Ground controlled robotic assembly operations for Space Station Freedom

A number of dextrous robotic systems and associated positioning and transportation devices are available on Space Station Freedom (SSF) to perform assembly tasks that would otherwise need to be performed by extravehicular activity (EVA) crewmembers. The currently planned operating mode for these robotic systems during the assembly phase is teleoperation by intravehicular activity (IVA) crewmembers. While this operating mode is less hazardous and expensive than manned EVA operations, and has insignificant control loop time delays, the amount of IVA time available to support telerobotic operations is much less than the anticipated requirements. Some alternative is needed to allow the robotic systems to perform useful tasks without exhausting the available IVA resources; ground control is one such alternative. The issues associated with ground control of SSF robotic systems to alleviate onboard crew time availability constraints are investigated. Key technical issues include the effect of communication time delays, the need for safe, reliable execution of remote operations, and required modifications to the SSF ground and flight system architecture. Time delay compensation techniques such as predictive displays and world model-based force reflection are addressed and collision detection and avoidance strategies to ensure the safety of the on-orbit crew, Orbiter, and SSF are described. Although more time consuming and difficult than IVA controlled teleoperations or manned EVA, ground controlled telerobotic operations offer significant benefits during the SSF assembly phase, and should be considered in assembly planning activities.

Parrish, Joseph C.↗

Opportunities for space station assembly operations during crew absence

Prior to Permanently Manned Capability (to be achieved approximately 21 months after the First Element Launch), the Space Station will be manned for less than 10 percent of its total staytime on orbit. The most intensive and critical Station assembly operations will occur during these early flights. Some robotic resources may be available to perform assembly operations while the Station crew is absent; however, the use of robotic devices for assembly operations during unmanned phases has not yet been adopted by the Space Station program. This paper studies the relevant aspects of teleoperated and autonomous assembly activities, and presents candidate assembly operations that could be performed during crew absence. From this analysis, the potential benefits of remote control of robotic resources can be weighed against any associated increase in cost and complexity that would accompany implementation of this capability.

Parrish, Joseph C.↗

Optimal use of human and machine resources for Space Station assembly operations

This paper investigates the issues involved in determining the best mix of human and machine resources for assembly of the Space Station. It presents the current Station assembly sequence, along with descriptions of the available assembly resources. A number of methodologies for optimizing the human/machine tradeoff problem have been developed, but the Space Station assembly offers some unique issues that have not yet been addressed. These include a strong constraint on available EVA time for early flights and a phased deployment of assembly resources over time. A methodology for incorporating the previously developed decision methods to the special case of the Space Station is presented. This methodology emphasizes an application of multiple qualitative and quantitative techniques, including simulation and decision analysis, for producing an objective, robust solution to the tradeoff problem.