Corrigendum to ‘Under-capacitated and over-powered? Rural austerity and asymmetrical negotiating relationships in US wind energy development’ [J. Rural Stud., 119 (2025) 1–14]

The authors regret that there is an incomplete sentence in the abstract of the article, and request that the portion “, and counties incre” be deleted from the abstract (found at the end of the sentence beginning with “However …”). The portion to be deleted is underlined and bolded below. The authors would like to apologise for any inconvenience caused. Current abstract: Though rural local governments are central actors in renewable energy development, local governments in the United States (US) remain systematically under-funded. This paper considers what the manifestations of austerity in local governments broadly and rural localities specifically mean for renewable energy development and for energy transitions. Drawing on a survey of 262 elected county officials with experience with wind energy in eight US states, this paper asks how local officials understand the impacts of wind development, how local governments are involved in wind energy negotiations, how the resources and expertise needed to navigate negotiations are distributed among counties, and analyze the relationship between local capacity, access to resources, and involvement in negotiations. We find that local officials express simultaneously affective and material concerns with the impacts of wind development and see negotiations with the developer as central to realizing local benefits. However, the expertise and staffing needed to negotiate with developers is less accessible to poorer or sparsely populated counties, and counties with lower overall revenues have narrower scopes of negotiation, and counties incre. Our results suggest that uneven rural capacity heightens an already asymmetrical relationship between localities and developers. In analyzing how infrastructure developments are shaped by relationships between localities and developers that are conditioned by austerity and (under)capacity, this paper contributes to and bridges scholarly discussions on rural austerity, rescaling, and renewable energy transitions. These results challenge conventional wisdoms around centralizing energy siting processes, contextualize popular and academic debates about opposition to renewable energy development, and highlight the need for rural reinvestment to realize meaningfully participatory energy developments.

Elmallah, Salma↗

Under-capacitated and over-powered? Rural austerity and asymmetrical negotiating relationships in US wind energy development

Though rural local governments are central actors in renewable energy development, local governments in the United States (US) remain systematically under-funded. This paper considers what the manifestations of austerity in local governments broadly and rural localities specifically mean for renewable energy development and for energy transitions. Drawing on a survey of 262 elected county officials with experience with wind energy in eight US states, this paper asks how local officials understand the impacts of wind development, how local governments are involved in wind energy negotiations, how the resources and expertise needed to navigate negotiations are distributed among counties, and analyze the relationship between local capacity, access to resources, and involvement in negotiations. We find that local officials express simultaneously affective and material concerns with the impacts of wind development and see negotiations with the developer as central to realizing local benefits. However, the expertise and staffing needed to negotiate with developers is less accessible to poorer or sparsely populated counties, and counties with lower overall revenues have narrower scopes of negotiation, and counties incre. Our results suggest that uneven rural capacity heightens an already asymmetrical relationship between localities and developers. In analyzing how infrastructure developments are shaped by relationships between localities and developers that are conditioned by austerity and (under)capacity, this paper contributes to and bridges scholarly discussions on rural austerity, rescaling, and renewable energy transitions. These results challenge conventional wisdoms around centralizing energy siting processes, contextualize popular and academic debates about opposition to renewable energy development, and highlight the need for rural reinvestment to realize meaningfully participatory energy developments.

Elmallah, Salma↗

Go slow to go fast? A review of the impacts of permitting on large-scale solar project development

State and local permitting challenges could impede the ability of large-scale solar (LSS) to meet growing electricity demand in the United States. Here, we review research that explores LSS permitting and its impacts on the pace and scale of LSS project development. Research on LSS permitting is relatively scarce, such that we support our review with research in the context of wind permitting, where appropriate. Further, few studies attempt to rigorously quantify the effects of permitting on the pace and scale of LSS project development. The available evidence allows us to identify various hypotheses and identify gaps for further research. Our review suggests that differences in permitting policies, regulations, and ordinances explain relatively little variation in LSS permitting and development outcomes across jurisdictions, except where jurisdictions implement rules designed to impede LSS. The evidence suggests LSS permitting challenges largely accrue during the implementation of permitting processes. Recent research suggests that community opposition to project development is a key driver of LSS permitting challenges, given that project opponents often use permitting processes to translate opposition into legal action. We call on future researchers to more concretely describe the LSS permitting challenge and to identify the specific actors responsible for implementing solutions.

Community opposition↗

Perceptions of Large-Scale Solar Project Neighbors: Results From a National Survey [Slides]

Driven by favorable economics, policy factors, and decarbonization goals, large-scale solar (LSS, defined here as ground-mounted photovoltaic projects ≥1 MWDC) has expanded rapidly in recent years, with more than 90 gigawatts (GW) now installed across the United States. Growth in LSS deployment is anticipated to accelerate in response to growing electricity demand and utility, state, and federal decarbonization goals. This continued expansion hinges, in part, on the continued support of local residents and decision-makers in communities hosting LSS projects. Understanding the perceptions and attitudes of existing LSS neighbors is critical to inform and enable future LSS deployment, and to improve outcomes for those host communities. As of 2022, there were more than 10 million U.S. homes within 3 miles of LSS plants. Yet, until recently, no comprehensive study had examined the experiences and perceptions of these LSS neighbors. In 2023, a Berkeley Lab team worked with the University of Michigan and Michigan State University to conduct the first-of-its-kind nationally representative survey of LSS neighbors as part of the Community-Centered Solar Development research project. The survey effort ultimately collected 984 responses from residents within 3 miles of existing LSS projects. The survey results are available for download via the full summary analysis slide deck report, as well as a shorter (~4 page) summary brief. The survey instrument (questionnaire) is also available for download for those interested in understanding the survey design or replicating questions in future research.

14 SOLAR ENERGY↗

Survey of Utility-Scale Wind and Solar Developers Report [Slides]

In 2023, Berkeley Lab conducted the first of its kind survey of industry professionals with direct experience working in community engagement and permitting of land-based, utility-scale wind and solar energy facilities in the U.S. The survey solicited information about project timelines over the last five years, leading causes of project delays and cancelations, community opposition, experience with permitting authorities, community engagement, comparisons between wind and solar, and other related topics. A total of 123 individuals responded to the survey for a response rate of 19.2%. Respondents were employed at 62 unique companies, which together are responsible for approximately half of the wind and solar developed from 2016 to 2023.

14 SOLAR ENERGY↗

Community Centered Solar Development (CCSD) Case Study Interviews [Slides]

Large-scale solar (LSS, defined here as ground-mounted photovoltaic projects ≥1 MWDC) has grown rapidly in the U.S., accounting for nearly half of new electric generating capacity added to the U.S. grid in 2022. All sources of electricity bring positive and negative impacts to hosting communities and the rapid growth of LSS has increased the urgency to understand those impacts. Yet, information about the potential positive and negative impacts of LSS on host communities, and the factors or drivers leading to support or opposition to a project, is lacking. This information gap limits how project developers, municipalities, and local siting authorities can address community concerns and appropriately align proposed projects to best suit and benefit local communities. As part of Berkeley Lab’s Community-Centered Solar Development (CCSD) project, this research set out to explore deep insights and perceptions from LSS stakeholders that only qualitative data can provide to identify key factors driving project success or threatened failure. Case studies, such as those utilized in this research, are uniquely adept at capturing the subjective experience of individuals and at identifying variables, structures, and interactions between stakeholders. Our case studies included 54 semi-structured interviews across 7 different LSS sites, representing a diversity of geographies, project sizes (MW), site types (i.e., greenfield, agrivoltaic, and brownfield / contaminated sites), zoning jurisdiction types, and more (Table 1). In addition to local residents living in close proximity to these LSS sites, we interviewed other key stakeholders involved in the projects such as developers, decision-makers, utility representatives, landowners, and individuals from community-based organizations. The overarching aim of this case study research was two-fold: (1) to inform subsequent tasks in the CCSD research project (including an upcoming national survey of LSS neighbors), and (2) to provide insights into the following set of research questions: -What are the key positive and negative drivers leading to support and opposition to LSS projects? -To what extent do LSS projects exacerbate or mitigate perceived inequities and marginalization within hosting communities and how can those inequities be mitigated going forward? -What strategies can communities employ to align LSS development with local land-use plans and community needs and values? The research findings and next steps are described in this slide deck report.

14 SOLAR ENERGY↗