The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

MODBUS APPLICATION AT JEFFERSON LAB

Modbus is a client/server communication model. In our applications, the embedded Ethernet device XPort is designed as the server and a SoftIOC running EPICS Modbus is the client. The SoftIOC builds a Modbus request from parameter contained in a demand that is sent by the EPICS application to the Modbus Client interface. On reception of the Modbus request, the Modbus server activates a local action to read, write, or achieve some other action. So, the main Modbus server functions are to wait for a Modbus request on 502 TCP port, treat this request, and then build a Modbus response.

Yan, Jianxun↗

Superconducting Magnet Power Supply and Hard-Wired Quench Protection at Jefferson Lab for 12 GeV Upgrade

The superconducting magnet system in Hall B being designed and built as part of the Jefferson Lab 12 GeV upgrade requires powering two conduction cooled superconducting magnets - a torus and a solenoid. The torus magnet is designed to operate at 3770 A and solenoid at 2416 A. Failure Modes and Effects Analysis (FMEA) determined that voltage level thresholds and dump switch operation for magnet protection should be tested and analyzed before incorporation into the system. The designs of the quench protection and voltage tap sub-systems were driven by the requirement to use a primary hard-wired quench detection sub-system together with a secondary PLC-based protection. Parallel path voltage taps feed both the primary and secondary quench protection sub-systems. The PLC based secondary protection is deployed as a backup for the hard-wired quench detection sub-system and also acts directly on the dump switch. Here, we describe a series of tests and modifications carried out on the magnet power supply and quench protection system to ensure that the superconducting magnet is protected for all fault scenarios.