Search NASA⌕ Search

Engineering topics

Pancake, Daniel

Publications and source records attributed to Pancake, Daniel.

Panel Session 120: Roundtable: Waste Management - Energy Facilities Contractor Operating Group (EFCOG WM)

This Roundtable focused on the WM EFCOG working group as they met to discuss a variety of issues of importance to US DOE waste management operations. The purpose of the WM EFCOG is to seek out and promote the best management and operating practices, cost effective technologies and disposal options for all waste streams generated at US DOE facilities whether destined for US DOE or commercial facilities. Each site representative provided a radioactive waste management lessons learned briefing. Panelists with presentations: Savannah River Site (SRS) Solid Waste Program Update (Kerri Crawford); Idaho Clean-up Project Status (Frederick Hughes); West Valley Demonstration Project Update - EFCOG Waste Management Working Group (John Rendall); Key Project Challenges and Successes (Kalli Shupe); EFCOG WMWG Challenging Waste Subgroup Update (Tammy Monday); CH TRU Difficult Waste Stream Processing Challenges (Daniel Pancake); Argonne Building 350 Clean-up Success Using Effective Work Control (Daniel Dilday); Problematic Waste Streams on the Oak Ridge Reservation (John Wrapp)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Combined Effort to De-Inventory the New Brunswick Laboratory of Plutonium Certified Reference Materials - 20504

To de-inventory plutonium Certified Reference Materials standards (CRMs) from the New Brunswick National Laboratory (NBL), the Argonne National Laboratory (ANL) and Savannah River National Laboratory (SRNL) formed a unique team. This teaming arrangement leveraged the different capabilities and expertise of both laboratories, helping to ensure the effort would be performed both safely and cost-effectively. With the NBL then physically housed on the ANL site, ANL served as the host-site, providing the necessary facilities and support services (e.g., supplying everything from hoods, loading equipment, and scales to Health Physics supports). From a packaging perspective, ANL's responsibilities focused mainly on characterizing and preparing the contents for shipment, followed by performing the Shipper of Record activities. With SRNL being the Package Design Authority of the 9978, the Type B packaging used for this effort, SRNL's scope included developing a Safety Analysis Report in Packaging (SARP) Letter Amendment to add the CRMs as authorized contents to the 9978. Recognizing competency, ANL prodigiously tasked SRNL to perform the actual loading of the CRMs into the 9978s, while physically on the ANL site. This paper details five different aspects of this effort. They are: 1. Characterization/validation of the CRM contents. 2. Development of the 9978 SARP Letter Amendment for the content change. 3. Development of the nitrogen inerting method to address SARP identified potential flammability concerns. 4. Renewal of the SRNL 9978 loading procedure. 5. Performance of the actual work execution activities. In 2017, the first nine packages were successfully loaded and shipped from NBL, while in 2019, the last ten were successfully loaded and planned for shipment. Without ANL leveraging SRNL's strengths, the de-inventorying of NBL of its plutonium CRMs would have likely taken many years longer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗