Predictive Flow Simulation with the P2R Model for the Composite Analysis Base Case
In order to meet the requirements of U.S. Department of Energy (DOE) in DOE O 435.1 Chg. 1, Radioactive Waste Management, a Composite Analysis (CA) must be completed for the Central Plateau at the Hanford Site. The CA requires estimates of fate and transport of radionuclides in the groundwater from multiple sources within the modeling domain. This document details the application of the P2R Model version 8.3 to predict the flow of groundwater on the Central Plateau for the 10,000-year simulation to support the CA. The simulated flow field will support the simulation of fate and transport of contaminants for use in predicting dose as part of the CA.
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗