Search NASA⌕ Search

Engineering topics

Pappano, Peter J.

Publications and source records attributed to Pappano, Peter J..

Xe-100 Pebble Bed Small Modular Reactor: Solving Critical Challenges to Enable the Xe-100 Pebble Bed Advanced Reactor Concept (ARC) (Final Scientific and Technical Report)

This is the final progress report for the Department of Energy (DOE) – X Energy, LLC cooperative agreement DENE0008472. This report provides a high-level summary of the work performed during the entire period of performance, running from July 1, 2016 – June 30, 2022. This span of time covers the original 5-year award and a one year no-cost extension. There were four tasks within this project: (1) project management, (2) reactor design furtherance, (3) fuel development, and (4) Nuclear Regulatory Commission (NRC) engagement. Detailed reporting during execution of the project was provided by a total of 23 quarterly reports, 42 X-energy technical reports, and voluntary monthly update presentations. Other technical work products include 2 white papers and 2 Topical Report submitted to the Nuclear Regulatory Commission, 15 Potential Inventions documented, 4 patents issued, 3 patents pending, 8 peer reviewed journal articles, and 2 Oak Ridge National Laboratory Technical Manuscripts. All the X Energy milestones/deliverables were met early or on time and are archived in the DOE Office of Nuclear Energy’s Program Information Control System: Nuclear Energy under Fiscal Year 2016, Work Breakdown Structure 2.07 – X-Energy. All other work products are available to DOE upon request.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Design and License Application Development for TRISO-X (Final Scientific Technical Report)

This is the final progress report submitted by X-energy, LLC (XE) to the Department of Energy in support of cooperative agreement DE-NE0008745. This report provides a high-level summary of the work performed during the entire period of performance, running from August 24, 2018 – August 22, 2022. This span of time covers the original 3-year award and a one year no-cost extension. There were five tasks within this project: (1) project management, (2) systems engineering and studies, (3) TRISO-X Facility design, (4) facility license application development, and (5) support to application review. Detailed reporting during execution of the project was provided by a total of 16 quarterly reports, voluntary monthly update presentations, and annual summary presentations. Technical work products include 103 X-energy technical reports, 38 subcontractor (Centrus technical reports), 75 Nuclear Criticality Safety Evaluations/Calculation reports, and 272 miscellaneous design documents (e.g., Engineering Service Orders, Engineering Component Specifications, Procedures, Guidelines/Policies, Design and Interface Requirements documents, and Drawings). All 29 of the X Energy milestones/deliverables were met early or on time and are archived in the DOE Office of Nuclear Energy’s Program Information Control System: Nuclear Energy under Fiscal Year 2018, Work Breakdown Structure F.OA – Industry FOA FY 2018 Awards, F.03 – X-Energy TRISO-X Project. All other work products are available to DOE upon request.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗