Innovative Approaches to the Decommissioning of a Redundant Plutonium Processing Facility - 20147

At Sellafield, in the North West of the United Kingdom (UK), there are a number of redundant plutonium processing facilities. Over the past three decades several decommissioning strategies have been deployed to clean up these redundant facilities. Whilst there have been many successes previously reported, there remain many challenges. As previously presented at WM2017 (Paper Ref 17081) some of these challenges have recently been addressed through a new approach which introduced a number of innovations. The purpose of these innovations is to seek ways to significantly reduce risks to both decommissioning personnel and the environment by minimising the extent of physical 'hands on' decommissioning activities and by simplifying the waste production process. This paper provides an update on the progress of these innovations since 2017. Additionally, the paper also provides details of the new decommissioning technologies which have been introduced over the past 2 years to enable the most challenging aspects of the redundant plutonium processing facility to be decommissioned. These new decommissioning technologies address challenges associated with the preparation of process vessels and pipework to enable their safe in-situ size reduction by remote means: - New decommissioning techniques have been introduced to allow penetrations to be remotely cut into process vessels and pipework to provide a means of accessing and controlling the venting of any potential hydrogen gas present. - Additionally, a new large scale bespoke remote diamond wire cutting machine has been designed and manufactured to enable the process vessels to be size reduced in situ. Both of these new cutting technologies have involved collaborative working with specialist equipment suppliers including extensive development, trialling demonstration and commissioning prior to bringing the equipment into operational service. Several years of work have now culminated in reaching the final stages of decommissioning of the redundant plutonium processing facility with decommissioning of the final process vessels now underway and completion expected by the end of 2019. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Approach to the Management of Waste Arising from the Decommissioning of a Redundant Plutonium Processing Facility - 17081

There are a number of redundant plutonium processing facilities located at Sellafield, in the North West of England within the United Kingdom (UK). Over past decades several decommissioning strategies have been deployed to clean up these redundant facilities. Whilst there have been many successes previously reported, there remain many challenges. Some of these challenges have recently been addressed through a new approach which introduces a number of innovations. The new approach seeks to significantly reduce risks to both decommissioning personnel and the environment by minimising the extent of physical 'hands on' decommissioning activities and by simplifying the waste production process. A large bagless transfer system has been engineered to allow the transfer of whole gloveboxes into crates. This leads to a significant reduction in hazardous 'hands on' work in a highly contaminated environment. The crates are consigned directly to interim storage on the Sellafield site. These hazard minimisation activities have only been made possible through the development and implementation of a new approach to criticality safety assessment. This new approach has recently completed active commissioning with the first waste being safely exported in June 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Liquor Activity Reduction (LAR) Programme - 12397

Waste material from the reprocessing of irradiated fuel has been stored under water for several decades leading to the water becoming highly radioactive. As a critical enabler to the decommissioning strategy for the Sellafield site, the Liquor Activity Reduction (LAR) programme has been established to provide a processing route for this highly radioactive liquor. This paper reviews the progress that has been made since the start of routine LAR transfer cycles (July 2010) and follows on from the earlier paper presented at WM2011. The paper focuses on the learning from the first full year of routine LAR transfer cycles and the application of this learning to the wider strategies for the treatment of further radioactive liquid effluents on the Sellafield site. During this period over 100,000 Curies of radioactivity has been safely removed and treated. The past year has witnessed the very successful introduction of the LAR programme. This has lead to hazard reduction at MSSS and demonstration that the SIXEP facility can meet the significantly increased challenge that the LAR programme represents. Part of the success has been the ability to predict and deliver a realistic production schedule with the availability of the MSSS, EDT and SIXEP facilities being central to this. Most importantly, the LAR programme has been successful in bringing together key stakeholders to deliver this work while integrating with the existing, day to day, demands of the Sellafield site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗