Search NASA⌕ Search

Engineering topics

Peterson, Zachary

Publications and source records attributed to Peterson, Zachary.

Guidelines for Home Energy Professionals: Standard Work Specifications (SWS) Maintenance Charter and Procedures

The SWS were built by industry, for industry, and DOE and NREL facilitated the process to create them. The goal of the SWS maintenance process is to continue the consensus-based engagement to ensure the SWS content remains a relevant resource for promoting industry- accepted practices and maintaining consistency throughout the industry. This SWS Maintenance Charter and Procedures document defines the SWS maintenance process to provide transparency to stakeholders in how the SWS are maintained.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

U.S. Department of Energy Solar Decathlon Competition Guide: 2021 Design Challenge and 2023 Build Challenge

The U.S. Department of Energy (DOE) Solar Decathlon® is a collegiate competition, comprising 10 Contests, that challenges student teams to design and build highly efficient and innovative buildings powered by renewable energy. The competition gives teams the option to participate in one of two Challenges: the Design Challenge or the Build Challenge. Teams entering the Design Challenge must select from seven allowable building types ("Divisions") to create their design. Teams entering the Build Challenge will build a residential unit locally and compete nationally. Whether participating in the Design Challenge or the Build Challenge, all teams are evaluated across 10 Contests. The Competition Guide outlines competition history and structure, descriptions of the 10 Contests, and competition details for both the 2021 Design Challenge and 2023 Build Challenge.

30 DIRECT ENERGY CONVERSION↗

Overcoming Challenges for DER Interconnection - Spotlight on Energy Storage

The Distributed Generation Integration Collaborative (DGIC) convened a half-day interactive workshop in Washington, D.C. on July 29, 2019. Organized by the Electric Power Research Institute (EPRI) and the National Renewable Energy Laboratory (NREL), the workshop explored a variety of issues related to the grid interconnection of energy storage and solar+storage systems, primarily on distribution.This document provides the workshop's proceedings as well as stakeholder perspectives, documented during a workshop breakout exercise, on a range of industry actions that can be undertaken to improve energy storage interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Overview of Distributed Energy Resource (DER) Interconnection: Current Practices and Emerging Solutions

This guidebook provides an overview of key issues for utilities and utility regulators to consider as deployments of distributed energy resources (DER) increase, including what has been tried in the field and emerging good practices. Topics covered include: Interconnection Applications and Application Processing; Interconnection Standards; Advanced Inverters; Impact Screening and Evaluation; Estimating Future DER deployments; Distribution System Upgrades and Planning in a DER context; Cybersecurity; Storage and Solar plus Storage Interconnection; and Cost Allocation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating the Role of Pre-Application Reports in Improving Distributed Generation Interconnection Processes

Several tools have emerged in recent years to increase data exchange and transparency in the distributed generation interconnection process with the goal of reducing interconnection costs. One example is pre-application reports. These reports are generated by a utility at the request of prospective interconnection applicants to provide technical information about a specific point of interconnection. Formal pre-application report processes have been established in 12 states at the distribution system level as well as at the transmission level by the Federal Energy Regulatory Commission. These reports are a relatively low-cost method of informing applicants of grid conditions and potential interconnection limitations early in the interconnection process. Thus, this information may encourage interconnection in locations with little to no detrimental impact to the grid and low interconnection costs. Increasing transparency of these grid conditions may also enable applicants to better plan for interconnection costs and requirements, such as system modifications and complex engineering studies. By providing these benefits, pre-application reports are expected to reduce the number of canceled interconnection applications. This report evaluates this hypothesis by quantifying the impact pre-application report processes have on application approval rate. To evaluate this hypothesis this analysis uses utility-reported distributed generation interconnection data from four utilities in Massachusetts. The analysis considers a four-year time period before and a five-year period after pre-application report process were implemented. The results indicate that once pre-application reports were required for projects 500 kilowatts and larger the approval rate of applications increased by 24%. This suggests that pre-application reports may decrease the percentage of canceled projects. However, due to data and other limitations, these results do not necessarily connote causation. This analysis is an important first step and a prerequisite for future analyses regarding the impact of pre-application reports. Other potential impacts also recognized during this analysis included reducing sunk costs and reducing the number of projects requiring a complex review. Collection of additional data would allow for forming more robust conclusions about these impacts in the future. Such data include circuit-level data, interconnection cost data, policy and regulatory background, national-level data, and utility and developer attributes. These data provide necessary context to account for interrelated factors while evaluating pre-application reports. Filling such knowledge gaps ultimately aids regulators in applying best practices within the industry. As more and more distributed energy resources are interconnected, these best practices will become an integral aspect of efficiently transitioning to an electric grid capable of meeting the needs of the 21st century.

14 SOLAR ENERGY↗