Search NASA⌕ Search

Engineering topics

Pellicciotti, Joseph

Publications and source records attributed to Pellicciotti, Joseph.

GMI Instrument Spin Balance Method, Optimization, Calibration, and Test

The Global Microwave Imager (GMI) instrument must spin at a constant rate of 32 rpm continuously for the 3 year mission life. Therefore, GMI must be very precisely balanced about the spin axis and CG to maintain stable scan pointing and to minimize disturbances imparted to the spacecraft and attitude control on-orbit. The GMI instrument is part of the core Global Precipitation Measurement (GPM) spacecraft and is used to make calibrated radiometric measurements at multiple microwave frequencies and polarizations. The GPM mission is an international effort managed by the National Aeronautics and Space Administration (NASA) to improve climate, weather, and hydro-meteorological predictions through more accurate and frequent precipitation measurements. Ball Aerospace and Technologies Corporation (BATC) was selected by NASA Goddard Space Flight Center to design, build, and test the GMI instrument. The GMI design has to meet a challenging set of spin balance requirements and had to be brought into simultaneous static and dynamic spin balance after the entire instrument was already assembled and before environmental tests began. The focus of this contribution is on the analytical and test activities undertaken to meet the challenging spin balance requirements of the GMI instrument. The novel process of measuring the residual static and dynamic imbalances with a very high level of accuracy and precision is presented together with the prediction of the optimal balance masses and their locations.

Ayari, Laoucet↗

Development Testing and Subsequent Failure Investigation of a Spring Strut Mechanism

The NASA Engineering and Safety Center (NESC) and Lockheed Martin (LM) performed random vibration testing on a single spring strut development unit to assess its ability to withstand qualification level random vibration environments. Failure of the strut while exposed to random vibration resulted in a follow-on failure investigation, design changes, and additional development tests. This paper focuses on the results of the failure investigations referenced in detail in the NESC final report including identified lessons learned to aid in future design iterations of the spring strut and to help other mechanism developers avoid similar pitfalls.

Dervan, Jared↗

GMI Instrument Spin Balance Method, Optimization, Calibration and Test

The Global Microwave Imager (GMI) instrument must spin at a constant rate of 32 rpm continuously for the 3-year mission life. Therefore, GMI must be very precisely balanced about the spin axis and center of gravity (CG) to maintain stable scan pointing and to minimize disturbances imparted to the spacecraft and attitude control on-orbit. The GMI instrument is part of the core Global Precipitation Measurement (GPM) spacecraft and is used to make calibrated radiometric measurements at multiple microwave frequencies and polarizations. The GPM mission is an international effort managed by the National Aeronautics and Space Administration (NASA) to improve climate, weather, and hydro-meteorological predictions through more accurate and frequent precipitation measurements. Ball Aerospace and Technologies Corporation (BATC) was selected by NASA Goddard Space Flight Center to design, build, and test the GMI instrument. The GMI design has to meet a challenging set of spin balance requirements and had to be brought into simultaneous static and dynamic spin balance after the entire instrument was already assembled and before environmental tests began. The focus of this contribution is on the analytical and test activities undertaken to meet the challenging spin balance requirements of the GMI instrument. The novel process of measuring the residual static and dynamic imbalances with a very high level of accuracy and precision is presented together with the prediction of the optimal balance masses and their locations.

Ayari, Laoucet↗

Development Testing and Subsequent Failure Investigation of a Spring Strut Mechanism

The NASA Engineering and Safety Center (NESC) and Lockheed Martin (LM) performed random vibration testing on a single spring strut development unit to assess its ability to withstand qualification level random vibration environments. Failure of the strut while exposed to random vibration resulted in a follow-on failure investigation, design changes, and additional development tests. This paper focuses on the results of the failure investigations referenced in detail in the NESC final report [1] including identified lessons learned to aid in future design iterations of the spring strut and to help other mechanism developers avoid similar pitfalls.

Dervan, Jared↗

Passive Thrust Oscillation Mitigation for the CEV Crew Pallet System

The Crew Exploration Vehicle (CEV) was intended to be the next-generation human spacecraft for the Constellation Program. The CEV Isolator Strut mechanism was designed to mitigate loads imparted to the CEV crew caused by the Thrust Oscillation (TO) phenomenon of the proposed Ares I Launch Vehicle (LV). The Isolator Strut was also designed to be compatible with Launch Abort (LA) contingencies and landing scenarios. Prototype struts were designed, built, and tested in component, sub-system, and system-level testing. The design of the strut, the results of the tests, and the conclusions and lessons learned from the program will be explored in this paper.

Sammons, Matthew↗

Design, Development and Testing of the GMI Reflector Deployment Assembly

The GMI Reflector Deployment Assembly (RDA) is an articulating structure that accurately positions and supports the main reflector of the Global Microwave Imager (GMI) throughout the 3 year mission life. The GMI instrument will fly on the core Global Precipitation Measurement (GPM) spacecraft and will be used to make calibrated radiometric measurements at multiple microwave frequencies and polarizations. The GPM mission is an international effort managed by the National Aeronautics and Space Administration (NASA) to improve climate, weather, and hydrometeorological predictions through more accurate and frequent precipitation measurements1. Ball Aerospace and Technologies Corporation (BATC) was selected by NASA Goddard to design, build, and test the GMI instrument. The RDA was designed and manufactured by ATK Aerospace Systems Group to meet a number of challenging packaging and performance requirements. ATK developed a flight-like engineering development unit (EDU) and two flight mechanisms that have been delivered to BATC. This paper will focus on driving GMI instrument system requirements, the RDA design, development, and test activities performed to demonstrate that requirements have been met.

Guy, Larry↗

Design, Development and Testing of the GMI Launch Locks

Ball Aerospace will deliver the GPM Microwave Imager (GMI), to NASA as one of the 3 instruments to fly on the Global Precipitation Measurement (GPM) mission, for launch in 2013. The radiometer, when deployed, is over 8 feet tall and rotates at 32 revolutions per minute (RPM) can be described as a collection of mechanisms working to achieve its scientific objectives. This collection precisely positions a 1.2 meter reflector to a 48.5 degree off nadir angle while rotating, transferring electrical power and signals to and from the RF receivers, designs two very stable calibration sources, and provides the structural integrity of all the components. There are a total of 7 launch restraints coupling across the moving and stationary elements of the structure,. Getting from design to integration will be the focus of this paper.

Sexton, Adam↗

Independent Review Support for Phoenix Mars Mission Robotic Arm Brush Motor Failure

The Phoenix Project requested the NASA Engineering and Safety Center (NESC) perform an independent peer review of the Robotic Arm (RA) Direct Current (DC) motor brush anomalies that originated during the Mars Exploration Rover (MER) Project and recurred during the Phoenix Project. The request was to evaluate the Phoenix Project investigation efforts and provide an independent risk assessment. This includes a recommendation for additional work and assessment of the flight worthiness of the RA DC motors. Based on the investigation and findings contained within this report, the IRT concurs with the risk assessment Failure Cause / Corrective Action (FC/CA) by the project, "Failure Effect Rating "3"; Major Degradation or Total Loss of Function, Failure Cause/Corrective Action Rating Currently "4"; Unknown Cause, Uncertainty in Corrective Action."

McManamen, John P.↗

Hubble Space Telescope Fine Guidance Sensor Post-Flight Bearing Inspection

Aerospace mechanism engineering success stories often, if not always, consist of overcoming developmental, test and flight anomalies. Many times it is these anomalies that stimulate technology growth and more reliable future systems. However, one must learn from these to achieve an ultimately successful mission. It is not often that a spacecraft engineer is able to inspect hardware that has flown in orbit for several years. However, in February 1997, the Fine Guidance Sensor-I (FGS-1) was removed from the Hubble Space Telescope (HST) and returned to NASA Goddard Space Flight Center (GSFC) during the second Servicing Mission (SM2). At the time of removal, FGS-1 had nearly 7 years of service and the bearings in the Star Selector Servos (SSS) had accumulated approximately 25 million Coarse Track (CT) cycles. The main reason for its replacement was due to a bearing torque anomaly leading to stalling of the B Star Selector Servo (SSS-B) when reversing direction during a vehicle offset maneuver, referred to herein as a Reversal Bump (RB). The returned HST FGS SSS bearings were disassembled for post-service condition assessment to better understand the actual cause of the torque spikes, identify potential process/design improvements, and provide information for remedial on-orbit operation modifications. The methods and technology utilized for this inspection are not unique to this system and can be adapted to most investigation ai varying stages of the mechanism life from development, through testing, io post night evaluation. The systematic methods used for the HST Fine Guidance Sensor (FGS) SSS and specific findings are the subjects presented in this paper. The lessons learned include the importance of cleanliness and handling for precision instrument bearings and the potential effects from contamination. The paper describes in detail, the analytical techniques used for the SSS and their importance in this investigation. Inspection analytical data and photographs are included throughout the paper.

Pellicciotti, Joseph↗