Search NASASearch

Engineering topics

Murphy, W. J.

Publications and source records attributed to Murphy, W. J..

Managing cooperative research and development ventures

As cooperative ventures to conduct research and development become increasingly attractive, management of these collective undertakings poses new challenges to executives. In selecting the most appropriate organizational structure and strategy the author suggests that the collective enterprise executive must strike the best balance among three distinct but related elements: contribution of the participants; creation of benefits; and transfer of benefits to contributors. Eight types of cooperative R&D ventures are proposed with discussion of the unique management tasks associated with each type.

Murphy, W. J.

Barium release system

A chemical system is described for releasing a good yield of free barium neutral atoms and barium ions in the upper atmosphere and interplanetary space for the study of the geophysical properties of the medium. The barium is released in the vapor phase so that it can be ionized by solar radiation and also be excited to emit resonance radiation in the visible range. The ionized luminous cloud of barium becomes a visible indication of magnetic and electrical characteristics in space and allows determination of these properties over relatively large areas at a given time.

Lewis, B. W.

Design, testing, fabrication and launch support of a liquid chemical barium release payload (utilizing the liquid fluorine-barium salt/hydrazine system)

A payload was designed which included a cryogenic oxidizer tank, a fuel tank, and burner section. Release of 30 lb of chemicals was planned to occur in 2 seconds at the optimum oxidizer to fuel ratio. The chemicals consisted of 17 lb of liquid fluorine oxidizer and 13 lb of hydrazine-barium salt fuel mixture. The fuel mixture was 17% barium chloride, 16% barium nitrate, and 67% hydrazine, and contained 2.6 lb of available barium. Two significant problem areas were resolved during the program: explosive valve development and burner operation. The release payload was flight tested, from Wallops Island, Virginia. The release took place at an altitude of approximately 260 km. The release produced a luminous cloud which expanded very rapidly, disappearing to the human eye in about 20 seconds. Barium ion concentration slowly increased over a wide area of sky until measurements were discontinued at sunrise (about 30 minutes).

Stokes, C. S.