Search NASA⌕ Search

Engineering topics

Ostroumov, P.

Publications and source records attributed to Ostroumov, P..

At least 19 records

Technological developments and accelerator improvements for the FRIB beam power ramp-up

The Facility for Rare Isotope Beams (FRIB) began operation with 1 kW beam power for scientific users in May 2022 upon completion of 8 years of project construction. The ramp-up to the ultimate beam power of 400 kW, planned over a 6-year period, will enable the facility to reach its full potential for scientific discovery in isotope science and applications. In December 2023, a record-high beam power of 10.4 kW uranium was delivered to the target. Technological developments and accelerator improvements are being made over the entire facility and are key to completion of the power ramp-up. Major technological developments entail the phased deployment of high-power beam-intercepting systems, including the charge strippers, the charge selection systems, the production target, and the beam dump, along with support systems, including non-conventional utilities (NCU) and remote handling facilities. Major accelerator improvements include renovations to aging legacy systems associated with experimental beam lines and system automation for improved operational efficiency and better machine availability. Experience must be gained to safely handle the increased radiological impacts associated with high beam power; extensive machine studies and advanced beam tuning procedures are needed to minimize uncontrolled beam losses for the desired operating conditions. This paper discusses the technological developments and accelerator improvements with emphasis on major R&D efforts.

43 PARTICLE ACCELERATORS↗

Flux Expulsion and Material Properties of Niobium Explored in 644-650 MHz Cavities

Upcoming projects requiring high-Q ~650 MHz medium-to-high-${\beta}$ elliptical cavities drive a need to understand magnetic RF loss mechanisms and mitigations in greater detail. High-temperature annealing and fast-cooldowns have proven effective techniques for promoting magnetic flux expulsion in cavities, however the extent of their effectiveness has been observed to vary between niobium material lot and vendor. We explore the fast-cooldown method, and high-temperature annealing (900{\deg}C) in 644-650 MHz cavities fabricated from two different niobium vendors: Tokyo-Denkai, and Ningxia. which promote flux-expulsion efficiency. Using EBSD and PPMS methods, we aim to trace cavity flux expulsion efficiency to specific, measurable properties of the bulk niobium material, which, if identified, can lead to methods by which the flux expulsion properties of Nb material can be predicted prior to cavity fabrication, and can enable fine-tuning of cavity temperature treatments.

43 PARTICLE ACCELERATORS↗

Flux expulsion and material properties of Nb

Upcoming projects requiring high-Q ~650 MHz medium-to-high-! elliptical cavities drive a need to understand magnetic RF loss mechanisms and mitigations in greater detail. We explore the fastcooldown method, and high-temperature annealing (900°C) in 644- 650 MHz SRF cavities fabricated from two different niobium vendors: Tokyo-Denkai (TD), and Ningxia (NX). Using EBSD and PPMS methods, we aim to trace cavity flux expulsion efficiency to specific, measurable properties of the bulk niobium material, which, if identified, can lead to methods by which the flux expulsion properties of Nb material can be predicted prior to cavity fabrication.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Strategies in Education, Outreach, and Inclusion to Enhance the US Workforce in Accelerator Science and Engineering

We summarize the community-based consensus for improvements concerning education, public outreach, and inclusion in Accelerator Science and Engineering that will enhance the workforce in the USA. The improvements identified reflect the product of discussions held within the 2021-2022 Snowmass community planning process by topical group AF1: Beam Physics and Accelerator Education within the Accelerator Frontier. Although the Snowmass process centers on high-energy physics, this document outlines required improvements for the entire U.S. accelerator science and engineering enterprise because education of those entering and in the field, outreach to the public, and inclusion are inextricably linked.

43 PARTICLE ACCELERATORS↗

Commissioning Status of the Linac for the Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams will be completed in late 2021. Here, we report here on the current efforts to commission the first stages of the 200-MeV/u superconducting, continuous wave heavy-ion linac. The statuses of the cryogenic plant and its distribution system, the accelerator cryomodule commissioning and operations, the ion source and front end transport development, the radio-frequency quadrupole commissioning, and then beam dynamics development to support high-power operation are reviewed. Plans for commissioning the remainder of the linac systems are presented.

43 PARTICLE ACCELERATORS↗

Design of the Multi-Ion Injector Linac for the JLAB EIC (JLEIC)

An Electron Ion Collider (EIC) is the highest priority for future U.S. accelerator-based nuclear physics facility following the completion of the Facility for Rare Isotope Beams (FRIB). Two laboratories are competing to host the future EIC: Brookhaven National Lab. (BNL) and Jefferson Lab. (JLab). The baseline design of JLab's Electron Ion Collider (JLEIC) ion complex comprises a pulsed superconducting (SC) linac injector capable of accelerating all ions from protons to lead, where proton and light ion beams can be polarized. After reviewing the design requirements for the injector linac, important design choices such as the room-temperature (RT) section design, the transition energy between the RT and SC sections and the stripping energy for heavy ions will be discussed. The design of the different linac sections will be presented as well as the results of end-to-end beam dynamics simulations for polarized deuterons and unpolarized lead ions.

Mustapha, B.↗

Advances of the FRIB project

The Facility for Rare Isotope Beams (FRIB) Project has entered the phase of beam commissioning starting from the room-temperature front end and the superconducting linac segment of first 15 cryomodules. With the newly commissioned helium refrigeration system supplying 4.5K liquid helium to the quarter-wave resonators and solenoids, the FRIB accelerator team achieved the sectional key performance parameters as designed ahead of schedule accelerating heavy ion beams above 20MeV/u energy. Thus, FRIB accelerator becomes world’s highest-energy heavy ion linear accelerator. We also validated machine protection and personnel protection systems that will be crucial to the next phase of commissioning. FRIB is on track towards a national user facility at the power frontier with a beam power two orders of magnitude higher than operating heavy ion facilities. Here, this paper summarizes the status of accelerator design, technology development, construction, commissioning as well as path to operations and upgrades.

43 PARTICLE ACCELERATORS↗

Charge Breeding of Radioactive Isotopes at the CARIBU Facility

An Electron Beam Ion Source Charge Breeder (EBIS-CB) has been developed at Argonne National Laboratory as part of the californium rare ion breeder upgrade. For the past year, the EBIS-CB has been undergoing commissioning as part of the ATLAS accelerator complex. It has delivered both stable and radioactive beams with A/Q < 6, breeding times < 30 ms, low background contamination, and charge breeding efficiencies > 18% into a single charge state. The operation of this device, challenges during the commissioning phase, and future improvements will be discussed. Published by AIP Publishing.

Vondrasek, Richard↗

The PIP-II Conceptual Design Report

The Proton Improvement Plan-II (PIP-II) encompasses a set of upgrades and improvements to the Fermilab accelerator complex aimed at supporting a world-leading neutrino program over the next several decades. PIP-II is an integral part of the strategic plan for U.S. High Energy Physics as described in the Particle Physics Project Prioritization Panel (P5) report of May 2014 and formalized through the Mission Need Statement approved in November 2015. As an immediate goal, PIP-II is focused on upgrades to the Fermilab accelerator complex capable of providing proton beam power in excess of 1 MW on target at the initiation of the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) program, currently anticipated for the mid- 2020s. PIP-II is a part of a longer-term goal of establishing a high-intensity proton facility that is unique within the world, ultimately leading to multi-MW capabilities at Fermilab....

43 PARTICLE ACCELERATORS↗

High Gradient Accelerating Structures for Carbon Therapy Linac

Carbon therapy is the most promising among techniques for cancer treatment, as it has demonstrated significant improvements in clinical efficiency and reduced toxicity profiles in multiple types of cancer through much better localization of dose to the tumor volume. RadiaBeam, in collaboration with Argonne National Laboratory, are developing an ultra-high gradient linear accelerator, Advanced Compact Carbon Ion Linac (ACCIL), for the delivery of ion-beams with end-energies up to 450 MeV/u for 12C6+ ions and 250 MeV for protons. In this paper, we present a thorough comparison of standing and travelling wave designs for high gradient S-Band accelerating structures operating with ions at varying velocities, relative to the speed of light, in the range 0.3-0.7. In this paper we will compare these types of accelerating structures in terms of RF, beam dynamics and thermo-mechanical performance.

Kutsaev, Sergey↗

BEAM DYNAMICS STUDIES FOR A COMPACT CARBON ION LINAC FOR THERAPY

Feasibility of an Advanced Compact Carbon Ion Linac (ACCIL) for hadron therapy is being studied at Argonne National Laboratory in collaboration with RadiaBeam Technologies. The 45-meter long linac is designed to deliver 109 carbon ions per second with variable energy from 45 MeV/u to 450 MeV/u. S-band structure provides the acceleration in this range. The carbon beam energy can be adjusted from pulse to pulse, making 3D tumor scanning straightforward and fast. Front end accelerating structures such as RFQ, DTL and coupled DTL are designed to operate at lower frequencies. The design of the linac was accompanied with extensive end-to-end beam dynamics studies which are presented in this paper.

Plastun, A.↗

Transmission efficiency measurement at the FNAL 4-rod RFQ

This paper presents measurements of the beam transmission performed on the 4-rod RFQ currently under operation at Fermilab. The beam current has been measured at the RFQ exit as a function of the magnetic field strength in the two LEBT solenoids. This measurement is compared with scans performed on the FermiGrid with the beam dynamics code TRACK. A particular attention is given to the impact, on the RFQ beam transmission, of the space-charge neutralization in the LEBT.

43 PARTICLE ACCELERATORS↗

The Project-X Injector Experiment: A Novel High Performance Front-End for a Future High Power Proton Facility at Fermilab

A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are carrying out a program of research and development aimed at integrated systems testing of critical components comprising the front end of Project X. This program, known as the Project X Injector Experiment (PXIE), is being undertaken as a key component of the larger Project X R&D program. The successful completion of this program will validate the concept for the Project X front end, thereby minimizing a primary technical risk element within Project X. PXIE is currently under construction at Fermilab and will be completed over the period FY12-17. PXIE will include an H- ion source, a CW 2.1-MeV RFQ and two superconductive RF (SRF) cryomodules providing up to 25 MeV energy gain at an average beam current of 1 mA (upgradable to 2 mA). Successful systems testing will also demonstrate the viability of novel front end technologies that are expected find applications beyond Project X.

Nagaitsev, S.↗