Publications and source records attributed to Ozelis, J..

Successful International Validation Test Shipment of the PIP-II HB650 Cryomodule Transportation System

The PIP-II Project will receive fully assembled cryomodules from CEA and STFC-UKRI as in-kind contributions. Damage to these cryomodules during transport is understood to be a significant risk to the project, so an extensive testing and validation program has been executed to mitigate this risk. The centerpiece of this effort was the successful shipment, from FNAL to STFC-UKRI and back, of a prototype HB650 cryomodule with cold testing before and after shipment to verify no functionality changes from shipment. Building on an escalating test transport program, the prototype cryomodule was shipped to the UK and back using realistic logistics, handling, instrumentation, and planning. The process of executing this shipment, lessons learned, and plan moving forward will be presented here.

43 PARTICLE ACCELERATORS↗

PIP-II High Beta 650 Prototype Cryomodule Assembly Experience and Related Design Optimization

After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may have arisen from the transport of the cryomodule. While measurements taken at room temperature after the conclusion of shipment indicated that there were no negative impacts on cavity alignment, beamline vacuum, or cavity frequency, testing at 2K was required to validate other aspects such as tuner operation, cavity coupling, cryogenic system integrity, and cavity performance. Results of this latest round of limited 2K testing will be presented.

Ozelis, J.↗

Transfer of EP and Doping Technology for PIP-II HB650 Cavities from Fermilab to Industry

Fermilab has optimized the surface processing conditions for PIP-II high beta 650 MHz cavities. This encompasses conditions for bulk electropolishing, heat treatment, nitrogen doping, post-doping final electropolishing, and post-processing surface rinsing. The technology has been effectively transitioned to industry. This paper highlights the efforts made to fine-tune the process and to smoothly share them with the partner labs and an associated vendor.

Chouhan, V.↗

Impact of Solenoid Induced Residual Magnetic Fields on The Prototype SSR1 CM Performance

A prototype cryomodule containing eight Single Spoke Resonators type-1 (SSR1) operating at 325 MHz and four superconducting focusing lenses was successfully assembled, cold tested, and accelerated beam in the framework of the PIP-II project at Fermilab. The impact of induced residual magnetic fields from the solenoids on performance of cavities is presented in this contribution. In addition, design optimizations for the production cryomodules as a result of this impact are highlighted.

43 PARTICLE ACCELERATORS↗

Installation, commissioning, and testing of the HB650 CM at PIP2IT

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) powering the accelerator complex to provide the world’s most intense high-energy neutrino beam. This paper describes the conversion of the PIP-II Injector Test Facility (PIP2IT) cryogenic system into a test stand for PIP-II High-Beta 650 MHz (HB650) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). A description of the associated mechanical, electrical, and controls modifications necessary for testing HB650 cryomodules are provided. The cooldown and warmup requirements, procedures and associated controls logic is described.

43 PARTICLE ACCELERATORS↗

The Evaluation of Mechanical Properties of LB650 cavities

The PIP-II project’s LB650 cavities could potentially be vulnerable to mechanical deformation because of the geometric shape of the cavity due to reduced beta. The mechanical property of the niobium half-cell was measured following various heat treatments. The 5-cell cavities were tested in a controlled drop test fashion and the real-world road test. The result showed that the 900 C heat treatment was compatible with cavity handling and transportation during production. The test provides the bases of the transportation specification and shipping container design guidelines.

Holzbauer, J.↗

The Evaluation of Mechanical Properties of LB650 Cavities

The PIP-II project's LB650 cavities could potentially be vulnerable to mechanical deformation because of the geometric shape of the cavity due to reduced beta. The mechanical property of the niobium half-cell was measured following various heat treatments. The 5-cell cavities were tested in a controlled drop test fashion and the real-world road test. The result showed that the 900 $\deg$C heat treatment was compatible with cavity handling and transportation during production. The test provides the bases of the transportation specification and shipping container design guidelines.

43 PARTICLE ACCELERATORS↗

Impact of solenoid induced residual magnetic fields on the prototype SSR1 CM performance

A prototype cryomodule containing eight Single Spoke Resonators type-1 (SSR1) operating at 325 MHz and four superconducting focusing lenses was successfully assembled, cold tested, and accelerated beam in the framework of the PIP-II project at Fermilab. The impact of induced residual magnetic fields from the solenoids on performance of cavities is presented in this contribution. In addition, design optimizations for the production cryomodules as a result of this impact are highlighted.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Testing of PIP-II pre-production 650 MHz couplers in warm test stand and in cryomodule

650 MHz fundamental power couplers were developed for PIP-II project to deliver RF power for low-beta and high-beta elliptical cavities. Few prototypes were built and tested and after some modification we built 8 pre-production couplers (with few spares for vacuum side) for HB650 cryomodule. All couplers were successfully tested in pulse mode (up to 100kW) and in CW mode (up to 50kW) in test stand at full reflection at 8 phases. In baseline configuration with DC bias we do not see any multipactoring activity after short processing. We also tested power processing without bias for uncoated and TiN coated ceramic window. Results of these studies presented in this paper. One of the coupler was assembled on LB650 cavity and tested at cryogenic environment in STC cryostat at ~20kW power with full reflection at different reflection phase. We also demonstrated good result from power processing without bias for warm and cold cavity. Six couplers were assembled on HB650 cavities in pre-production cryomodule. Test results from cryomodule qualification is discussing in this paper.

43 PARTICLE ACCELERATORS↗