Search NASASearch

Engineering topics

Paley, William

Publications and source records attributed to Paley, William.

LBNF Target Complex Remote Handling

The Long Baseline Neutrino Facility (LBNF) near site at the Fermilab campus in Illinois, USA includes a target complex which houses a 1.5 – 1.8m long graphite neutrino production target, a pre-target baffle, three neutrino focusing horns (A,B,C), and a decay pipe 200m in length leading to an energy absorber / beam dump housed in an adjacent absorber building. The prompt dose rates are such that the Target Hall must be unoccupied while beam is on target. During maintenance periods, the Target Hall can be occupied by trained personnel. However, residual dose rates of activated components necessitate certain operations, such as the annual replacement of the target, be executed remotely by personnel located in a shielded room within the Target Hall. This presentation covers details designed into the infrastructure, equipment, and procedures to allow for successful execution of remote handling operations.

43 PARTICLE ACCELERATORS