Search NASA⌕ Search

Engineering topics

Ostroumov, Peter

Publications and source records attributed to Ostroumov, Peter.

The High Rigidity Spectrometer at the FRIB: Magnet Development Status

This paper presents the 2025 progress of the High Rigidity Spectrometer (HRS) project at the Facility for Rare Isotope Beams (FRIB). We report on the construction and testing of the first-article HRS-High Transmission BeamLine (HTBL) magnets. An HTBL dipole magnet has successfully completed cold testing, achieving full magnetic performance without quenching, and is now ready for field mapping at FRIBs offline test bench. HTBL quadrupole triplet coils have been fabricated and tested, with all coils reaching their design currents, some following initial training quenches. Furthermore, the preliminary design of the large-scale, large-aperture SPectrometer Section (SPS) magnets has progressed to determine the baseline of the downstream HRS-SPS subproject in 2025. This includes the introduction of novel magnet designs, such as the sweeper dipole magnet, the sector dipole magnet, and iron-free coil-dominated quadrupole magnets, representing a significant scale breakthrough and a first for FRIB.

Choi, Yoonhyuck↗

Optimizing the sextupole configuration for simultaneous correction of third order resonances at the recycler ring

For the Recycler Ring at Fermilab, space charge tune shifts of almost 0.1 will have to be dealt with under the Proton Improvement Plan (PIP-II) framework. This will lead to the excitation of third order resonances. The minimization of Resonance Driving Terms (RDTs) allows to mitigate the harmful effect of these betatron resonances. Past work has shown that previously-installed sextupoles can compensate the RDTs of individual third order resonance lines, thus reducing particle losses in these operational regimes. Nevertheless, trying to compensate multiple resonances of the same order simultaneously with these existing sextupoles is limited due to current constraints in the magnets. The following study showcases the procedure to install additional sextupoles in order to aid the compensation of multiple resonances. This includes the optimization of the new sextupoles' locations in order to cancel out multiple RDTs while minimizing the currents needed. This is followed by a verification of their effectiveness by means of the RDT response matrix.

43 PARTICLE ACCELERATORS↗

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

Compensation of Third-order Resonances in the High Intensity Regime

As the Fermilab Accelerator Complex enters the high-intensity era, the Recycler Ring (RR) needs to mitigate the detrimental effect of third-order resonance crossing. Third-order resonance lines can be compensated to first order by cancelling out the global Resonance Driving Terms (RDTs) using the response matrix method. This compensation scheme has been proven to work at low intensities, i.e., in the single-particle regime. In order to evaluate the effectiveness of this compensation scheme at higher intensities, this study looks at dynamic and static tune scans, with and without resonance compensation, and different space charge tune shifts. Special care was taken in order to disentangle effects from space charge tune shift, structure resonances and space charge driven resonances.

43 PARTICLE ACCELERATORS↗

Simultaneous Compensation of Third-Order Resonances at the FNAL Recycler Ring

Third-order resonance lines will have a detrimental effect on the high-intensity operation of the Recycler Ring (RR), under the current Proton Improvement Plan (PIP-II) for the Fermilab Accelerator Complex. Increasing intensity will increase space charge effects, leading to the excitation of normal and skew sextupole lines. Dedicated normal and skew sextupoles have been installed in order to mitigate the effect of these resonance lines. By measuring the response matrix of the third-order Resonance Driving Terms (RDTs) to the currents of these dedicated elements, this study shows how several resonance lines can be compensated simultaneously. Resonance compensation is experimentally verified through loss maps and emittance growth measurements using the Ion Profile Monitor (IPM) system in the Recycler.

43 PARTICLE ACCELERATORS↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Developments Towards FRIB Upgrade to 400 MeV/u for Heaviest Uranium Ions

High-Q₀ medium-velocity (beta opt = 0.6) 5-cell elliptical cavities for superconducting linacs are critical technology for advancing current and future projects such as the Proton Improvement Plan II linac and the proposed energy upgrade of Michigan State University’s Facility For Rare Isotope Beams linac, FRIB400. Previous work established the validity of the novel geometry of the FRIB400 prototype 644 MHz 5-cell elliptical β = 0.65 cavities for future high Q₀ development. In collaboration with FNAL, two leading-edge high-Q₀ recipes, N-doping and Mid-T baking, were tested in the 5-cell format. 2/0 N-doping + cold electropolishing was successful at achieving FRIB400 and PIP-II Q₀ requirements, achieving an unprecedented 3.8 x 10¹⁰ at 17.5 MV/m, satisfying the FRIB400 Q₀ requirements by 1.75 times in a low-gauss environment. Mid-T baking exceeded FRIB400 Q₀ requirements by 1.4 times, and benefitted from decreased residual resistance compared to the N-doped cavity test. Systematic ultrasonic thickness measurements in single-cell revealed bulk (150 microns) EP with the modified EP tool is consistent across the inner surfaces of the cavity walls.

43 PARTICLE ACCELERATORS↗

Colloquium : Machine learning in nuclear physics

We report advances in machine learning methods provide tools that have broad applicability in scientific research. These techniques are being applied across the diversity of nuclear physics research topics, leading to advances that will facilitate scientific discoveries and societal applications. This Review gives a snapshot of nuclear physics research which has been transformed by machine learning techniques.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Third-Order Resonance Compensation at the FNAL Recycler Ring

The Recycler Ring (RR) at the Fermilab Accelerator Complex performs slip-stacking on 8 GeV protons, doubling the beam intensity delivered to the Main Injector (MI). At MI, the beam is accelerated to 120 GeV and delivered to the high energy neutrino experiments. Femilab’s Proton Improvement Plan II (PIP-II) will require the Recycler to store 50% more beam. Simulations have shown that the space charge tune shift at this new intensity will lead to the excitation of multiple resonance lines. Specifically, this study looks at normal sextupole lines 3 Q_{x}=76 and Q_{x}+2Q_{y}=74, plus skew sextupole lines 3 Q_{y}=73 and 2 Q_{x}+Q_{y}=75. Dedicated normal and skew sextupoles have been installed in order to compensate for these resonance lines. By measuring and calculating the Resonance Driving Terms (RDT), this study shows how each of the resonance lines can be compensated independently. Furthermore, this study shows and discusses initial investigations into compensating multiple lines simultaneously.

43 PARTICLE ACCELERATORS↗

First N-Doping and Mid-T Baking of Medium-ß 644 MHz 5-Cell Elliptical Superconducting RF Cavities for Michigan State University’s Facility for Rare Isotope Beams

Two hadron linacs currently under development in the US, the PIP-II linac at Fermi National Accelerator Laboratory (FNAL) and the upgrade for Michigan State University’s Facility For Rare Isotope Beams (FRIB), will employ 650 and 644 MHz ß-0.6 elliptical superconducting cavities respectively to meet their design energy requirements. The desired CW operation modes of these two linacs sets Q-factor requirements well above any previously achieved for cavities at this operating frequency and velocity, driving the need to explore new high-Q treatments. The N-doping technique developed at FNAL and employed at an industrial scale to the LCLS-II cryomodules is a strong candidate for high-Q treatments, but work is needed to refine the treatment to the lower operating frequency and velocity regime. We present the first results of the first N-doping tests and a "mid-T" bake test in the FRIB 644 MHz 5-cell elliptical cavities.

43 PARTICLE ACCELERATORS↗

Toward Qualifications of HB and LB 650 MHz Cavities for the Prototype Cryomodules for the PIP-II Project

High-beta (HB) and low-beta (LB) 650 MHz cryomodules are key components of the Proton Improvement Plan II (PIP-II) project. In this contribution we present the results of several 5-cell HB650 cavities that have been processed and tested with the purpose of qualifying them for the prototype cryomodule assembly, which will take place later this year. We also present the first results obtained in LB650 single-cell cavities process optimization. Taking advantage of their very similar geometry, we are also analyzing the effect of different surface treatments in FRIB’s 5-cell medium-beta 644MHz cavities. Cavities processed with N-doping and mid-T baking showed very promising results in term of both Q-factors and accelerating gradient for these low-beta structures.

43 PARTICLE ACCELERATORS↗