Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Schedule Plan
This document outlines the schedule plan for the Integrated Advanced Microwave Sounding Unit-A (AMSU-A).
Engineering topics
Publications and source records attributed to Mullooly, William.
This document outlines the schedule plan for the Integrated Advanced Microwave Sounding Unit-A (AMSU-A).
This is the thirty-first monthly report for the Earth Observing System (EOS)/Advanced Microwave Sounding Unit- A (AMSU-A), Contract NAS5-32314, and covers the period from 1 July 1995 through 31 July 1995. This period is the nineteenth month of the Implementation Phase which provides for the design, fabrication, assembly, and test of the first EOS/AMSU-A, the Protoflight Model. Included in this report is the Master Program Schedule (Section 2), a report from the Product Team Leaders on the status of all major program elements (Section 3), Drawing status (Section 4), Weight and Power Budgets (CDRL) 503 (Section 5), Performance Assurance (CDRL 204) (Section 6), Configuration Management Status Report (CDRL 203) (Section 7), Documentation/Data Management Status Report (Section 8), and Contract Status (Section 9).