Search NASA⌕ Search

Engineering topics

Nakadaira, T

Publications and source records attributed to Nakadaira, T.

Status of Superconducting Magnet System for the J-PARC Neutrino Beam Line

The superconducting magnet system for the J-PARC neutrino beam line for the T2K experiment has been served for the beam operation without serious disturbance since April 2009. Present most concern of the system is the operational current limit of superconducting corrector magnets for beam steering due to systematic quenches at lower currents. Operational experience of the magnet system and examples of troubleshoot including countermeasures against the corrector magnet quenches are presented.

99 GENERAL AND MISCELLANEOUS↗

Construction of Superconducting Magnet System for the J-PARC Neutrino Beam Line

Following success of a prototype R&D, construction of a superconducting magnet system for J-PARC neutrino beam line has been carried out since 2005. A new conceptual beam line with the superconducting combined function magnets demonstrated the successful beam transport to the neutrino production target.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

T2K

The project status of T2K is presented. T2K will search for the {nu}{sub {mu}}{yields}{nu}{sub e} oscillation using the high intensity {nu}{sub {mu}} beam produced by J-PARC. The experimental setup and the prospects are discussed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

T2K Target

We have reported the current development status of the graphite target for J-PARC neutrino beam-line. The conceptual design, the lifetime estimation, the cooling method based of the latest design, and the prototype productions are discussed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗