Search NASA⌕ Search

Engineering topics

Peter Carrato

Publications and source records attributed to Peter Carrato.

NASA Centennial Challenge: 3D Printed Habitat, Phase 3 Final Results

NASA's Centennial Challenges program uses prize competitions with the goal of accelerating innovation in the aerospace industry. Competitions in the Centennial Challenges portfolio have previously focused on advancements in space robotics, regolith excavation, bio-printing, astronaut suit design, small satellites, and solar-powered vehicles. NASA's Three Dimensional (3D) Printed Habitat Centennial Challenge represents a partnership between NASA and the non-profit partner: Bradley University, with co-sponsors Caterpillar, Bechtel, Brick and Mortar Ventures, the American Concrete Institute, and the United States Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) to spur development in automated additive construction technologies. The challenge asks teams to design and construct a scaled and simulated Martian habitat using indigenous materials and large scale 3D automated printing systems. Phase 1 of the competition, held in 2015, was an architectural design competition for habitat concepts that could be 3D printed. Phase 2, completed in 2017, asked teams to develop feedstocks from indigenous materials and hydrocarbon polymer recyclables, and demonstrate automated printing systems to manufacture these feedstocks into test specimens to assess mechanical strength. This paper will discuss the Phase 3 competition, focusing on technology outcomes that can potentially be infused into both terrestrial and planetary construction applications. The Phase 3 competition was divided into two sub-competitions: 1) virtual construction, where teams created a high fidelity building information model (BIM) of their 3D-printed habitat design and 2) the construction competition, which required teams to 3D print a structural foundation and subject materials samples to freeze/thaw testing and impact testing (level 1), produce a habitat element and complete a hydrostatic test (level 2), and additively manufacture a 1:3 scale habitat onsite in a head to head competition at Caterpillar, inc.'s Edwards Demonstration & Learning Center near Peoria, Illinois over the course of three days (level 3). While the Phase 2 competition focused primarily on the development of novel feedstocks and robotic printing systems, Phase 3 emphasized the scale-up of these systems and autonomous operation (demonstrating the capability to operate systems on precursor missions prior to the arrival of crew, or terrestrially in field operation settings where human tending of a manufacturing system may be limited). The Phase 3 virtual construction levels yielded a number of novel habitat designs, including both modular habitats and vertically-oriented habitat concepts. The Phase 3 construction competition also challenged teams to autonomously place penetrations and interfacing elements in additively manufactured structures. The paper will emphasize potential applications for the new materials and technologies developed under the umbrella of the competition within NASA's portfolio and in Earth-based applications such as disaster response and infrastructure improvement.

Construction↗

Nasa Centennial Challenge: Three Dimensional (3d) Printed Habitat, Phase 3

NASA's Centennial Challenges program uses prize competitions with the goal of accelerating innovation in the aerospace industry. Competitions in the Centennial Challenges portfolio have previously focused on advancements in space robotics, regolith excavation, bio-printing, astronaut suit design, small satellites, and solar-powered vehicles. NASA's Three Dimensional (3D) Printed Habitat Centennial Challenge represents a partnership between NASA and the non-profit partner: Bradley University, with co-sponsors Caterpillar, Bechtel, Brick and Mortar Ventures, the American Concrete Institute, and the United States Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) to spur development in automated additive construction technologies. The challenge asks teams to design and construct a scaled and simulated Martian habitat using indigenous materials and large scale 3D automated printing systems. Phase 1 of the competition, held in 2015, was an architectural design competition for habitat concepts that could be 3D printed. Phase 2, completed in 2017, asked teams to develop feedstocks from indigenous materials and hydrocarbon polymer recyclables, and demonstrate automated printing systems to manufacture these feedstocks into test specimens to assess mechanical strength. This paper will discuss the Phase 3 competition, focusing on technology outcomes that can potentially be infused into both terrestrial and planetary construction applications. The Phase 3 competition was divided into two sub-competitions: 1) virtual construction, where teams created a high fidelity building information model (BIM) of their 3D-printed habitat design and 2) the construction competition, which required teams to 3D print a structural foundation and subject materials samples to freeze/thaw testing and impact testing (level 1), produce a habitat element and complete a hydrostatic test (level 2), and additively manufacture a 1:3 scale habitat onsite in a head to head competition at Caterpillar, inc.'s Edwards Demonstration & Learning Center near Peoria, Illinois over the course of three days (level 3). While the Phase 2 competition focused primarily on the development of novel feedstocks and robotic printing systems, Phase 3 emphasized the scale-up of these systems and autonomous operation (demonstrating the capability to operate systems on precursor missions prior to the arrival of crew, or terrestrially in field operation settings where human tending of a manufacturing system may be limited). The Phase 3 virtual construction levels yielded a number of novel habitat designs, including both modular habitats and vertically-oriented habitat concepts. The Phase 3 construction competition also challenged teams to autonomously place penetrations and interfacing elements in additively manufactured structures. The paper will emphasize potential applications for the new materials and technologies developed under the umbrella of the competition within NASA's portfolio and in Earth-based applications such as disaster response and infrastructure improvement.

Centennial challenge↗

Lunar Mega Project: Processes, Work Flow and Terminology of the Terrestrial Construction Industry versus the Space Industry

Recent developments around the world show an increased interest and international activity toward developing a lunar surface human and robotic presence with a long term, sustainable vision. In Europe, the construction of a "Moon Village" has been proposed, and China has stated its intention to build a research station with a crew at the lunar South Pole. Russia stated it will land cosmonauts on the Moon in the 2030's. India has sent an orbiter, a robotic lander, and rover to the Moon. The USA intends to land the first woman and a man on the Moon by 2024 to initiate a sustained human lunar presence.A lunar research station with associated commercial activities will require infrastructure to become a permanent capability. Landing and launch pads, propellant storage and distribution farms, spacecraft access and handling structures, cranes, blast protection berms or walls, roads, graded areas, dust stabilized areas, foundations, parking lots, radiation shelters, micro-meteorite protection hangars, habitats and other human shelters, greenhouse farms, utility trenches, power plants, industrial water and oxygen extraction plants, communications antenna towers, thermal protection, mining zones, crater access and sub-surface access will be required to create a safe and sustainable lunar operations capability. This infrastructure will require significant construction activities in an extreme environment, with risky and expensive operations. On Earth, there are similar large and expensive projects (>$1 Billion) in difficult locations that attract a lot of public attention. These are known as "Mega Projects" and examples include bridges, tunnels, highways, railways, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems. Large consortiums consisting of public and private entities typically implement these infrastructure Mega-Projects.This paper will compare the typical design process, project management process, and work flow in the terrestrial construction industry to the space industry in order to create a better understanding between the terrestrial construction industry and the space industry, to further enable collaboration on a lunar Mega Project to build infrastructure on the Moon. In addition, a glossary of respective industry terminology with annotated linkages and definitions has been compiled. This information will enable contracts and business practices to be formulated for generating requests for proposals (RFP) by governments to consortiums consisting of construction and space industry companies that will bid on Lunar Infrastructure Projects that could lead to contracts to build the permanent capabilities.

Robert P Mueller↗

Overview of NASA's Break the Ice Lunar Challenge

The goal of NASA’s Artemis program is to return to the Moon and put in place a sustainable infrastructure that will enable permanent presence on the Moon. In-Situ Resource Utilization (ISRU) is critical in making the permanent presence on the Moon possible. One of the most important of these resources is water. On the Moon, water is trapped in icy regolith at the lunar poles, including inside permanently dark and cold craters. Excavating icy regolith and extracting water from it needs development of technologies that can operate reliably in the extreme lunar environmental conditions. Prize competitions are a well-known way of accelerating the development of new technologies and have been successfully used throughout the history. NASA’s Centennial Challenges Program(CCP) has been developing and executing prize competitions for past 15 years. Several of these competitions resulted in breakthrough technologies for in-space and terrestrial applications. In 2019, NASA Space Technology Mission Directorate (STMD) tasked CCP to develop a challenge to address the technology gaps in the areas of Lunar Excavation, Manufacturing, and Construction. This paper provides the background, status and ongoing plans by CCP in developing “Break the Ice Lunar Challenge”. The challenge is scheduled to open for registration in late 2020. This challenge will enable the development of excavation technologies that can operate in the extreme conditions on the Moon.

centennial challenges↗

Overview of NASA’s Break the Ice Lunar Challenge Phase 1

As NASA works to extend human exploration of the solar system, a sustained presence on the Moon will be critical for developing and testing the technologies and systems needed for future missions to Mars and beyond. In situ resource utilization (ISRU)—the use of lunar materials for life support, fuel, energy, manufacturing, and construction—is necessary to limit the delivery of supplies from Earth. One of the most important of these resources is water. Water supports all life on Earth and will be critical to supporting human exploration beyond Earth. On the Moon, water is trapped in icy regolith at the lunar poles, including inside permanently dark and cold craters. Novel approaches are needed to excavate the icy regolith and transport it for processing in support of permanent human missions on the Moon. To accelerate the development of such approaches and to seek diverse ideas, NASA’s Centennial Challenges launched the Break the Ice Lunar Challenge in November 2020. Phase 1 of the challenge was focused on stimulating innovative approaches for excavating icy regolith and delivering water in extreme lunar environmental conditions. The challenge sought to incentivize solutions for maximizing water delivery while minimizing energy use and the mass of equipment required to be transported to the lunar surface. Submissions for phase 1 of the challenge were due in June 2021 and winners were announced in August 2021. This paper provides details about the execution of the challenge, solutions received, criteria used to select winning solutions, and status of the phase 2 of the challenge.

Naveen Vetcha↗