High-Power X-ray Prototype Source Using Superconducting Accelerator for Radiological Source Replacement
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Pellico, William.
Explore the source record for details and available documents.
The energy consumption in accelerator structures during beam downtimes is a significant fraction of the overall energy budget. Accurate prediction of downtime duration could inform actions to reduce this energy consumption. The LCAPE project started in 2020 and develops artificial intelligence to improve operations in the FNAL control room by reducing the time to identify the cause of a beam outage, improving the reproducibility of labeling it, predicting their duration and forecasting their occurrence. We present our solution for incorporating information from ~2.5k monitored devices in near-real time to distinguish between dozens of different causes of down time. We discuss the performance of different techniques for modeling the state of health of the facility and we compare unsupervised clustering techniques to distinguish between different causes of down time.
The controls system at FNAL records data asynchronously from several thousand Linac devices at their respective cadences, ranging from 15Hz down to once per minute. In case of downtimes, current operations are mostly reactive, investigating the cause of an outage and labeling it after the fact. However, as one of the most upstream systems at the FNAL accelerator complex, the Linac’s foreknowledge of an impending downtime as well as its duration could prompt downstream systems to go into standby, potentially leading to energy savings. The goals of the Linac Condition Anomaly Prediction of Emergence (L-CAPE) project that started in late 2020 are (1) to apply data-analytic methods to improve the information that is available to operators in the control room, and (2) to use machine learning to automate the labeling of outage types as they occur and discover patterns in the data that could lead to the prediction of outages. We present an overview of the challenges in dealing with time-series data from 2000+ devices, our approach to developing an ML-based automated outage labeling system, and the status of augmenting operations by identifying the most likely devices predicting an outage.
The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam intensities that have not been seen before \cite{PIP2,RCS_LOI}. The ambitious beam program relies on multi-turn H$^{-}$ injection into the FNAL Booster and then extracted into delivery rings or the Booster Neutrino Beam (BNB) 8 GeV HEP program. A new rapid-cycling synchrotron (RCS) will be required to reach the LBNF goal of 2.4 MW because of intense space-charge limitations. There are many accelerator engineering challenges that are already known and many that will be discovered. This proposal calls for an intermediate step that will both facilitate the operation of Booster in the PIP-II era and gain operational experience associated with high power injection rings. This step includes the design, construction and installation of a 0.8 GeV accumulator ring (upgradeable to 1+ GeV) to be located in the PIP-II Booster Transfer Line (BTL). The PIP-II accumulator ring (PAR) may be primarily designed around permanent magnets or use standard iron core magnet technology with an aperture selected to accommodate the desired high intensity protons at 0.8 GeV.
Fermilab and the HEP community invest significant resources into liquid argon detectors. The largest and most expensive of these detectors will be located in the Deep Underground Neutrino Experiment (DUNE). However, recent experiences have shown that there are limited avenues of monitoring, intervention, and interaction in the internal liquid environment. This proposal shows a technological path that could provide a valuable tool to ensure or at least improve the management of these HEP detectors. The development of a robotic system named Argonaut will demonstrate several technologies including 1) demonstration of suitable mobility of a small robotic device at liquid argon temperatures, 2) demonstration of wireless communication, 3) demonstration of improved diagnostics capabilities - such as tunable optics with motion control, 4) demonstration of interconnectivity of a robotic system with hardware residing within the detector. This initial research will be a seed for extended development in cold robotics and associated technologies. This work will allow FNAL to contribute a significant technology capability to recent efforts to cryogenic detector operations.