High voltage delivery and distribution for the NEXT-100 Time Projection Chamber
A critical element in the realization of large liquid andgas time projection chambers (TPCs) is the delivery and distributionof high voltages into and around the detector. Such experimentsrequire of order tens of kilovolts to enable electron drift overmeter-scale distances. This paper describes the design andoperation of the cathode feedthrough and high voltage distributionthrough the field cage of the NEXT-100 experiment, an undergroundTPC that will search for neutrinoless double beta decay0νββ. The feedthrough has been demonstrated to holdpressures up to 20 bar and sustain voltages as high as -65 kV.The TPC is operating stably at its design high voltages. The systemhas been realized within the constraints of a stringent radiopuritybudget and is now being used to execute a suite of sensitive doublebeta decay analyses.