Trial Implementation of the High-Impact, Low-Frequency Power Grid Event Risk Framework to Support Informed Decision-Making

In 2015, Pacific Northwest National Laboratory (PNNL) developed a multi-hazard risk-assessment framework for modeling high-impact, low-frequency (HILF) power grid events to support risk-informed decisions for power grid management and emergency planning. The identified framework elements are based on a systematic and comprehensive characterization of hazards to the level of detail required for modeling risk. In 2016, PNNL performed a trial implementation of the framework for a single hazard category and a set of key power grid asset types as a way to test the framework. A specific realization of a HILF event is referred to as an initiating event, or initiator. An initiating event is the manifestation of a hazard, and can be, for example, an earthquake of specified magnitude at a specified epicenter. Other examples of HILF events include geomagnetic disturbances and pandemics. For this test implementation, grid assets of a benchmark power system transmission network were assigned proxy geographical coordinates associated with Washington State locations; and real-world seismic hazard information was used for those locations. Based on the fragility of the grid assets to events of different severities, the set of possible failure scenarios (i.e., combinations of different asset failures) and their associated probabilities were determined, and recovery of grid assets and restoration of the network were considered. These combinations of failures and their subsequent recovery constitute a HILF event sequence that results in a given level of consequence, such as loss of power over a given geographic area for a given duration. The concurrent quantitative consideration of event probabilities and event consequences characterizes a risk model. For HILF event sequences, risk was expressed as expected unserved energy per year. This implementation demonstrates the feasibility and value of using the HILF event risk framework despite some of the identified challenges. This report discusses this trial implementation and presents risk results and insights from the implementation.

Veeramany, Arun↗

Modeling Impacts of Climate Change Mitigation Technologies on Power Grids

This paper describes a modeling approach that simulate the impacts of different climate change mitigation technologies on power grids for power system planning purposes. Because the historical data is less credible when new technologies are being deployed to the system, it is then critical to model them to address their impacts. This paper illustrated how to integrate modeling results obtained from different modeling tools to give a reasonable forecast of the future. Building simulation tools, distribution power grid modeling tools, and power system planning tools are used to model and aggregate the impacts from the end-use to the system level. Electricity generation, production cost, emission, and transmission congestions are used to quantify the influence of different mitigation technologies. Modeling results have shown that the cross-discipline modeling approach provided the modeler with the necessary time resolution and input details to address the variables that influence the modeling results. Different modeling issues are also addressed in the paper.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Storage for Variable Renewable Energy Resource Integration - A Regional Assessment for the Northwest Power Pool (NWPP)

This paper addresses the following key questions in the discussion on the integration of renewable energy resources in the Pacific Northwest power grid: a) what will be the future balancing requirement to accommodate a simulated expansion of wind energy resources from 3.3 GW in 2008 to 14.4 GW in 2019 in the Northwest Power Pool (NWPP), and b) what are the most cost effective technological solutions for meeting the balancing requirements in the Northwest Power Pool (NWPP). A life-cycle analysis was performed to assess the least-cost technology option for meeting the new balancing requirement. The technologies considered in this study include conventional turbines (CT), sodium sulfur (NaS) batteries, lithium ion (Li-ion) batteries, pumped hydro energy storage (PH), and demand response (DR). Hybrid concepts that combine 2 or more of the technologies above are also evaluated. This analysis was performed with collaboration by the Bonneville Power Administration and funded by the Energy Storage Systems Program of the U.S. Department of Energy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact Assessment of Plug-in Hybrid Vehicles on the U.S. Power Grid

The US electricity grid is a national infrastructure that has the potential to deliver significant amounts of the daily driving energy of the US light duty vehicle (cars, pickups, SUVs, and vans) fleet. This paper discusses a 2030 scenario with 37 million plug-in hybrid electric vehicles (PHEVs) on the road in the US demanding electricity for an average daily driving distance of about 33 miles (53 km). The paper addresses the potential grid impacts of the PHEVs fleet relative to their effects on the production cost of electricity, and the emissions from the electricity sector. The results of this analysis indicate significant regional difference on the cost impacts and the CO2 emissions. Battery charging during the day may have twice the cost impacts than charging during the night. The CO2 emissions impacts are very region-dependent. In predominantly coal regions (Midwest), the new PHEV load may reduce the CO2 emission intensity (ton/MWh), while in others regions with significant clean generation (hydro and renewable energy) the CO2 emission intensity may increase. Discussed will the potential impact of the results with the valuation of carbon emissions.

01 COAL, LIGNITE, AND PEAT↗

Energy Storage for Power Systems Applications: A Regional Assessment for the Northwest Power Pool (NWPP)

Wind production, which has expanded rapidly in recent years, could be an important element in the future efficient management of the electric power system; however, wind energy generation is uncontrollable and intermittent in nature. Thus, while wind power represents a significant opportunity to the Bonneville Power Administration (BPA), integrating high levels of wind resources into the power system will bring great challenges to generation scheduling and in the provision of ancillary services. This report addresses several key questions in the broader discussion on the integration of renewable energy resources in the Pacific Northwest power grid. More specifically, it addresses the following questions: a) how much total reserve or balancing requirements are necessary to accommodate the simulated expansion of intermittent renewable energy resources during the 2019 time horizon, and b) what are the most cost effective technological solutions for meeting load balancing requirements in the Northwest Power Pool (NWPP).

17 WIND ENERGY↗

Wide Area Security Region Final Report

This report develops innovative and efficient methodologies and practical procedures to determine the wide-area security region of a power system, which take into consideration all types of system constraints including thermal, voltage, voltage stability, transient and potentially oscillatory stability limits in the system. The approach expands the idea of transmission system nomograms to a multidimensional case, involving multiple system limits and parameters such as transmission path constraints, zonal generation or load, etc., considered concurrently. The security region boundary is represented using its piecewise approximation with the help of linear inequalities (so called hyperplanes) in a multi-dimensional space, consisting of system parameters that are critical for security analyses. The goal of this approximation is to find a minimum set of hyperplanes that describe the boundary with a given accuracy. Methodologies are also developed to use the security hyperplanes, pre-calculated offline, to determine system security margins in real-time system operations, to identify weak elements in the system, and to calculate key contributing factors and sensitivities to determine the best system controls in real time and to assist in developing remedial actions and transmission system enhancements offline . A prototype program that automates the simulation procedures used to build the set of security hyperplanes has also been developed. The program makes it convenient to update the set of security hyperplanes necessitated by changes in system configurations. A prototype operational tool that uses the security hyperplanes to assess security margins and to calculate optimal control directions in real time has been built to demonstrate the project success. Numerical simulations have been conducted using the full-size Western Electricity Coordinating Council (WECC) system model, and they clearly demonstrated the feasibility and the effectiveness of the developed technology. Recommendations for the future work have also been formulated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transient Stability of the Grid with a Wind Power Plant

This paper reports on an investigation of the impact of wind power plant penetration on the transient stability of the grid. Transient stability for different faults is investigated via simulation. A wind power plant with 22 turbines operated in variable speed mode will be used as the subject of the study. As a comparison, we replace the wind power plant with a conventional wind power plant (synchronous generator) and compare the results for the same faults. We also consider the effect of different locations.

17 WIND ENERGY↗

Assessing the Value of Regulation Resources Based on Their Time Response Characteristics

Fast responsive regulation resources are potentially more valuable as a power system regulation resource (more efficient) because they allow applying controls at the exact moment and in the exact amount as needed. Faster control is desirable because it facilitates more reliable compliance with the NERC Control Performance Standards at relatively lesser regulation capacity procurements. The current California ISO practices and markets do not provide a differentiation among the regulation resources based on their speed of response (with the exception of some minimum ramping capabilities). Some demand response technologies, including some generation and energy storage resources, can provide quicker control actions. California ISO practices and markets could be updated to welcome more fast regulation resources into the California ISO service area. The project work reported in this work was pursuing the following objectives: • Develop methodology to assess the relative value of generation resources used for regulation and load following California ISO functions • This assessment should be done based on physical characteristics including the ability to quickly change their output following California ISO signals • Evaluate what power is worth on different time scales • Analyze the benefits of new regulation resources to provide effective compliance with the mandatory NERC Control Performance Standards • Evaluate impacts of the newly proposed BAAL and FRR standards on the potential value of fast regulation and distributed regulation resources • Develop a scope for the follow-up projects to pave a road for the new efficient types of balancing resources in California. The work included the following studies: • Analysis of California ISO regulating units characteristics • California ISO automatic generation system (AGC) analysis • California ISO regulation procurement and market analysis • Fast regulation efficiency analysis • Projection of the California ISO load following and regulation requirements into the future • Value of fast responsive resources depending on their ramping capability • Potential impacts of the balancing authority area control error limit (BAAL), which is a part of the newly proposed NERC standard “Balancing Resources and Demand” • Potential impacts of the Western Electricity Coordinating Council (WECC) frequency responsive reserve (FRR) standard • Recommendations for the next phase of the project. The following main conclusions and suggestions for the future have been made: • The analysis of regulation ramping requirements shows that the regulation system should be able to provide ramps of at least 40-60 MW per minute for a period up to 6 minutes. • Evaluate if changes are needed in the California ISO AGC system to effectively accommodate new types of fast regulation resources and minimize the California ISO regulation procurement. • California ISO may consider creating better market opportunities for and incentives for fast responsive resources. • An additional study of low probability high ramp events can be recommended to the California ISO. • The California ISO may be willing to consider establishing a more relaxed target CPS2 compliance level. • A BAAL-related study can be recommended for the California ISO as soon as more clarity is achieved concerning the actual enforcement of the BAAL standard and its numerical values for the California ISO. The study may involve an assessment of advantages of the distributed frequency-based control for the California ISO system. The market-related issues that arise in this connection can be also investigated. • A FRR-related study can be recommended for the California ISO as soon as more clarity is achieved concerning the actual enforcement of the FRR standard and its numerical values for the California ISO.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Model Validation of Power System Components Using Hybrid Dynamic Simulation

Hybrid dynamic simulation, with its capability of injecting external signals into dynamic simulation, opens the traditional dynamic simulation loop for interaction with actual field measurements. This simulation technique enables rigorous comparison between simulation results and actual measurements and model validation of individual power system components within a small subsystem. This paper uses a real example of generator model validation to illustrate the procedure and validity of the component model validation methodology using hybrid dynamic simulation. Initial model calibration has also been carried out to show how model validation results would be used to improve component models