Search NASASearch

Engineering topics

Ohno, Hirokazu

Publications and source records attributed to Ohno, Hirokazu.

DECOVALEX-2023: Task D Final Report

Task D of DECOVALEX-2023 is focused on the simulation of the coupled thermal hydraulic-mechanical (THM) behaviour in the full-scale engineered barrier system (EBS). The Horonobe EBS experiment is the demonstration of the full-scale EBS in the underground research laboratory (URL) (performed by JAEA in the Horonobe URL in Japan). Task D consisted of the three steps, a preliminary step (Step 0), simulation of the laboratory tests (Step 1) and simulation of the in-situ full-scale EBS experiment (Step 2). Since the Horonobe EBS experiment demonstrates the vertical emplacement option of the EBS, the experiment gallery is also backfilled with the backfill material. Therefore, interaction between the EBS and the backfill material can also be demonstrated, such as deformation (change of density) of the buffer material. The underground water in the Horonobe URL is saline. This fact adds chemical processes to THM behaviour. For example, mechanical properties (such as swelling pressure of the buffer material and backfill material) and hydraulic properties (such as permeability of the buffer material and backfill material) change depending on the water chemistry. Task D was therefore a challenging Task focused on not only the relatively simple THM behaviour but also complex THM behaviour including chemical processes. Six research teams (BGR, CAS, JAEA, KAERI, SNL and Taipower) participated the Task D. BGR, CAS, JAEA, KAERI and Taipower research teams selected a THM approach, while the SNL research team selected a TH approach. Step 1 involved the simulation of laboratory test results and was important to check the numerical codes developed by the research teams. Step 1 was divided into four sub steps. The simulation results through the Step 1 identified the parameters for simulation of the Step 2. Basic parameters of the materials (buffer material, backfill material, rock mass, concrete, sand) were provided by JAEA. Special parameters which research team needed were identified by back analysis of Step 1. Most notably the mechanical behaviour of swelling and displacement depended on the applied model (elastic model or elastoplastic model). Parameters such as Young’s modulus were found to need smaller values than characterised in the fundamental laboratory test results (Step 1-1, 1-2) for the elastic model. Although laboratory experiments are usually simple, test results contained some error. For example, if the saturation level is 100 % or higher, it should be considered an error. This situation was presented in the Step 1-3. A possible reason is that the buffer material is a mixture of bentonite and silica sand. When a specimen is cut to measure volume or weight, sand grains will affect the measurement data. In Step 2, boundary conditions such as temperature on the surface of the simulated overpack, heater power of the electrical heaters installed in the simulated overpack, injection pressure and inflow rate of the test water, were applied. The outer boundary conditions can be selected using measured data (injection pressure and inflow rate of the test water that is controlled by the injection systems installed in the sand layer around the buffer material and in the boundary between backfill material and concrete support). Since such measured data has some noise, research teams developed their own simplified boundary conditions. Inner boundary conditions can be selected using measured data as heater power and temperature on the surface of the simulated overpack. These data also contain some noise, so research teams developed their own simplified developed boundary conditions. Task D validated various approaches thorough the simulation of the in-situ full scale EBS system including backfill of the gallery: variations in the coupling processes (THM or THC), analysis codes, and boundary conditions. Temperature distribution in the buffer material was simulated well by all research teams. This means thermal behaviour is not sensitive to the simulation approaches. Although the water content distribution on the outside of the buffer material was well simulated by all research teams, the simulation results differ from the measured values inside the buffer material (at the centre and inside, near the simulated overpack). The buffer material is made from tap water, but in the in-situ experiment, saline groundwater infiltrates the buffer material. Therefore, the selection of the hydraulic parameters of the buffer material greatly affects the simulation results of the re saturation behaviour of the buffer material. In the Horonobe EBS experiment, measured values suitable for validating the simulation results were not obtained near the simulated overpack. When simulating the pressure and deformation of the buffer material, the measurement data is easily affected by the installation conditions of the measurement sensors, so verifying the measurement data itself remains an issue. Mechanical simulation results differ depending on whether they are considered as elastic or elastoplastic phenomena. The accuracy of measured in-situ data can be assessed by detailed analysis comparing sampling specimen analysis and measured data. The Horonobe EBS experiment is scheduled to be dismantled in the future (FY2026 and 2027). This detailed dismantling investigation will finally confirm the measured data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W