Search NASA⌕ Search

Engineering topics

Pfeffer, H.

Publications and source records attributed to Pfeffer, H..

Flattening the Field during Injection in the Fermilab Booster using Dipole Corrector Magnets

The FNAL Booster is a fast cycling 15 Hz resonant circuit synchrotron accelerating proton beam from 400 MeV to 8 GeV. The linac pulse injected into the Booster is ˜32 usec long and fills the ring by multi-turn charge-exchange injection. As part of the PIP-II project, the Booster injection energy and repetition rate will be increased to 800 MeV and 20 Hz respectively. Due to much reduced average current in the new superconducting PIP-II linac, the injection time will increase to 550us. A shorter machine cycle coupled to a longer injection time make flattening the injection porch B-field during injection important requirement for successful PIP-II operation. We aim to achieve: (1) flattening of the net bending during injection using dipole correctors, and (2) using a new system based on an Altera FPGA board, reduction of the cycle-to-cycle bending field variation caused by current jitter in the Gradient Magnet Power Supply (GMPS). While the flat injection scheme is essential to future PIP-II operations, it should also noticeably improve efficiency for present HEP operations.

43 PARTICLE ACCELERATORS↗

Design Challenges in High-Current Pulsed Striplines

The Long Baseline Neutrino Facility (LBNF) will produce the worlds most intense neutrino beam. Three series connected magnetic horns will require 5 kV, 300 kA, 800 $\mu$s pulses at a rate of 1.4 Hz to focus the beam. Connecting a single power supply to these focusing horns will require a low impedance connection measuring over 60 m in length. To meet the challenging requirements of connecting the horns to the power supply, this connection is engineered as a nine-conductor, high-current pulsed stripline. It must pass through a harsh radiation environment, be passively cooled, and have an operational lifetime of at least 30 years. This paper discusses mechanical and electrical considerations such as high-voltage holdoff, clamped joint performance, and Lorentz force mitigations in order to meet the specified requirements. The results of tests and experiments on several prototypes of key design features will be presented and discussed.

43 PARTICLE ACCELERATORS↗

A 300 kA Pulsed Power Supply for LBNF

The Long Baseline Neutrino Facility (LBNF) will produce the worlds most intense neutrino beam. Three series connected magnetic horns will require 5kV, 300kA, 800$\mu$s pulses at a rate of 0.7Hz to focus the beam. Fermilab has designed and built pulsed high current supplies for horns in the past. Pulsed currents of 205 kA for Neutrinos at Main Injector (NuMI - NOvA), focusing a 120 GeV beam, and 170 kA for Booster Neutrino Beam (BNB - MiniBooNE) for focusing an 8 GeV beam have been operational for about 18 years. While the magnetic horns are expected to be replaced, the LBNF horn power supply is expected to last the lifetime of the project, 30 years. A resonant, half sine wave pulser was used for NuMI and BNB and has many practical advantages. The system has impedance limited fault currents by design, albeit large ones. That along with the resonant behavior means that thyristor switches are well suited. Many fault modes of the system have also been calculated. Several circuit changes were incorporated so that a single fault can be tolerated. The supply must be reversable to enable both neutrinos and anti-neutrinos to be produced. These reversal requirements required a significant amount of mechanical design and consideration to allow for quick reversal of all the semiconductors.

43 PARTICLE ACCELERATORS↗

The ESA activities on future launchers

A future launcher development scenario depends on many assumptions, such as the impetus provided by the probability of future missions, and the political willingness of member states to undertake future developments. Because of the long timescale implied by a coherent launcher development, a step-wise approach within an overall future launcher development plan appears essential. The definition of development steps allows the launcher developments to be adapted to the driving external forces, so that no possible opportunity to Europe in the space launch business is missed out because of improper planning on the absence of a long term goal. The launcher senario, to be presented in 1985, forms part of Europe's overall STS plan for the future. This overall STS plan is one product of the complete STS LTPP, a first draft of which should exist by 1985, and which will be updated regularly to take into account the changing political and economic perspectives.

Pfeffer, H.↗