Search NASA⌕ Search

Engineering topics

Parker, Brett

Publications and source records attributed to Parker, Brett.

The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

Progress on the design of the interaction region of the Electron-Ion Collider EIC

We present an update on the design of the Interaction Region (IR) for the the Electron Ion Collider (EIC) being built at Brookhaven National Laboratory (BNL). The EIC will collide high energy and highly polarized hadron and electron beams with a center of mass energy up to 140 GeV with luminosities of up to 10^34 /cm^2/s. The IR, located at RHIC's IR6, is designed to meet the requirements of the nuclear physics community as outlined in [1]. A second IR is technically feasible but not part of the project.The magnet apertures are sufficiently large to allow desired collision products to reach the far-forward detectors; the electron magnet apertures in the rear direction are chosen to be large enough to pass the synchrotron radiation fan. In the forward direction the electron apertures are large enough for non-Gaussian tails.The paper discusses a number of recent recent changes to the design. The machine free region was recently increased from 9 to 9.5 m to allow for more space in the forward direction for the detector. The superconducting magnets on the forward side now operate at 1.9 K, which helps crosstalk and space issues.

43 PARTICLE ACCELERATORS↗

Design Status of the Electron-Ion Collider

The Electron-Ion Collider is gearing up for "Critical Decision 2", theproject baseline with defined scope, cost and schedule.Lattice designs are beingfinalized, and preliminary component design is being carried out. Beam dynamicsstudies such as dynamic aperture optimization, instability and polarizationstudies, and beam-beam simulations are continuing in parallel. We report onthe latest developments and the overall status of the project, and presentthe plans for future activities.

43 PARTICLE ACCELERATORS↗

Detector Solenoid Compensation for the Electron-Ion Collider

The central detector in the present EIC design includes a 4 m long solenoid with an integrated strength of up to 12 Tm. The electron beam passes on-axis through the solenoid, but the hadron beam has an angle of 25 mrad. Thus the solenoid couples horizontal and vertical betatron motion in both electron and hadron storage rings, and causes a vertical closed orbit excursion in the hadron ring. The solenoid also couples the transverse and longitudinal motions of both beams, when crab cavities are also considered. In this paper, we present schemes for closed orbit correction and coupling compensation at the IP, including crabbing.

43 PARTICLE ACCELERATORS↗

3D Mechanical Analysis of a Compact Nb 3 Sn IR Quadrupole for EIC

Abstract-The Electron Ion Collider (EIC) will require large aperture quadrupole magnets for the Hadron beam in the insertion region. Key requirements include high field, compact size, and tight control of the fringe fields. A 120 mm aperture, 308.4 mm outer diameter actively shielded Nb 3 Sn quadrupole model is under development to support these goals. This work is being carried out by a collaboration of BNL, JLAB and LBNL. A compact shell-based structure preloaded with a bladder and key system was developed for this project. In this paper, the effect of the compact structure on the mechanical behavior was investigated. In particular, the impact of the assembly tolerances and coil size variations on the actual coil stresses and bladder pressures was computed and compared with results from larger bladder and key structures developed for the LHC IR. The longitudinal preload is provided by stainless steel rods. Differently from other bladder and key magnets, the rods are first preloaded axially before coil axial load is applied. This new design aims to increase the overall stiffness of the system and reduce the longitudinal coil displacement during powering. Based on the results of a 3D mechanical analysis, the preliminary preload targets for the EIC quadrupole assembly will be reviewed and discussed.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Electron Ion Collider Machine Detector Interface

Here we review the major physics requirements, accelerator challenges and some magnet design issues for the Machine Detector Interface (MDI) of an Electron Ion Collider (EIC) Interaction Region (IR). In order to fully exploit the rich physics potential of an EIC, an IR MDI team must balance a complex interplay that arises when combining hadron and electron collider accelerators in an optimized IR. The work described in this paper results from ongoing close collaboration between many people at BNL, JLab and other institutes to realize an EIC as the next, highest priority, future nuclear physics project.

43 PARTICLE ACCELERATORS↗

An Improved eRHIC Interaction Region Design without High Field Nb3sn Magnets

The Electron-Ion Collider (EIC) is envisioned as the next DOE Nuclear Physics facility. BNL is proposing eRHIC, a facility based on the existing RHIC complex as a cost effective realization of the EIC project with a peak luminosity of 1034 cm-2sec-1. An electron storage ring with an energy range from 5 to 18 GeV will be added in the existing RHIC tunnel. The beams will collide in up to two Interaction Regions (IRs). Balancing conflicting experimental physics and machine accelerator physics demands with realistic eRHIC IR magnet designs requires new concepts and careful attention to detail. We review recent work aimed at reducing IR magnet cost and at avoiding risk associated with using a high-field Nb3Sn actively shielded quadrupole that was present in an earlier design.

43 PARTICLE ACCELERATORS↗

Design of a tapered final focusing magnet for eRHIC

Presently the electron-ion collider eRHIC is underdesign, which aims to provide a facility with a peak luminosity of 10 34 cm –2 sec –1 . Particularly challenging in terms of magnet design are the IR magnets due to the close proximity of the electron and hadron beams. This paper outlines the design for the so-called Q1 rear side magnet, which is a double aperture quadrupole magnet 7.2 m from the interaction region. Due to space restrictions both magnets are housed in the same iron yoke. The aperture of the hadron quadrupole is relatively small, but requires high gradients. While the required gradient for the electron quadrupole is relatively small, the aperture of this magnet needs to accommodate the beam and allow the synchrotron radiation fan to pass through. To accomplish this both quadrupole magnets have a tapered aperture. Furthermore to keep the gradients constant along the length of the magnets a special winding pattern has been identified, which is described in this paper.

43 PARTICLE ACCELERATORS↗

A Superconducting Magnet Upgrade of the ATF2 Final Focus

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R&D FF prototype under construction at BNL.

43 PARTICLE ACCELERATORS↗

Scenarios for the ATF2 Ultra-Low Betas Proposal

The current ATF2 Ultra-Low beta proposal was designed to achieve 20nm vertical IP beam size without considering the multipolar components of the FD magnets. In this paper we describe different scenarios that avoid the detrimental effect of these multipolar errors to the beam size at the interaction point (IP). The simplest approach consists in modifying the optics, but other solutions are studied as the introduction of super-conducting wigglers to reduce the emittance or the replacement of the normal-conducting focusing quadrupole in the Final Doublet (NC-QF1FF) with a super-conducting quadrupole one (SC-QF1FF). These are fully addressed in the paper.

43 PARTICLE ACCELERATORS↗