements of the RFQ03.

Ren, Haitao↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

Design Enhancements for the SNS RFQ Coaxial Coupler

The H⁻ ion linear accelerator at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory operates with reliability that routinely surpasses 90% during scheduled beam operation. With the ambitious goal of eventually achieving at least 95% availability, several upgrade and improvement projects are ongoing. One such project is the modification of the coaxial couplers that transfer radio frequency (RF) power to the accelerator’s Radio Frequency Quadrupole (RFQ). The proposed modification utilizes stub sections and capacitive coupling to construct a physically separable assembly with DC isolation. With a separated coupler assembly, the section that includes the magnetic coupling loop can be permanently mounted to the RFQ which would eliminate the need to re-adjust the couplers after maintenance activities, upgrades, and repairs. Additionally, the modified design would provide increased multipaction suppression with DC biasing and potentially lower thermal gradients across the device. This paper presents the design and simulation results of the project.

Toby, George↗

Mitigating Cathode Overcurrent Faults at the Spallation Neutron Source

The high-power klystron amplifiers at the Spallation Neutron Source (SNS) have been in operation for over 100,000 hours. Overcurrent faults from the klystron cathodes comprise the bulk of RF System downtime. Reliable operation is of particular interest to the SNS, and data from over a decade of operation is used to help mitigate repetitive overcurrent conditions.

Moss, John↗

SNS Warm Linac Circulator Breakdown Considerations for the PPU Project

Multipacting in accelerating structures is a complex phenomenon about which there is much to be understood. While multipacting research efforts have primarily been focused on superconducting radio frequency (SRF) systems, normal conducting accelerating structures which have a higher thermal capacity, and a greater vacuum pressure tolerance could benefit from additional investigation. This research details multipacting simulation methods and the results of 3-D electromagnetic simulations of RF vacuum windows used on normal conducting linac (NCL) cavities. Benchmarking of the peak electric fields in these structures, benefits of material processing and possible techniques for reducing or eliminating multipacting activities are discussed.

Toby, George↗

Spallation Neutron Source Proton Power Upgrade Low-Level RF Control System Development

The Proton Power Upgrade (PPU) Project is approved for the Spallation Neutron Source at Oak Ridge National Laboratory and will double the proton beam power capability from 1.4 MW to 2.8 MW with 2 MW beam power available to the first target station. A second target station is planned and will utilize the remaining beam power in the future. The proton power increase will be supported with the addition of twenty-eight new superconducting cavities powered by 700 kW peak power klystrons to increase beam energy while increases to the beam current will be done with a combination of existing RF margin, and DTL HPRF upgrades. The original low-level RF control system has proven to be reliable over the past 15 years of operations, but obsolescence issues mandate a replacement system be developed for the PPU project. The replacement system is realized in a µTCA.4 platform using a combination of commercial off-the-shelf boards and custom hardware to support the requirements of PPU. This paper presents the prototype hardware, firmware, and software development activities along with preliminary testing results of the new system.

Crofford, Mark↗

Multipacting Analysis of Warm Linac RF Vacuum Windows

Multipacting in accelerating structures is a complex phenomenon with which there is much to be understood. While multipacting research efforts have primarily been focused on superconducting radio frequency (SRF) systems, normal conducting accelerating structures that have a higher thermal capacity and a greater vacuum pressure tolerance could benefit from additional investigation. This research details multipacting simulation methods and the results of 3-D electromagnetic simulations of RF vacuum windows used on normal conducting linac (NCL) cavities. Possible techniques for reducing and eliminating multipacting activities in these structures are discussed.

Toby, George↗

Progress on the Proton Power Upgrade at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.

Barbier, Charlotte↗