Search NASA⌕ Search

Engineering topics

Patel, Keyur C.

Publications and source records attributed to Patel, Keyur C..

The DAWN Project's Transition to Mission Operations: on Its Way to Rendezvous with (4) Vesta and (1) Ceres

Dawn launched on 27 September 2007 on a mission to orbit main belt asteroids (4) Vesta in 2011 - 2012 and (1) Ceres in 2015. The operations team conducted an extensive set of assessments of the engineering subsystems and science instruments during the first 80 days of the mission. A major objective of this period was to thrust for one week with the ion propulsion system to verify flight and ground systems readiness for typical interplanetary operations. Upon successful conclusion of the checkout phase, the interplanetary cruise phase began, most of which will be devoted to thrusting. The flexibility afforded by the use of ion propulsion enabled the project to accommodate a launch postponement of more than 3 months caused by a combination of launch vehicle and tracking system readiness, unfavorable weather, and then conflicts with other launches. Even with the shift in the launch date, all of the science objectives are retained with the same schedule and greater technical margins. This paper describes the conclusion of the development phase of the project, launch operations, and the progress of mission operations.

launch operations↗

Spitzer Space Telescope : observatory desciption and performance

The Spitzer Space Telescope, the last of the four Great Observatories commissioned by the National Aeronautics and Space Administration, was successfully launched on August 25, 2003 from Kennedy Space Center. The engineering systems for Spitzer were developed by the Jet Propulsion Laboratory, Lockheed Martin Space Systems Company, and Ball Aerospace & Technology Corp. This paper provides an overview of Spitzer, a technical description of all the engineering subsystems, and the associated challenges involved in developing them to satisfy the mission requirements. In addition, this paper describes the performance of the engineering subsystems during the In-Orbit Checkout phase, the Science Verification phase, and the early portions of the Nominal Mission.

Space Infrared Telescope Facility (SIRTF)↗