Full-Cycle Simulations of the Fermilab Booster

The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling Booster synchrotron will be doubled by raising the machine cycle frequency from 15 to 20 Hz and by increasing the injected beam intensity by a factor 1.5. This has to be accomplished without raising uncontrolled losses beyond the administrative limit of 500 W. In addition, slip-stacking efficiency in the Recycler, the next machine in the accelerator chain, sets an upper limit on the longitudinal emittance of the beam delivered by the Booster. As part of an effort to better understand potential losses and emittance blow-up in the Booster, we have been conducting full cycle 6D simulations using the code PyORBIT. The simulations include space charge, wall impedance effects and transition crossing. In this paper, we discuss our experience with the code and present representative results for possible operational scenarios.

43 PARTICLE ACCELERATORS↗

Space charge dominated momentum spread and compensation strategies in the post-linac section of Proton Improvement Plan-II at Fermilab

The upcoming Proton Improvement Plan-II (PIP-II), designated for enhancements to the Fermilab accelerator complex, features a new 800 MeV superconducting linac and a Beam Transfer Line (BTL) to transport the beam to the existing Booster synchrotron. To mitigate the space charge tune shift associated with a high intensity accumulated beam, the low emittance linac beam is used to paint the ring phase space both transversely and longitudinally. To prevent losses caused by particles injected outside the rf separatrix while painting longitudinal phase space, the momentum spread of the incoming beam should not exceed 2.1 x 10^-4. Detailed simulations showed that due to space charge, the rms momentum spread increases to 4 x 10^-4 while it is transported in the BTL --about twice the allowable limit. In this paper, we outline a mitigation strategy involving a debuncher cavity. We discuss location, operating frequency, and gap voltage under both nominal and perturbed beam conditions, specifically accounting for momentum jitter. The impact of cavity misalignments is also assessed. The paper concludes by recommending an optimized configuration.

43 PARTICLE ACCELERATORS↗

A Tool for Longitudinal Beam Dynamics in Synchrotrons

A number of codes are available to simulate longitudinal dynamics in synchrotrons. Some established ones include TIBETAN, LONG1D, ESME and ORBIT. While they embody a wealth of accumulated wisdom and experience, most of these codes were written decades ago and to some extent they reflect the constraints of their time. As a result, there is an interest for updated tools taking better advantage of modern software and hardware capabilities. At Fermilab, the PIP-II project has provided the impetus for development of such a tool. In this contribution, we discuss design decisions and code architecture. A selection of test cases based on an initial prototype are also presented.

43 PARTICLE ACCELERATORS↗

Multipole Effects Study for Project X Front End Cavities

Effects of RF field asymmetry along with multipoles have been studied in Project X front end cavities. One family of half wave resonators operating at 162.5 and two of spoke resonators operating at 325 MHz have been analysed. HWR and spoke res onators unlike elliptical cavities, do not have axial symmetry, hence a quadrupole perturbation to the beam is present. The purpose of this paper is to explain the approach and the calculation method used to understand and overcome the drawbacks due to th e RF field asymmetry.

43 PARTICLE ACCELERATORS↗

Conceptual Design of the Project-X 1.3 GHz, 3-8 GeV Pulsed Linac

The Project-X, a multi-MW proton source, is under development at Fermilab. It enables a Long Baseline Neutrino Experiment via a new beam line pointed to DUSEL in Lead, South Dakota, and a broad suite of rare decay experiments. The facility co ntains 3-GeV 1-mA CW superconducting linac. In the second stage of about 5% of the H- beam is accelerated up to 8 GeV in a 1.3 GHz SRF pulse linac to Recycler/Main Injector. In order to mitigate the problem with the stripping foil heating during injection to the Main Injector, the pulses with higher current are accelerated in CW linac together with 1 mA beam for further acceleration in the pulse linac. The optimal current in the pulse linac is discussed as well as limitations that determine it's selection . A concept design of the pulse linac is described. The lattice design is presented as well as RF stability analysis. The necessity of the HOM couplers is discussed also.

43 PARTICLE ACCELERATORS↗

Physics Design of the Project X CW Linac

The general design of the 3 GeV superconducting CW linac of the Project X is presented. Different physical and technical issues and limitations that determine the linac concept are discussed. The results of the RF system optimization are pres ented as well as the lattice design and beam dynamics analysis.

43 PARTICLE ACCELERATORS↗

Longitudinal Stability of Recycler Bunches: Part I: Thresholds for Loss of Landau Damping

We examine the stability of intense flat bunches in barrier buckets used in the Recycler. We consider some common stationary distributions and show that they would be unstable against rigid dipole oscillations. We then discuss an analytical model for the line density that best describes measured bunch profiles. We include space charge in this model to predict the bunch intensity at which Landau damping would be lost. The dependence of this threshold on the bunch length is studied and related to the results of an experimental study with shorter bunch lengths. The threshold for the microwave instability is estimated. These studies will be followed by more detailed numerical studies.