Performance of PIP-II high-beta 650 cryomodule after transatlantic shipping

After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may have arisen from the transport of the cryomodule. While measurements taken at room temperature after the conclusion of shipment indicated that there were no negative impacts on cavity alignment, beamline vacuum, or cavity frequency, testing at 2K was required to validate other aspects such as tuner operation, cavity coupling, cryogenic system integrity, and cavity performance. Results of this latest round of limited 2K testing will be presented.

43 PARTICLE ACCELERATORS↗

Optimization of static heat loads of the PIP-II cryomodules based on prototype HB650 cryomodule test results

During the first cool down of the prototype HB650 cryomodule (pHB650 CM), high static heat loads have been measured compared to the estimation. Several analysis and calculations have been performed to explain this difference which led to cool down this cryomodule two additional times. Before each cool down, repairs and upgrades have been done, and instrumentations were added to identify the issues and quantify their impact on the heat loads. Based on these findings, the production cryomodule design and assembly process have been updated to align the future heat loads measurements with the estimations.

43 PARTICLE ACCELERATORS↗

Status of the INFN LASA in-kind contribution to PIP-II project

The status of INFN LASA in-kind contribution to the PIP-II project at Fermilab is reported in this paper. The effort for the series production of the 38 INFN LASA designed, 5-cell cavities with beta 0.61 for the LB650 section of the linac commenced and the status of ongoing activities and major procurements is here conveyed. At the same time, preliminary tests on INFN LB650 cavity prototypes are progressing in order to optimize the complete preparation and qualification cycle. All cavities will be produced, and surface treated in industry to reach the unprecedented performances required, qualified through vertical cold test at state-of-the art infrastructures and delivered as installation ready at the string assembly site.

43 PARTICLE ACCELERATORS↗

Medium Temperature Furnace Baking of Low-beta 650 MHz Five-cell Cavities

Medium Temperature baking of low beta 650 MHz cavities was conducted in a UHV furnace. A systematic study of cavity surface resistance components, residual and BCS, was conducted, including analyzing surface resistance due to trapped magnetic flux. Cavities showed an average 4.5 nano-ohm surface resistance at 17 MV/m under 2 K, which meets PIP-II specifications with a 40% margin. The results provided helpful information for the PIP-II project to optimize the cavity processing recipe for cryomodule application. The results were compared to the 1.3 GHz cavity that received a similar furnace baking.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Latest Development of Electropolishing Optimization for 650 MHz Cavity

Electropolishing (EP) of 1.3 GHz niobium (Nb) superconducting RF cavities is conducted to achieve a desired smooth and contaminant-free surface that yields good RF performance. Achieving a smooth surface of a large-sized elliptical cavity with the standard EP conditions was found to be challenging. This work aimed to conduct a systematic parametric EP study to understand the effects of various EP parameters on the surface of 650 MHz cavities used in PIP-II linac. Parameters optimized in this study provided a smooth surface of the cavities. The electropolished cavities met the baseline requirement of field gradient and qualified for further surface treatment to improve the cavity quality factor.

43 PARTICLE ACCELERATORS↗

The Evaluation of Mechanical Properties of LB650 Cavities

The 650 MHz cavities have a stronger requirement of niobium mechanical properties because of the geometric shape of the cavity due to reduced beta. The mechanical property of the niobium half-cell was measured following various heat treatments. The 5-cell cavities were tested in a controlled drop test fashion and the real-world road test. The result showed that the 900C heat treatment was compatible with cavity handling and transportation during production. The test provides the bases of the transportation specification and shipping container design guidelines.

43 PARTICLE ACCELERATORS↗

HB650 Cryomodule Design: From Prototype to Production

In early 2023 the assembly of the prototype HB650 cryomodule (pHB650 CM) was completed and cold tests started to evaluate its performance. The lessons learned from the design, assembly and preliminary cold tests of this cryomodule, and from the design of the SSR2 pre-production cryomodule played a fundamental role during the design optimization process of the production HB650 cryomodule (HB650 CM). Several workshops have been organized to share experiences and solve problems. This paper presents the main design changes from pHB650 to the HB650 production cryomodules and their impact on the heat loads.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Test Shipment of the PIP-II 650 MHz Transport Frame Between FNAL to STFC-UKRI

The PIP-II Project will receive fully assembled cryomodules from CEA and STFC-UKRI as in-kind contributions. Damage to these cryomodules during transport is understood to be a significant risk to the project, so an extensive testing and validation program is in process to mitigate this risk. The centerpiece of this effort is the eventual shipment from FNAL to STFC-UKRI and back of a prototype HB650 cryomodule with cold testing before and after shipment to verify no functionality changes from shipment. Most recently, a test shipment to the UK and back using a cryomodule analog was completed using realistic logistics, handling, instrumentation, and planning. The process of executing this test shipment, lessons learned, and plan moving forward will be presented here.

43 PARTICLE ACCELERATORS↗