Search NASA⌕ Search

Engineering topics

Owens, Skip

Publications and source records attributed to Owens, Skip.

A Pilot Study to Determine MBSE Utility for Process Modeling of Complex Interfaces

Modeling a full system or a complete interface between systems in a MBSE environment is a very large task and not all organizations will benefit enough from using MBSE to offset the effort that is required to do this. Completely modeling a system or interface is not necessary to evaluate the utility of MBSE for a specific application or organization. A small pilot can be executed over a short period of time that only models small portions of a system or interface and, if structured properly, this pilot can successfully demonstrate the utility of MBSE for an organization before having to invest a larger amount of resources to fully implement and deploy MBSE. This paper documents one such pilot that was conducted for NASA's Launch Services Program.

MBSE↗

Follow That Satellite: EO-1 Maneuvers Into Close Formation With Landsat-7

As the Landsat-7 (LS-7) spacecraft continued NASA's historic program of earth imaging begun over three decades ago, NASA launched the Earth Observing-1 (EO-1) spacecraft carrying examples of the next generation of LS instruments. The validation method for these instruments was to have EO-1 fly in a close formation behind LS-7 on the same World Reference System (WRS) path. From that formation hundreds of near-coincident images would be taken by each spacecraft and compared to evaluate improvements in the EO-1 instruments. This paper will address the mission analysis required to launch and maneuver EO-1 into the formation with LS-7 where instrument validation was to occur plus a summary of completing the formation acquisition. Each EO-1 launch opportunity that occurred on a different day of a LS-7 16-day repeat cycle required a separate and distinct maneuver profile.

DeFazio, Robert L.↗

Follow That Satellite: EO-1 Maneuvers into Closed Formation With Landsat-7

As the Landsat-7 spacecraft continued NASA's historic program of earth imaging, begun over three decades ago, NASA launched the Earth Observing-1 (EO-1) spacecraft carrying examples of the next generation of Landsat-7 instruments. The validation method for these instruments was to have EO-1 fly in a close formation behind Landsat-7 on the same World Reference System path. From that formation hundreds of near coincident images would be taken by each spacecraft and compared to evaluate improvements in the EO-1 instruments. This paper will address the mission analysis required to launch and maneuver EO-1 into the formation with Landsat-7 where instrument validation was to occur plus a summary of completing the formation acquisition. EO-1 is required to operate one minute +/- 6 seconds behind Landsat-7 during the period of co-fly imaging with a cross track separation of within + 3 kilometers. This separation time can also be stated as a one minute +/- 6 seconds time difference in the Mean Local Time (MLT) at the descending nodes. Achieving the required MLT is heavily dependent on the time of launch. The EO-1 launch window, which had to accommodate the dual payloads of EO-1 and SAC-C, was very limited ranging from 0 to 22 seconds over the 16 day Landsat-7 WRS repeat cycle during which EO-1 was launched. Each EO-1 launch opportunity that occurred on a different day of a Landsat-7 16 day repeat cycle required a separate and distinct maneuver profile. These profiles varied significantly in duration and amount of onboard propellant required to achieve them. EO-1 launched on a day judged to have "medium" resource requirements for achieving the formation with Landsat-7. To phase EO-1 one minute behind Landsat-7 in the along track direction, a series of altitude adjusts separated by specific drift intervals were executed. Additional maneuvers slightly changed the EO-1 inclination to maintain the MLT requirements. Orbit maneuvers were planned and executed within errors of less than 1.5 percent and propellant usage was near nominal consuming 3.4 kilograms out of a launch and early orbit budget of 11 kilograms. The pre-launch 3 -sigma propellant budget allowed for 1+ years of EO-1 mission life. The success of the EO-1 launch and early orbit operations provided sufficient propellant for nearly 4 years of on orbit operations. Special action taken during the EO-1 maneuver period involved some maneuver re-planning to reduce concerns about a potential close approach between EO-1 and Landsat-7. The result of this re-planning was a safer close approach and improvement in future formation acquisition planning.

DeFazio, Robert↗