Processing cargoes for the first two operational STS flights at KSC
Payload and spacecraft check-out procedures followed at Kennedy Space Center (KSC) are described, and examples are furnished of Shuttle missions STS-5 and -6. Reliability must be assured in order to account for isolated operation in GEO once the satellites are released from the Orbiter. The spacecraft processing is handled in distinct flows that depend on the type of boost engine attached, e.g., the PAM-A, -D, or the IUS. Interface verification occurs in the Vehicle Processing Facility (VPF), which is equipped to store the payloads until an Orbiter is ready. Spacecraft are assigned to their respective processing lines by the Launch Site Support Manager. The STS-5 Orbiter was fitted with Getaway Specials, the SBS-C satellite, and the Anik-C spacecraft, and STS-6 carried the TDRSS-A spacecraft, which was mated to an IUS, three Getaway Specials, and two experiments for the pressurized cabin. The time necessary for preparing payloads is intended eventually to be reduced to 3 weeks.