Search NASA⌕ Search

Engineering topics

Owen, P. D.

Publications and source records attributed to Owen, P. D..

Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility

Since the early 1990s, the in­jec­tor of the CEBAF ac­cel­er­a­tor at Jef­fer­son Lab has re­lied on a nor­mal-con­duct­ing RF graded-beta cap­ture sec­tion to boost the ki­netic en­ergy of the elec­tron beam from 100 / 130 keV to 600 keV for sub­se­quent ac­cel­er­a­tion using a cry­omod­ule hous­ing two su­per­con­duct­ing 5-cell cav­i­ties sim­i­lar to those used through­out the ac­cel­er­a­tor. To sim­plify the in­jec­tor de­sign and im­prove the beam qual­ity, the nor­mal-con­duct­ing RF cap­ture sec­tion and the cry­omod­ule will be re­placed with a new sin­gle booster cry­omod­ule em­ploy­ing a su­per­con­duct­ing, β = 0.6, 2-cell-cav­ity cap­ture sec­tion and a sin­gle, β = 0.97, 7-cell cav­ity. The Up­graded In­jec­tor Test Fa­cil­ity at Jef­fer­son Lab is cur­rently host­ing the new cry­omod­ule to eval­u­ate its per­for­mance with beam be­fore in­stal­la­tion at CEBAF. While demon­strat­ing sat­is­fac­tory per­for­mance of the booster and good agree­ment with sim­u­la­tions, our beam test re­sults also speak to lim­i­ta­tions of ac­cel­er­a­tor op­er­a­tions in a noisy, ther­mally un­reg­u­lated en­vi­ron­ment.

Bruker, M. W.↗

HE Production Update at JLab - Introducing an Enhanced Nitrogen Purge for Clean String Assembly

A major limitation to cryomodule performance is field emission caused by particulates within the superconducting cavities. To reduce contamination of the inner surfaces during assembly in a cleanroom, the whole string can be connected to a purge system, which maintains a constant overpressure of dry, clean nitrogen gas. Following successes of similar systems at XFEL and Fermilab, Jefferson Lab followed this example for the production of LCLS-II HE cryomodules. Implementing this system required new procedures, infrastructure, and hardware, as well as significant testing of the system before production began. This paper will summarize the implemented controls and procedures, including lessons learned from Fermilab, as well as the results of mock-up tests. Based on the latter, the system was used to assemble the first article string in April 2022, and was also used during a rework required due to issues with cold FPC ceramics two months later. The benefits of using a purge system with regards to procedure, time savings, and added flexibility for potential rework have already proven to provide a significant improvement for the production of LCLS-II-HE cryomodules at Jefferson Lab.

Owen, P. D.↗

Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility

Since the early 1990s, the in­jec­tor of the CEBAF ac­cel­er­a­tor at Jef­fer­son Lab has re­lied on a nor­mal-con­duct­ing RF graded-beta cap­ture sec­tion to boost the ki­netic en­ergy of the elec­tron beam from 100 / 130 keV to 600 keV for sub­se­quent ac­cel­er­a­tion using a cry­omod­ule hous­ing two su­per­con­duct­ing 5-cell cav­i­ties sim­i­lar to those used through­out the ac­cel­er­a­tor. To sim­plify the in­jec­tor de­sign and im­prove the beam qual­ity, the nor­mal-con­duct­ing RF cap­ture sec­tion and the cry­omod­ule will be re­placed with a new sin­gle booster cry­omod­ule em­ploy­ing a su­per­con­duct­ing, β = 0.6, 2-cell-cav­ity cap­ture sec­tion and a sin­gle, β = 0.97, 7-cell cav­ity. The Up­graded In­jec­tor Test Fa­cil­ity at Jef­fer­son Lab is cur­rently host­ing the new cry­omod­ule to eval­u­ate its per­for­mance with beam be­fore in­stal­la­tion at CEBAF. While demon­strat­ing sat­is­fac­tory per­for­mance of the booster and good agree­ment with sim­u­la­tions, our beam test re­sults also speak to lim­i­ta­tions of ac­cel­er­a­tor op­er­a­tions in a noisy, ther­mally un­reg­u­lated en­vi­ron­ment.

Bruker, M. W.↗

Managing Procurements in the Time of Covid-19: SNS-PPU as a Case Study

In early 2020, COVID-19 swept across the world. The accelerator industry, like many others, was impacted by disease, delays, shortages, and new working conditions. All Thomas Jefferson National Accelerator Facility (JLab) employees were sent home in mid-March 2020, with many still working remotely now. At the time, JLab was working on the Proton Power Upgrade (PPU) to the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL). Procurements had been placed and were being managed, parts were being received and inspected. This paper details the JLab procurement plan for the SNS PPU project, and the mitigations that were developed to continue to support this project smoothly under the limitations imposed by COVID-19.

Wilson, K. M.↗

Status of SNS Proton Power Upgrade SRF Cavities Production Qualification

The Pro­ton Power Up­grade pro­ject at Oak Ridge Na­tional Lab’s Spal­la­tion Neu­tron Source (SNS PPU) cur­rently being con­structed will dou­ble the pro­ton beam power from 1.4 to 2.8 MW by adding 7 ad­di­tional cry­omod­ules, each con­tains four six-cell high beta (\beta = 0.81) su­per­con­duct­ing radio fre­quency cav­i­ties. The cav­i­ties were built by Re­search In­stru­ments, Ger­many, with all the cav­ity pro­cess­ing done at the ven­dor site, in­clud­ing elec­trop­o­l­ish­ing as the final ac­tive chem­istry step. All 28 cav­i­ties needed for 7 cry­omod­ules were de­liv­ered to Jef­fer­son Lab, ready to be tested. The cryo­genic RF qual­i­fi­ca­tions and he­lium ves­sel weld­ing were done at Jef­fer­son Lab. The per­for­mance largely ex­ceed the re­quire­ments, and greatly ex­ceeded the per­for­mance of the orig­i­nal SNS cav­ity pro­duc­tion se­ries. Here, we pre­sent the sum­mary of RF test on pro­duc­tion cav­i­ties to this date.

Dhakal, P.↗

Development of Helium Vessel Welding Process for SNS PPU Cavities

The Spallation Neutron Source Proton Power Upgrade cavities are produced by Research Instrument with all the cavity processing done at vendor sites with final chemistry applied to the cavity to be electropolishing. Cavities are delivered to Jefferson Lab, ready to be tested. One of the tasks to be completed before the arrival of production-ready PPU cavities is to develop a robust helium vessel welding protocol. We have successfully developed the process and applied it to three six-cell high beta cavities. Here, we present the summary of RF results, welding process development, and post helium vessel RF results.

Dhakal, P.↗

Status of SNS Proton Power Upgrade SRF Cavities Production Qualification

The Pro­ton Power Up­grade pro­ject at Oak Ridge Na­tional Lab’s Spal­la­tion Neu­tron Source (SNS PPU) cur­rently being con­structed will dou­ble the pro­ton beam power from 1.4 to 2.8 MW by adding 7 ad­di­tional cry­omod­ules, each con­tains four six-cell high beta (\beta = 0.81) su­per­con­duct­ing radio fre­quency cav­i­ties. The cav­i­ties were built by Re­search In­stru­ments, Ger­many, with all the cav­ity pro­cess­ing done at the ven­dor site, in­clud­ing elec­trop­o­l­ish­ing as the final ac­tive chem­istry step. All 28 cav­i­ties needed for 7 cry­omod­ules were de­liv­ered to Jef­fer­son Lab, ready to be tested. The cryo­genic RF qual­i­fi­ca­tions and he­lium ves­sel weld­ing were done at Jef­fer­son Lab. The per­for­mance largely ex­ceed the re­quire­ments, and greatly ex­ceeded the per­for­mance of the orig­i­nal SNS cav­ity pro­duc­tion se­ries. Here, we pre­sent the sum­mary of RF test on pro­duc­tion cav­i­ties to this date.

Dhakal, P.↗