Muratore, J.

Publications and source records attributed to Muratore, J..

First results of AUP Nb3Sn quadrupole horizontal tests

The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the field strength. This will be the first ever large-scale implementation of Nb3Sn magnets in a particle accelerator. The High-Luminosity LHC Upgrade, HL-LHC is a CERN project with a world-wide collaboration. It is under construction and utilizes Nb3Sn Magnets (named MQXF) as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC. This paper will present the program to fabricate the Nb3Sn superconducting magnets. We are reporting the status of the HL-LHC AUP project present the results from horizontal tests of the first fully assembled cryo-assembly.

43 PARTICLE ACCELERATORS↗

Analysis of the MQXFA Low Beta Quadrupoles for HL-LHC after 50% magnet assembly complete +

The US HL-LHC Accelerator Upgrade Project (AUP) is fabricating the MQXFA magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC (HL-LHC). This is the first production of Nb3Sn magnets for a particle accelerator, together with the MQXFB magnets for Q2a and Q2b. Here we show status and some results of MQXFA magnets fabrication and vertical test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Analysis of the Mechanical Performance of the 4.2-m-Long MQXFA Magnets for the Hi-Lumi LHC Upgrade

Under the U.S. High Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP), the 150 mm bore, high-field Nb 3 Sn low-{eta}_MQXFA quadrupole magnets are being fabricated, assembled and tested, in the context of the CERN Hi-Luminosity LHC (HL-LHC) upgrade. These magnets have 4.2 m magnetic length and 4.56 m long iron yoke. To date, eight MQXFA magnets have been tested. One of the magnets additionally underwent a successful endurance test with 40 triggered quenches, and two magnets did not perform as expected. This work summarizes for the first time the available strain gauge data from eight identical Nb 3 Sn MQXFA tested magnets, focusing on the endurance test, and on a possible cause of underperformance of the two magnets that did not pass the vertical test. Here we applied methods to prevent this from happening in future MQXFA magnets, which shown to be effective for last two tested magnets.

43 PARTICLE ACCELERATORS↗

Status and Challenges of the Interaction Region Magnets for HL-LHC

About one hundred magnets of six different types shall be installed in the High Luminosity LHC (HL-LHC) in the years 2026-2028 at CERN. The magnets design, construction and test are based on CERN collaborations with institutes and industrial partners in USA, Spain, Italy, Japan and China. Three types of correctors are based on Nb-Ti technology and feature conductor peak fields in the 2 to 4 T range: for all of them the prototype phase has been successfully completed. The production is well advanced for the superferric correctors, and is starting for the canted cosine theta correctors and for the nested correctors. The separation and recombination Nb-Ti dipoles D1 and D2, with a 4.5-6 T bore field range, are both in the prototype phase after the completion of the short model program. The most challenging magnet, the Nb 3 Sn quadrupole with conductor peak field above 11 T, is in the prototype phase at CERN and halfway through the production phase in the USA. In this paper we will give, for each type of magnet, an overview of the main achievements obtained so far and we will outline the technical points still needing validation from the prototype program.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Advancing Superconducting Magnet Diagnostics for Future Colliders

Future colliders will operate at increasingly high magnetic fields pushing limits of electromagnetic and mechanical stress on the conductor [1]. Understanding factors affecting superconducting (SC) magnet performance in challenging conditions of high mechanical stress and cryogenic temperatures is only possible with the use of advanced magnet diagnostics. Diagnostics provide a unique observation window into mechanical and electromagnetic processes associated with magnet operation, and give essential feedback to magnet design, simulations and material research activities. Development of novel diagnostic capabilities is therefore an integral part of next-generation magnet development. In this paper, we summarize diagnostics development needs from a prospective of the US Magnet Development Program (MDP), and define main research directions that could shape this field in the near future.

43 PARTICLE ACCELERATORS↗

High current, high-temperature operation test of the superconducting magnets in the RHIC yellow ring

We report on the tests conducted at the end of RHIC Run 21 to evaluate the operation of superconducting magnets in the RHIC yellow ring at higher currents – up to 5500 A for the arc dipoles and all other magnets on the dipole bus and the focusing arc quadrupoles, up to 5750 A for defocusing arc quadrupoles and up to 6000 A for the insertion quadrupoles Q1 through Q9 – and higher temperatures – up to 5.1 K – than routine. None of the magnets quenched. This is an encouraging finding as the superconducting magnet coils could reach up to 4.9 K during operation with the 275 GeV EIC hadron beams.

43 PARTICLE ACCELERATORS↗

A BEAM SCREEN TO PREPARE THE RHIC VACUUM CHAMBER FOR EIC HADRON BEAMS: CONCEPTUAL DESIGN AND REQUIREMENTS

The Electron Ion Collider (EIC) Hadron Storage Ring (HSR) will use the existing Relativistic Heavy Ion Collider storage rings, including the superconducting magnet arcs [1]. The vacuum chambers in the superconducting magnets and the cold mass interconnects were not designed for EIC beams and so must be updated to reduce resistive-wall heating and to suppress e-clouds. To do so without compromising the EIC luminosity goal, a stainless steel beam screen with colaminated copper and a thin layer of amorphous carbon will be installed. This paper describes the main requirements that our solution for the hadron ring vacuum chamber needs to satisfy, including impedance, aperture limitations, vacuum, thermal and structural stability, mechanical design, installation and operation. The conceptual design of the beam screen currently under development is introduced.

43 PARTICLE ACCELERATORS↗

Space Station Information System integrated communications concept

This paper presents a model for integrated communications within the Space Station Information System (SSIS). The SSIS is generally defined as the integrated set of space and ground information systems and networks which will provide required data services to the Space Station flight crew, ground operations personnel, and customer communities. This model is based on the International Standards Organization (ISO) layered model for Open Systems Interconnection (OSI). The requirements used to develop the model are presented, and the various elements of the model described.

Muratore, J.↗

Space Station Information System requirements for integrated communications

Space Station Information System (SSIS) requirements for integrated end-to-end communications are presented. The SSIS is defined as the integrated set of space and ground data and information systems and networks which will provide required data services to the Space Station flight crew, ground operations personnel, and customer communities. This model is based on the International Standards Organization (ISO) layered model for Open System Interconnection (OSI). These SSIS requirements include grades of service, priority classifications, systems management, flow control, bandwidth allocation, and standard SSIS data services.

Marker, W.↗